Transcript Slide 1
Migrating from Exaquantum to PImaking the most of hard earned history David Carr Oceanagold Limited OCEANIA OCEANIA OCEANIA TECHNOLOGY TECHNOLOGY TECHNOLOGY SEMINAR SEMINAR SEMINAR 2008 20082008 © 2008 © 2008 OSIsoft, OSIsoft, Inc. |Inc. Company | Company Confidential Confidential 1 Introduction • • • • • Company background Drivers for change Migration plan Outcomes Obtaining value from history OCEANIA TECHNOLOGY SEMINAR 2008 © 2008 OSIsoft, Inc. | Company Confidential 2 About Oceanagold • Largest Gold producer in New Zealand – 180,000oz pa over last 4 years – Forecasting >280,000oz in 2008 • Listed on the Toronto, ASX and NZX • 2 operating mines in NZ 800km apart – Reefton, West Coast producing 75,000 oz in pyrite concentrate – Macraes, Otago producing 220,000oz from local ore and processing Reefton concentrate OCEANIA TECHNOLOGY SEMINAR 2008 © 2008 OSIsoft, Inc. | Company Confidential 3 Macraes Site • Commenced operations in 1990 treating 1.5Mtpa • 2007 throughput 5.7Mtpa • Complex metallurgical process plant – 2 stage Grinding circuit – sulphide flotation – Pressure oxidation – Carbon in Leach – Concentrate repulp and regrinding facility • Extensive circuit development over the last 10 years to increase throughput and maximise recovery – Commissioning first M1000 Isamill in May 07 – Commissioning worlds largest flotation cells –Outotec 300m3 Nov 07 – Autoclave capacity and debottlenecking critical to maximising cashflow OCEANIA TECHNOLOGY SEMINAR 2008 © 2008 OSIsoft, Inc. | Company Confidential 4 Macraes Site OCEANIA TECHNOLOGY SEMINAR 2008 © 2008 OSIsoft, Inc. | Company Confidential 5 Existing Systems • Yokogawa CS3000 DCS since 2005 – Upgraded from hybrid CS1000 and uXL system • Exaquantum PIMS system installed in 2002 – Installed for long term trending – Plant reporting and logsheets • Pronto XI for Purchasing, Maintenance, GL • Numerous Access & Excel files for lab results & reporting OCEANIA TECHNOLOGY SEMINAR 2008 © 2008 OSIsoft, Inc. | Company Confidential 6 Issues with existing PIMS • Disk space usage – 85MB/day for 2000 points • Speed of response • Data retrieval speed slow • Local support not available • Significant issues with each upgrade • Trending tool unfriendly to novice users, slow to configure displays • Windows Domain Authentication • Poor acceptance and utilisation of data OCEANIA TECHNOLOGY SEMINAR 2008 © 2008 OSIsoft, Inc. | Company Confidential 7 Goals from shifting to PI • Collect instrument data from DCS • Collect Alarm & Event data from DCS • Migrate existing history into PI Archive – 130GB of instrument data over last 5 years • Automate alerts via email/SMS • Remote access to data via Citrix OCEANIA TECHNOLOGY SEMINAR 2008 © 2008 OSIsoft, Inc. | Company Confidential 8 Proof of Concept • Test system set up on site – OPC interface configured to CS3000 system – OPC A&E interface configured to CS3000 system – PI-EqCtr COM Connector established to Exaquantum system – Email alerts set up using PI-ACE and Module database – Electronic logsheets rewritten & expanded for PI – Manual/lab data captured through VBA in Excel – History migrated from Exaquantum to PI for test tagsTECHNOLOGY SEMINAR 2008 OCEANIA © 2008 OSIsoft, Inc. | Company Confidential 9 Equipment used • Leading edge server hardware • Secure location • Controlled environment Compaq laptop P4 1.6Mhz 750MB RAM OCEANIA TECHNOLOGY SEMINAR 2008 © 2008 OSIsoft, Inc. | Company Confidential 10 Implementation plan • Based on success of test system approval to proceed with base system – 3,000 tag base server – PI-ACE for reporting automation – Processbook/Datalink client software • IT Department sourced server hardware – HP-DL360 Blade Server • Utilise existing PC hardware for clients and API node OCEANIA TECHNOLOGY SEMINAR 2008 © 2008 OSIsoft, Inc. | Company Confidential 11 Migration method-Receiving Server • Take point database from demonstration system • Install PI Server on a spare machine with date set to 2002 • Create points from test system, turn compression off • Stop PI, set time to trial system start and force archive shift • Delete “empty” archive from 2002-2007 • Create fixed archives for intervening time OCEANIA TECHNOLOGY SEMINAR 2008 © 2008 OSIsoft, Inc. | Company Confidential 12 Migration method-Exaquantum Source • • • • • • • • Install PI Server software on desktop PC Configure PI-EQ COM Connector to Exaquantum Create points from test system with PI-EQ source Set up PI to PI Interface between COM server and Migration server Run PItoPI interface to transfer data in time series order between systems Run for 3-month time slices, check for errors after each archive Periodic pause to restore Exaquantum history for transfer P4 2.8GHz desktop, 512MB RAM OCEANIA TECHNOLOGY SEMINAR 2008 © 2008 OSIsoft, Inc. | Company Confidential 13 Migration-Combine Systems • Setup production HP Blade server • Perform clean install of PI Software to final path • Stop PI on test system and change IP Address • Move test system Dat and Archives to new server • Copy across archives created on receiving system • Register copied archives on production OCEANIA TECHNOLOGY SEMINAR 2008 © 2008 OSIsoft, Inc. | Company Confidential 14 Data Flows Clients Production Server D e m o S e r v e r Exaquantum Server OGL LAN Router API Interface Node Receiving Server COM Source Server DCS LAN CS-3000 Operator Stations OCEANIA TECHNOLOGY SEMINAR 2008 © 2008 OSIsoft, Inc. | Company Confidential 15 Data Flows Clients Production Server D e m o S e r v e r Exaquantum Server OGL LAN Router API Interface Node Receiving Server DCS LAN CS-3000 Operator Stations OCEANIA TECHNOLOGY SEMINAR 2008 © 2008 OSIsoft, Inc. | Company Confidential 16 Data Flows Clients Production Server D e m o S e r v e r Exaquantum Server OGL LAN Router API Interface Node DCS LAN CS-3000 Operator Stations OCEANIA TECHNOLOGY SEMINAR 2008 © 2008 OSIsoft, Inc. | Company Confidential 17 Data Flows Clients Production Server Exaquantum Server OGL LAN Router API Interface Node DCS LAN CS-3000 Operator Stations OCEANIA TECHNOLOGY SEMINAR 2008 © 2008 OSIsoft, Inc. | Company Confidential 18 Timing • Set up test system mid march • Proof of basic functionality and data transfer by mid April • Finalise hardware and software requirements, SLA in May • Port historical data in July • Merge test system and historical archives onto final server August OCEANIA TECHNOLOGY SEMINAR 2008 © 2008 OSIsoft, Inc. | Company Confidential 19 Speed of transfer • 1GB fixed archives created for each 3 month period • Approximately 24 hours per 1 month of data • Data compression turned off to speed up • Data loaded in time series order to speed up • Done in smaller time slices to catch errors OCEANIA TECHNOLOGY SEMINAR 2008 © 2008 OSIsoft, Inc. | Company Confidential 20 Disc space requirements • Historical raw data used up 123GB • Transferred to new system used < 12GB • Overestimated disc space needed OCEANIA TECHNOLOGY SEMINAR 2008 © 2008 OSIsoft, Inc. | Company Confidential 21 System uses • • • • • • • Long term trending Automated email alerts Concentrate inventory management Remote monitoring and diagnosis Production reporting Throughput optimisation Daily production review OCEANIA TECHNOLOGY SEMINAR 2008 © 2008 OSIsoft, Inc. | Company Confidential 22 Control room monitoring • • • • Fast trending in DCS limited to 256 points per station Multi-monitored PC in control room Operator customised trend displays Free up DCS stations for fault resolution OCEANIA TECHNOLOGY SEMINAR 2008 © 2008 OSIsoft, Inc. | Company Confidential 23 Utilise History • Review of operating parameters last 4 years • Commissioning new equipment – May 2007 startup of M1000 Isamill regrind circuit – August 2007 Batch processing of Reefton Concentrate – November 2007 startup of Outotec 300m3 flotation cells • Autoclave throughput increase by 0.2tph Sulphur – 0.1tph Sulphur increase is worth $4,000/day OCEANIA TECHNOLOGY SEMINAR 2008 © 2008 OSIsoft, Inc. | Company Confidential 24 Email alerts • Automated notification of tank levels to suppliers • Critical equipment events to on call met • Alerts on critical faults – mill bearings • Out-of-box solution with existing OSI tools OCEANIA TECHNOLOGY SEMINAR 2008 © 2008 OSIsoft, Inc. | Company Confidential 25 Concentrate inventory management • Input movements through transport nodes into PI Tags • Present summary status in Processbook • EOM inventory tracking and scheduling from online inventory • Improved autoclave scheduling from online balance OCEANIA TECHNOLOGY SEMINAR 2008 © 2008 OSIsoft, Inc. | Company Confidential 26 Remote Access • Utilise existing IT Citrix Gateway or Remote OCEANIA TECHNOLOGY SEMINAR 2008 © 2008 OSIsoft, Inc. | Company Confidential 27 Reefton Minesite Integration • • • • Concentrate shipped 800Km to Macraes site Yokogawa CS3000 DCS onsite Server license expanded to 5,000 tags API node set up on site with OPC and OPC A&E interface • Data forwarded over WAN to Macraes server • Clients connect to Macraes server with PB & DL to access data • Full view of operating trends to both sites and remotely via Citrix gateway OCEANIA TECHNOLOGY SEMINAR 2008 © 2008 OSIsoft, Inc. | Company Confidential 28 Reefton Minesite Integration • • • • Provides access to PI System Utilise existing infrastructure and support Shared data without synchronisation issues Faster implementation for short term solution OCEANIA TECHNOLOGY SEMINAR 2008 © 2008 OSIsoft, Inc. | Company Confidential 29 Going Forward • • • • • Water management and consent monitoring Link Caterpillar Minestar system Improve user skills with client tools Integrate plant reporting into PI Deploy local server to Reefton OCEANIA TECHNOLOGY SEMINAR 2008 © 2008 OSIsoft, Inc. | Company Confidential 30 Conclusions • PI has significantly higher utilisation than previous system • Migrating data to PI allows full access to history – No need to maintain legacy Exaquantum server – Faster access and less training required – Exercise was much faster and easier than expected • Conversion simplified with a COM Connector • Provides basis for ongoing optimisation and OCEANIA TECHNOLOGY SEMINAR 2008 © 2008 OSIsoft, Inc. | Company Confidential 31