Transcript Slide 1
HA-PI at Northparkes Mines HA-PI: Context • Where we use PI • Why we use PI • How we use PI Copyright © 2007 OSIsoft, Inc. Company Confidential. All rights reserved. 2 Location Copyright © 2007 OSIsoft, Inc. Company Confidential. All rights reserved. 3 Northparkes Company • A series of porphyry copper-gold deposits with proven resources until 2017. • Mining began in 1993 with open pit oxide gold • The current method of mining, block caving, was commenced in 1998. 5.5Mtpa is processed at 1.5% Cu head grade. • Rio Tinto bought North mining in 2001 • Concentrate is sold to various smelters in Asia – with 20% going to our joint venture partners Sumitomo. Copyright © 2007 OSIsoft, Inc. Company Confidential. All rights reserved. 4 Northparkes flow sheet Copyright © 2007 OSIsoft, Inc. Company Confidential. All rights reserved. 5 UG mine layout Copyright © 2007 OSIsoft, Inc. Company Confidential. All rights reserved. 6 Block Cave Terminology Undercut block by blasting and removing a slice of ore Remaining ore fractures along jointing under induced stresses Broken ore is removed through drawbells and trammed on extraction level to crusher Undercut Draw Bell Extraction Level Access Decline Copyright © 2007 OSIsoft, Inc. Company Confidential. All rights reserved. 7 Flotation separation Copyright © 2007 OSIsoft, Inc. Company Confidential. All rights reserved. 8 Background with OSIsoft • PI was installed in November 2006 – no historian had been used before. • A 2000 tag system was purchased, covering all of the current trend tags on the Citect system (mill) and the reporting tags from the mine (a MacroView system). • Currently only the metallurgy team directly access the data. • Data is accessed through processBook and datalink (10 concurrent licenses of each). Copyright © 2007 OSIsoft, Inc. Company Confidential. All rights reserved. 9 Why PI? • PI was purchased to align NPM with other Rio Tinto users, particularly Rio Tinto Aluminum and Pilbara Iron • NPM have moved to the Rio Tinto Corporate domain – PI was the first server on site to run on this domain. • Ad hoc investigations are the major use at this time. • Enable centralized monitoring and support of process control loops. Similar work is ongoing at Pilbara Iron, already contributing over $100m of value. Copyright © 2007 OSIsoft, Inc. Company Confidential. All rights reserved. 10 Why high availability? • We plan to have PI at the heart of our reporting systems. • HA PI, combined with Live State and normal corporate backups allows for greater reliability. • Fully redundant system has been tested, and after recent power failures restarted automatically. – Allows IT to patch individual components without loss of data. Copyright © 2007 OSIsoft, Inc. Company Confidential. All rights reserved. 11 Plans for the Future • PI will become the only process data source for corporate applications as they are upgraded or replaced. • Capture metallurgical knowledge in the form of processBook display documents, held in a structured directory. • Restructure data flows. • Allow viewing of mine information at “mill control” and vice versa. Copyright © 2007 OSIsoft, Inc. Company Confidential. All rights reserved. 12 Old data flows UG PLCs NPMPROD OPD PLCs Macroview Citect i/o server OPC server Matrikon product server PGMNPM Lab data base Elipse Copyright © 2007 OSIsoft, Inc. Company Confidential. All rights reserved. users 13 Primary PI Server PI Collective Pi Clients CORP.RIOTINTO.ORG LAN Mill Router OPC Server OPC Server Pi Data Collector OPC Server Failover Pi Data Collector Data collector Failover NPMPROD LAN Mine OPC Servers & Pi Data Collector N-Way Buffering Copyright © 2007 OSIsoft, Inc. Company Confidential. All rights reserved. 14 Proposed data flows OPD PLCs UG PLCs Macroview OPC servers with PI interface nodes Citect i/o servers PI interface nodes NPMPROD PI historian Elipse/SAP Matrikon product server Copyright © 2007 OSIsoft, Inc. Company Confidential. All rights reserved. Lab data base CORP users 15 Conclusions • System alignment within Rio Tinto a key driver toward PI. • HA PI has been implemented. • NPM challenges are – Extract value from the data – Capture metallurgical experience in the form of relevant process books – Improve the data flows on site. Copyright © 2007 OSIsoft, Inc. Company Confidential. All rights reserved. 16 Questions Copyright © 2007 OSIsoft, Inc. Company Confidential. All rights reserved. 17