ITER Project Risk Register – February 2015

Download Report

Transcript ITER Project Risk Register – February 2015

INDUSTRY INFORMATION DAY
Assembly & Installation
Laurent Schmieder
Buildings Infrastructure and Power Supplies
Project Leader
21st May 2015
Industry information day
21.05.2015
1
Summary
1. What is the BIPS scope and organization
2. Procurement status
3. Schedule
4. Status of the works
5. Status of the works in 2017
Industry information day
21.05.2015
2
Overview of the scope for Buildings
Buildings program is 1.5 Billions of Investments
•ITER : 180 ha with 39 buildings and areas on the 40 ha platform
Reinforced Concrete Buildings
 250 000 m3 of concrete (including 190 000 m3 for Nuclear buildings)
 21 000 m2 footprint
 750 000 m3 building volume
Steel Frame Buildings
 29 000 m2 footprint
Power supplies (HV, MV, and LV distribution)
 Detailed design, installation and commissioning
 Procurement of the emergency generators, the cables, and 25% of the SSEN
equipment
 Current arrangement: the remainder of the equipment are procured by other
Domestic agencies (China and US)
Site infrastructures (Galleries, trenches, roads, bridges fences)
Industry information day
21.05.2015
3
Overview of the ITER Buildings
Industry information day
21.05.2015
4
Organization – Buildings contracts management
Legal Inspection
OWNER
Health and Safety
Coordination
BIPS PT
IO/F4E
IMPLEMENTATION
Internal and External
Experts
Support to the Owner
Energhia / Tiresia
Architect Engineer
250 staff
FIDIC Engineer
Tender Batch 03
Vinci Ferrovial Razel
270 staff -> 800
FIDIC Engineer
Tender Batch 04
Omega
200 staff -> 800
Industry information day
21.05.2015
Tender Batch 05. 06. 07
Ferrovial
50 staff -> 200
5
PROCUREMENT STATUS
Industry information day
21.05.2015
6
TB05
Magnet Power
Conversion & Reactive
Power Control
buildings - 25 M€
TB07
Cooling Towers -15 M€
TB06
High Voltage Electrical Equipment - 38 M€
1 B€ of construction contracts on-going
TB03 & TB04 Tokamak Complex & Assembly Hall
• TB03 : 300M€
• TB04 : 500M€
TB02 Long Lead – Mechanical Handling: 32M€
Industry information day
21.05.2015
7
Remaining procurement packages
TB12
NB buildings
TB09 & TB10
Hot Cell complex
TB13
Emergency Power Supplies
•
•
TB16: Site infrastructures
TB11: Completion works
Industry information day
21.05.2015
8
SCHEDULE
Industry information day
21.05.2015
10
Buildings Ready for Equipment (RFE dates)
Earliest RFE (B61, Q4 2016)
latest RFE (Hot Cell Facilities, Q1 2022)
Industry information day
21.05.2015
11
WORKSITE STATUS
Industry information day
21.05.2015
12
CURRENT STATUS OF ITER worksite
Industry information day
21.05.2015
13
Reminder: TB 03 – Civil works
Scope of Supply: 295M€
 Tokamak Complex (buildings 11, 14 & 74)
 Assembly Hall (13), Cleaning Facility (17), RF Heating (15)
 Cryoplant Compressor (51-52), Resistors (75), Site Services (61),
Control Building (71)
71
11
14
13
74
15
61
52
51
Works
duration
Number of
workers
2014 to
2019
~ 800
75
17
Industry information day
21.05.2015
14
TB03 – Work progress
•Concrete pouring of the walls on the first level (B2) of the Tokamak
 B14 – Tritium
Building :
-
Industry information day
21.05.2015
Walls execution is
progressing.
The reinforcement
for the last
external wall is
already in place.
15
TB03 – Work progress
 Pouring of the pillars of the
Diagnostic Building (B74)
completed
 Reinforcement work for the bio-shield ongoing
 Reinforcement of columns started.
 First external wall ready to be poured
Industry information day
21.05.2015
16
TB03 – Work progress
•Mock-up
Industry information day
21.05.2015
17
TB03 – Work progress
•Assembly building
 Objective:
Ready for crane rails
installation : 20 October 2015

The steel frame of the Assembly Hall
building is starting to take shape with
the fourth level sections of the massive
columns being erected in the east
facade and west facade has started the
erection of the 2nd level.
 Preparatory works for the assembly of
the roof on the floor are ongoing.
 The roof will be lifted in one piece
once assembled.
Industry information day
21.05.2015
18
TB03 – Work progress
•B61 – Sites services Building




Backfilling on going
Earthwork foundation pilling until June
Slab : Summer 2015
Steel structure : Until October
 Objective:
Building Water tight: 16 October 2015
Industry information day
21.05.2015
19
TB04 – Tokamak Complex / HVAC – 3D views
Design progress
Industry information day
21.05.2015
WORKSITE STATUS IN 2017
Industry information day
21.05.2015
21
Worksite status in 2017
Industry information day
21.05.2015
22
Thank you for your attention
Industry information day
21.05.2015
23