Transcript PG&E Presentation Template
IOU UPDATE Q4 2014 EM&V STAKEHOLDER MEETING
Loan Nguyen, SCG Rob Kasman, PG&E Kevin McKinley, SDG&E Shahana Samiullah, SCE December 9, 2014
2
EM&V Project Status
Please refer to the Project Status Reporting (PSR) System for current information on study status:
http://www.emvpsr.com/Projects/Default.aspx?tabid=1068
IOU PCG leads are responsible for updating IOU-led studies in the PSR.
IOU PCG leads will soon have the capability to update PDA (Public Document Area).
3
IOU-led studies in PSR - Sectors
Residential Large Com, Ind & Ag Lighting HVAC Finance Local Government Partnership Emerging Technologies Zero Net Energy Codes & Standards Small Commercial IDSM - Res and Small Commercial Workforce Edu and Training (WE&T) 0 2 1 1 2 3 3 4 4 5 6 * Some projects may be combined under one study.
10 10 13 21 15 20 25 Number of Projects in 2013-14*
IOU-led studies in PSR - Status
4
1-Initiation 2-Scoping 3-RFP 4-Design 5-Data/Analysis 6-Draft Report 7-Completed Other * 0 1 6 8 9 9 9 11 5 10 Number of Projects in 2013-14 15 17 20 The majority of projects are in the design and data collection/analysis stage.
6 projects are in RFP stage: 2030c - Lighting Pilots/Trials: SCE Sustainable Office Lighting Control Pilot Study 2036 - IOU Local Government Partnerships 2044 - Res Workpaper Update: MF Pool Pump 2046 - MF-EUC/MIDI Pilot & MFEER Change 2047 - Process Eval for WH/EUC Changes 2048 - Determine Average CAHP Energy Savings * On-hold, transition to ED, or cancelled.
5
PSR Key Fields
More Fields to Show…
6
Notes ED Program Manager Sector Plan Posted to PDA ED Consultants PGE Contact SCE Contact SDG&E Contact SCG Contact Project Coordination Group PCG Coordinator PCG ED Rep PCG Other ED