Transcript Document
1 Dantewada District – A Brief Profile 1 Geographical Location Latitude 180 46’48’’N to 190 28’30’’N Longitude 800 15’42’’E to 810 58’43’’E to 2 Borders of the District East West South North 3 Total Area 18,511 Sq. Km. 4 Tribal Development Blocks 1. 2. 3. 4. 5. 6. 7. 8. 9. 10. 11. 5 Gram Panchayat 6 Village Orissa Maharashtra State Andhra Pradhesh State Baster District Dantewada Kuwakonda Katekalyan Geedam Sukma Konta Chhindgarh Bijapur Bhopalpattnam Usoor Bhairamgarh 409 Total Villages Revenue Village Un-inhabited Villages Forest Village Marh Village 1354 1034 148 135 37 2 9 Population Total Population Male Female SC Population ST Population 55 per Sq.Km. 7,19,487 3,56,928 3,62,559 24,153 5,64,931 10 Population Density 11 Percentage of SC/ST SC – 3.5% ST - 79.5% 12 Literacy Total No. of Literates 1,76,944 (30% of population) Total Illiterates 5,42,543 (70% of population 13 Workforce Total Workers Main Workers Marginal Workers Non Workers 3,80,244 2,84,770 95,474 3,39,243 14 Rainfall Avg. Rainfall 1446.05 mm 15 Irrigated Area 6% 16 Patwari Circle 174 17 Revenue Inspector Circle 10 18 Main Occupation Agriculture, Collection of minor forest produce 19 Main Language / Dialects Hindi, Telugu / Gondi, Halbi, Dorla. 3 Strength 1. 2. 3. 4. 5. Forest wealth in plenty. Availability of mineral resources especially iron ore. Good amount of rain fall. Availability of surface water. Presence of national highways of national importance like NH-16 and NH-221. 6. Improving rate of literacy in district. 4 Weaknesses 1. NH-16 and NH-221 being the lone lifelines of the district (Road Blocks due to natural and man made disasters) 2. Poor / No connectivity in interior parts of the district 3. Poor Human Resource availability 4. Scattered settlements 5. Schools without buildings 6. Anganwadi centers without buildings 7. Poor rate of electrification 8. Dependency of the district to others for food grains and other essential supplies (PDS playing a very important role) 9. Limited food grain storage facility 10. Building less PDS centers 11. Poor health infrastructure 12. Drinking water problem in some parts. 5 13. Poor training facilities in district Opportunities 1. 2. 3. 4. Potential exist for processing of forest produces in the district. Water for irrigation not exploited to the full. Livelihood promotion opportunities. Promotion of Tourism as some places of historical importance exists in the district. 6 Threats 1. Naxalite problem Affected the social life of tribals Destruction of government infrastructure including school, anganwadi and similar kind of buildings Large scale killings Pockets in which the administration finds it extremely difficult to penetrate Large percentage of children still left out of schools 2. Un approachable areas 3. Provisions of forest conservation act withholding the developmental activities. 4. Lowest literacy rates and extremely poor opportunities for human resource development. 7 Participative planning • Planning for the village in Gram Sabhas • Collection of the plan from GPs at JPs • Meeting with CEOs and Other Departments • Compilation and prioritization of the proposals at ZP • Presented and kept for discussion at DPC • Approval of the DPC 8 Identification of Critical Gaps 1. 2. 3. 4. 5. 6. 7. 8. Weak connectivity Lack of Educational Facilities Un Electrified villages & Majara tolas Poor Health Infrastructure Housing for the poor Building less PDS Shops Building less Anganwadi centers Provision of Safe Drinking Water all. 9 Rationale of the Project • The BRGF is proposed for filling the gaps that come in the way of accelerated development much needed for Dantewada. • Funds available with different departments and agencies are considered before making proposals. 10 Rationale of the Project (Ctd…) • The project being an annual plan for the year 2007 – 08 and keeping in view the time limit of March’08 for the completion, the works are accordingly proposed. • The rest of the works including the emphasis on training and strengthening of PRIs and livelihood promotion shall be taken up in the coming years (2008 – 12). 11 Implementation Agencies • All the infrastructure works that are to be taken up shall be done through the concerned GP. • Drinking water related works and Vocational trainings shall be taken up by the department / agency concerned. 12 Fund flow and Implementation The action plan and the distribution of the allocation have been prepared according to the proportion of the urban and rural population as follows:- Area Population Percentage Rural 655744 91.14 (91%) 63743 8.85 (9%) Urban Total: - 719487 100 (100%) 13 Within the urban area the distribution system of fund has been prepared according to the population of the Urban Local Body :- ULB Population Fund Allocation Percentage Bacheli 20407 73.40 32.00 Kirandul 19053 67.63 29.47 Dantewada 8515 30.79 13.42 Geedam 5899 21.60 9.41 Sukma 9869 36. 53 15.92 Total: - 63743 229.41 100 14 ULBs 15% 33% 9% Bacheli Kirandul Dantewada Geedam 13% Sukma 30% 15 Within the Rural area because of sensitivity and Naxal Problem in some areas it is very difficult to continue the development works so the distribution system of fund has been prepared according to the proposals received from different parts of the district for the year 2007-08 Janpad Panchayat Fund allocation Percentage Dantewada 199.04 8.60 Katekalyan 220.92 9.55 Chhindgarh 210.55 9.10 Sukma 172.73 7.46 Konta 261.54 11.30 Usoor 113.88 4.92 Bijapur 174.76 7.55 Geedam 305.12 13.19 Bhairamgarh 248.91 10.76 Bhopalpattnam 197.59 8.54 Kuwakonda 207.99 8.99 Total :- 2313.03 100 16 Dantewada Katekalyan 9% 9% 9% Chhindgarh 10% Sukma 9% 11% Konta Usoor 7% 12% 8% 5% 11% Bijapur Geedam Bhairamgarh Bhopalpattnam Kuwakonda 17 Weak connectivity • Importance of roads in a district of 18511Sq. Kms. • Roads with PWD and BRO • PMGSY and NREGA • WBM roads in to Bituminous roads by BRGF during 2008 - 2012 • Culverts by NREGA and >4 mt. span in BRGF during 2007 – 08 • 340 lakhs 18 Education and Literacy • • • • • • • • Average literacy rate of 24% (2001) SSA Adult Literacy Campaign Primary and Middle schools by SSA Tribal Welfare Department Proposal from BRGF for Schools Repair and maintenance 650 lakhs 19 Electrification • 1354 sparsely populated villages, 909 electrified • 3826 majra tolas, 1187 electrified • 1183 taken up for electrification • Rajiv Gandhi Rural Electrification Program • CSEB has proposal for 146 Crores • CREDA and Solar energy • 95 lakhs for the year 2007 - 08 20 Health Infrastructure • • • • • Availability of doctors – biggest problem 11 CHCs, 346 PHCs + Sub Centers Buildingless and those need repair 208 lakhs for 2007 – 08 Residential quarters shall be proposed in the plan 2008 - 2012 21 Housing for the poor • 91998 BPL families • IAY provides 2894 for 2007 – 08 and 2200 for 2008 – 09 • After that, the BPL waiting list ends • It is proposed to take up housing for the rural poor during 2007 – 08 • 4600 houses for 1150.00 lakhs • In 2007 – 08, housing for urban poor is proposed for 13 lakhs 22 Community halls cum Training centers • Urban areas • For both training and also as a community hall • 7 for 17.5 lakhs at the cost of 2.5 lakhs each 23 Shopping complexes in rural areas • Comprising of 4 – 5 shops in selected villages • 150 lakhs • Dantewada Janpad is not taken up since the same can be taken through Nava Anjor • It is also proposed to dovetail this fund with SGSY infrastructure fund to increase the number and quality of shops 24 Cluster Resource Centers • One cluster for every 8 GPs • 51 clusters in the district • The provision is kept for human resource development and training • Including incentives for the data entry operators / computer assistants • 128.40 lakhs provided in the plan that amounts to 5 % of the fund availability 25 Anganwadis • Pre school training and Monitoring over malnutrition • 1771 Anganwadis in the district • 662 newly sanctioned • 328 taken up for this year while the remaining is proposed for the next year • 710.75 lakhs 26 Safe Drinking water to all • Hand pumps and extension of pipe line in bigger villages • 166 works for 108 lakhs 27 SUMMARY Sl. No. 1 2 Department / Agency 8 Rural Area Urban Area Rural Area 27 155 60.75 350.00 Tribal welfare dept. School/ Hostel Building 2 16 10.00 240.00 P.H.E Bore well/Overhead tank 32 136 40.00 68.00 C.R.E.D.A. Solar Electrification 11 22 11.00 24.00 Culverts/Bridges/ 0 48 0.00 240.00 Shoping complex 0 10 0.00 150.00 Capacity Building of Clusters 5 11 11.40 117.00 Khadi Gramodyog Vocational Training 7 35 7.00 35.00 Handlooms Vocational Training - 6 - 42.00 Gram Panchayats (through Janpad Panchayat) 7 Urban Area Anganwadi Building 5 6 Estimated Cost I.C.D.S. 3 4 No. of works Type of Works 28 Handicrafts Vocational Training 1 2 3.55 7.00 Health Dept. Sub-Primary Health Center 10 PDS Center (GP) PDS Building 11 Urban Local Body/ Gram Panchayat Community Building/Houses for the poor Urban Local Body / C.S.E.B. Street lighting Urban Local Body / P.H.E. Public Urinal & Toilets 9 12 13 Total :- 3 15 18.00 90.00 13 - 22.00 - 1150.00 59 4600 30.50 77 - 10.36 16 - 4.85 253 710.00 229.04 - 2313.84 29 Allocation Anganwadi Building School/ Hostel Building Bore well/Overhead tank 0% 2% 2% 5% 8% 1% 0% 0% 1% 29% Solar Electrification 6% Culverts/Bridges/ 13% Shoping complex 3% 26% 4% Capacity Building of Clusters 30 Vocational Training BRGF - Backward Region Grand Fund Work District Sl. No. Janpad Panchayat Dantewada - South Bastar Janpad Panchayat Katekalyan Proposal of Rural Area Dantewada Janpad Panchayat Chhindgarh Janpad Panchayat Janpad Panchayat Sukma Konta Janpad Panchayat Usoor Proposal of Work 1 2 Unit Cost Unit Cost Unit Cost Unit Cost Unit Cost (In Lac) Unit Cost 3 4 5 6 7 8 9 10 11 12 13 14 1 I.C.D.S. 23 51.75 31 69.75 30 67.50 42 94.50 44 99.00 27 60.75 2 TWD 1 5.00 13 75.00 16 97.00 2 30.00 7 41.00 1 15.00 3 P.H.E 16 8.00 9 4.5 15 7.50 23 11.50 19 9.50 0 0.00 4 C.R.E.D.A. 3 7.37 3 5.03 1 2.20 1 3.60 2 17.20 0 0.00 5 Janpad Panchayat 22 113.84 9 56.56 2 27.27 2 24.13 2 31.84 2 26.13 6 Khadi Gramodyog 6 6.00 3 3.00 2 2.00 3 3.00 3 3.00 0 0.00 7 Handloom 1 7.08 1 7.08 1 7.08 0 0.00 0 0.00 0 0.00 8 Handicraft 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 9 Health 0 0.00 0 0.00 0 0.00 1 6.00 10 60.00 2 12.00 72 199.04 69 220.92 67 210.55 74 172.73 87 261.54 32 113.88 Total :- 31 d Fund Work Proposal of Urban Local Bodie ( 1 - 5 ) - South Bastar Dantewada Sl. No. Proposal of Work 1 2 Janpad Panchayat Bijapur Janpad Panchayat Geedam Janpad Panchayat Bhairamgarh Janpad Panchayat Bhopalpattanam Janpad Panchayat kuwakonda Total Unit Total Cost Unit Cost Unit Cost Unit Cost Unit Cost (In Lac) Unit Cost 15 16 17 18 19 20 21 22 23 24 25 26 1 I.C.D.S. 24 27.00 35 78.75 9 20.25 25 56.25 11 24.75 155 350 2 TWD 10 74.00 2 30.00 7 49.00 13 80.00 20 144.00 16 240 3 P.H.E 0 0.00 12 6.00 9 4.50 15 7.50 18 9.00 136 68 4 C.R.E.D.A. 1 2.20 3 4.13 6 28.95 0 0.00 2 2.83 22 24 5 Janpad Panchayat 2 25.56 29 159.98 15 95.13 2 23.84 2 22.41 89 507 6 Khadi Gramodyog 3 3.00 5 5.00 2 2.00 3 3.00 5 5.00 35 35 7 Handloom 0 0.00 2 14.16 1 7.08 0 0.00 0 0.00 6 42 8 Handicraft 0 0.00 2 7.10 0 0.00 0 0.00 0 0.00 2 7 9 Health 4 43.00 0 0.00 7 42.00 3 27.00 0 0.00 15 90 Total :32 ULBs 3 Contruction of overhand tank of water (2.5 lack Ltr.) 0 0 0 0 0 0.00 1 5.00 1 5.00 2 10.00 4 Construction of Aanganbadi Building with boundrywall 6 13.50 1 2.25 5 11.25 8 18.00 7 15.75 27 60.75 5 Construction of school building 0 0 0 0.0 0 0.00 2 10.00 0 0.00 2 10.00 6 Public distrubution system center (PDS) 1 2.00 2 4.00 2 0.00 4 8.00 4 8.00 13 22.00 7 Contruction of Community building/Training centre 1 2.50 1 2.50 1 2.50 2 5.00 2 5.00 7 17.50 7 1.75 5 1.25 8 2.00 17 4.25 15 3.75 52 13.00 0 0.00 0 0.00 0 0.00 0 0.00 1 8.00 1 8.00 0 0.00 3 0.00 50 7.00 12 1.68 12 1.68 77 10.36 0 0.00 0 0 3 3.00 5 5.00 3 3.00 11 11.00 12 Construction of public Urinal 0 0 0 0 5 1.00 5 1.00 5 1.00 15 3.00 13 Construction of public toilet 0 0 0 0 0 0 1 1.85 0 0.00 1 1.85 14 Wood Craft Training 1 3.55 0 0 0 0 0 0 0 0 1 3.55 15 Gramdyog Training 1 1.00 0 0 3 3.00 0 0.00 3 3.00 7 7.00 8 9 Construction of Residence quter for BPL family Construction of Ayurvedic Hospital Building 10 Electrification by Street light 11 Electrification by solar light system 33 16 Capacity Building 1 1.49 1 1.06 1 1.78 1 3.62 1 3.45 5 11.40 15 Electrification by solar light system 0 0.00 0 0 3 3.00 5 5.00 3 3.00 11 Construction of public Urinal 0 0 0 0 5 1.00 5 1.00 5 1.00 15 Construction of public toilet 0 0 0 0 0 0 1 1.85 0 0.00 1 Wood Craft Training 1 3.55 0 0 0 0 0 0 0 0 1 Gramdyog Training 1 1.00 0 0 3 3.00 0 0.00 3 3.00 7 Capacity Building 1 1.49 1 1.06 1 1.78 1 3.62 1 3.45 5 23 30.79 19 21.06 83 36.53 64 73.4 64 67.63 253 Total :- 34 Conclusion For the financial year 2007-08, the district is proposing to take up works estimated for rupees 2566.79 lakhs of which 91.14 % of the funds are earmarked for the rural areas considering the Gram Panchayats as the planning and implementation units (except certain works). The rest of the amount is proposed to be spent in the urban areas of the district. The critical gaps identified through a series of rigorous processes are again listed on the basis of priority to fulfil the gaps that are required very urgently to make the annual plan for the present financial year. It is proposed that the rest of the gaps shall be eventually taken care of in the perspective plan that is being made for the years 2008-12. 35 Expected outcomes • The project is prepared keeping the time limit in mind (March ’08) • Urgently required infrastructure shall be made during the current year while the rest of the proposals shall be taken up in the consequent years of the plan • Skill up gradation shall be the important aspect in the livelihood sector 36 THANK YOU