Arterial Street Rehabilitation for Riverside Drive 24th

Download Report

Transcript Arterial Street Rehabilitation for Riverside Drive 24th

Arterial Street Rehabilitation
for Riverside Drive
24th Street to 35th Street
Public Informational Meeting
July 22, 2014
Introductions
• Doug Helt, P.E.
City of Tulsa
Transportation Lead
• Brooke Caviness, P.E.
City of Tulsa
Senior Engineer / Project Manager
• Tim Morgan, P.E.
HNTB Corporation
Project Manager
Project Location Map
Overview
• Roadway Improvements
• Stormwater Improvements
• Water Main Improvements
• Sanitary Sewer Improvements
• Anticipated Project Schedule
• Questions
Roadway Improvements
Roadway Geometry Improved = Safer Drive
Roadway Improvements
• 35 mph Speed Limit
• Median Separation Through
Park
• Lane Widths Increased
• New Lighting (LED)
Roadway Improvements
Stormwater Improvements
• Travis Park RCB System
• Swan Creek RCB System
• Crow Creek Bridge Replaced
• Riverside Drive Storm System Upgraded
Stormwater Improvements
Pre-Project Storm Conveyance System
Stormwater Improvements
Post-Project Storm Conveyance System
Water Main Improvements
• Riverside Drive 12” Water Main
• Gathering Place 8” Water Main
• Creating Looped Water Main Systems
• Improved Function and Flow in Neighborhoods
Water Main Improvements
Pre Project Water Main Network
Water Main Improvements
Post Project Water Main Network
Sanitary Sewer Improvements
• Existing Systems are 60-100 years old
• Reconstruction of Major Sanitary Mains
• High Strength Fiberglass for New Systems
• No Impact to Users
Sanitary Sewer Improvements
Pre-Project Sanitary Sewer Network
Sanitary Sewer Improvements
Sanitary Sewer Replacements
Anticipated Project Schedule
• Fall 2014 - Construction Contract Award
• Winter 2014/2015 - Construction Begins
• Spring 2015 - Riverside Drive Closure
• 2016 - Riverside Drive Pavement Construction
• 2017 - Project Completed
Questions?