AM SOP Overview - USPS MISCELLANEOUS
Download
Report
Transcript AM SOP Overview - USPS MISCELLANEOUS
Overview
AM Standard Operating Procedure
Why Do Anything? - Volume Trends
National
Cased Letters (pcs)
8,000,000,000
7,000,000,000
6,000,000,000
5,000,000,000
AM SOP Overview
Q4
FY03
Q3
FY03
Q2
FY03
Q1
FY03
Q4
FY02
Q3
FY02
Q2
FY02
4,000,000,000
2
Why Do Anything? - Volume Trends
National
Cased Flats (pcs)
9,000,000,000
8,000,000,000
7,000,000,000
6,000,000,000
5,000,000,000
AM SOP Overview
Q4
FY03
Q3
FY03
Q2
FY03
Q1
FY03
Q4
FY02
Q3
FY02
Q2
FY02
4,000,000,000
3
Why Do Anything? - Volume Trends
National
DPS %
72%
69%
66%
63%
AM SOP Overview
Q4
FY03
Q3
FY03
Q2
FY03
Q1
FY03
Q4
FY02
Q3
FY02
Q2
FY02
Q1
FY02
60%
4
Why Do Anything? – Productivity Trends
National
OEI/SEI
% SPLY
8%
3%
-2%
-7%
-12%
Q1
FY02
Q2
FY02
Q3
FY02
Q4
FY02
Q1
FY03
AM SOP Overview
Q2
FY03
Q3
FY03
Q4
FY03
5
Why Do Anything? – Carrier Office Summary
Continuous volume decline
Increase in DPS
Failure to capture down time in the office
– Declining OEI trend
– Increased usage of street hours
– Declining SEI
AM SOP Overview
6
Why Do Anything? – Created From Necessity
Situation
– Unstable Mail Flows and Processing Expectations
– Carriers Waiting on Mail from F1 and F4
– Declining Workload
– Erratic Leave Times
– Expanded Street Times
– Leave Early for Street, Return at Scheduled Time
Summary: Create Consistency Via Standardization
to Eliminate Chaotic Environments
AM SOP Overview
7
Strategy Development - Introduction
The purpose of this strategy is to standardize
management processes and integrate IOP into
the management of carrier AM office procedures
To provide a training guide with a step by step
process utilizing:
– DOIS
– TACS
– MSP
– Policies & Procedures
Develop the business case to stabilize routes
AM SOP Overview
8
Strategy Development – Remove the Barriers
Stabilize Mail Flows & Processing Expectations
– Create IOP Contracts
– Establish Correct Start Times
Stabilize Carrier Leave Times
– Leave at Scheduled Time
– Document Work Hours Based On Workload
Stabilize Carrier Street Times
– Leave and Return at Scheduled Times
Summary: Create Consistency Via Standardization To
Eliminate Chaotic Environments
AM SOP Overview
9
Strategy Development – Critical Path for F2B
Program is Responsibility of:
– POOM / MCSO
– Postmaster / Station Manager
Procedures / Methods are:
– Visual
– Quantifiable
Create:
– Daily Accountability
– Operational Responsibility
AM SOP Overview
10
Strategy Development – Critical Path for F2B
Management Actions to Exercise Rights and
Responsibilities
– M39
– M41
– F21
– ELM
Standardize Methods
– AM SOP
AM SOP Overview
11
Strategy Development – Critical Path for F2B
Core Elements
– Define Plant Requirements – IOP Contracts
– Spread/Count 100% Committed Flats to Carrier
Case
– Set Carrier Reporting Time
– Sequence A.M. Carrier Procedures
Identify and Track:
– Straight Time Pivoting & Office Assistance
– Stand-By Time by Cause
AM SOP Overview
12
Strategy Development – Plant Responsibility
Processing
– DPS - 85%
– CR Flats - 80% Automated
– STD ‘A’ Isolated
Create IOP Contract
– Identify/correct exceptions
– Integrated Operating Plan – Daily Tracking
– Reports by day, week, & YTD for DPS, Flats, &
Transportation
AM SOP Overview
13
Strategy Development – Delivery Units
Efficient Office Layout
Standardize Sequence Of Daily Events
– Vehicle Check
– Nixie/Forwards
– Accountable Mail
– Miscellaneous
Ensure Accuracy Of DOIS Data
AM SOP Overview
14
Strategy Development – Delivery Units
Standardize Clerical Functions
Reporting Times
– Mail Receipt - Prep – Spread
– Increase Flexibility
– Route Structure Will Support Appropriate
Complement
– 80% Mail Available - 100% Flats
Prioritize Flats - For Carrier Case Distribution
Count Volume – Use DOIS Ensuring Accurate
Data
AM SOP Overview
15
Strategy Development – Delivery Units
Set Carrier reporting time
LATE
TARDY
– EAL < 8 hour increments
– Secure timecards
– F21 section 142.11 Time & Attendance Manual Upon arrival, employees are to clock in at the
scheduled reporting time and report to their work
station ready to work
AM SOP Overview
16
Strategy Development – Flats Office Time
AM SOP Overview
17
Strategy Development – Delivery Units
80% of the carrier’s mail should be at the carrier case
prior the carrier arrival-M-39 sec 141.122.
100% caseable flats prior to carrier reporting times.
CASE FLATS FIRST
Observe workroom floor activities
Identify, address, correct and document
inefficient/time wasting procedures
Communicate current day’s expectations
Review carrier’s request for OT and assistance
AM SOP Overview
18
Strategy Development – Delivery Units
DOIS is to be used as the tool to provide
ongoing trend analysis to ensure proper route
structure and MUST have accurate data
– Evaluate daily work hours using projection reports
– Provides the historical data needed to determine
route adjustment
– Provides the means to actually perform the route
adjustment
AM SOP Overview
19
Strategy Development – Delivery Units
Review previous day variances in carrier agreed-upon
return time and or end tour using the:
– 1813, 1017A/B, DOIS & TACS reports
Ensure accountable clerk is scheduled to avoid delay
of carriers, MDCD scanners should be provided at this
time
Utilize rolling carts by accountable clerks
Observe loading procedures to ensure
– Loading is on street LDC
– Parcels sequenced into the vehicle on street time to
facilitate timely delivery
– Parcels are NOT part of an office function
AM SOP Overview
20
Strategy Development – Critical Path for F2B
Identify Under-Time To Primary Route
– Straight Time
– Office Assistance
– Pivoting
Stand-By OPN 354 Coded By Cause
Document (DOIS/TACS) All Straight Time Not On
Primary Route
AM SOP Overview
21
Strategy Development – Site Selection
Pre-Inspection TOP (Top Office Performer) Audit
conducted in initial AM SOP site by Eastern Area
Inspection Team - Nov. 02
Office failed TOP Audit - 81 overall / 36 delivery
AM SOP Overview
22
Strategy Development – Site Selection
Numerous Causes/Concerns
Mail Arrival Problems
Clerk Inefficiencies
Carrier Inefficiencies
Management Inefficiencies
Poor FLASH Performance Issues
Eastern Area Inspection Cancelled - Office Not
Ready $$$$
AM SOP Overview
23
Initial Results – Performance Improvement
TOP Audit - Improved from 81 overall / 36
delivery score to 97 overall / 98 delivery score
LDC 21
– PRE -0.7% to PLAN, -4.8% to SPLY AP02 FY 03
– POST -3.6% to PLAN, -8.3% to SPLY AP06 FY03
OEI
– PRE
0.8% to PLAN, 5.5% to SPLY AP02 FY03
– POST 3.7% to PLAN, 9.7% to SPLY AP06 FY03
AM SOP Overview
24
Initial Results - Outcomes
4.5 Routes reduced
5 Vehicles eliminated
5 Positions excessed
Base reduced 30 hours
Scheduled BT changed from 06:30 to 07:00 to
07:30 after RI
AM SOP Overview
25
Communicating the Strategy
Process
– Area
-
NBA’s
– PC
-
Local Presidents
– Manager
-
Stewards
– Supv
-
Carriers
Discuss AM SOP
Process - Events - Timelines
AM SOP Overview
26
Communicating the Strategy - Internal
Office management to Carriers- driven by use of
standard operating procedures to direct the
sequence of actions & events within the office
Training for Customer Service & Plants
– PCES
– PC Staff
– Plant & Customer Service Managers
– Operations Managers & Supervisors
AM SOP Overview
27
Communicating the Strategy - External
Management Organizations - NAPS, NAPUS,
League of Postmasters
Overview program with NBA’s, local presidents,
stewards
AM SOP Overview
28
Strategy Implementation
AM SOP Initiative - Operational Responsibility
– Owner
- POOM/MCSO
– Co-trainers - MOP/MGR DP
– Oversight - Field coordinators (4)
Not a support program
AM SOP Overview
29
Strategy Implementation – Site Selection
Criteria for ‘Alpha’ & ‘Beta’ sites
– DOIS site with 20-50 city carrier routes
– DPS & FSM processing
– Overtime > 10%
– Marginal budget performance
– Identified inefficiencies
AM SOP Overview
30
Strategy Implementation – Alpha Roll-Out
One site per PC
50 day timeline, start to finish
Start - July 14, 2003
Completion - September 2, 2003
Consists of 445 city routes
AM SOP Overview
31
Strategy Implementation – Beta Roll-Out
One site per POOM / MCSO
50 day timeline, start to finish
Start - August 12, 2003
Completion - September 30, 2003
Consists of 2082 city routes
AM SOP Overview
32
Alpha Site Results
Start times
– 11 sites changing to later carrier begin tour due to
identified mail arrival profile (by :30 to 1:30)
Time clocks
– All sites now securing badges
Downtime
– Operation 354 used along with reason for
downtime (documented 2 to 10 hrs per day
average)
AM SOP Overview
33
Alpha Site Results
Floor layout
– All sites changed floor layouts (197 routes moved)
– All sites reduced casing equipment (133 pieces of
cased eliminated)
– Floor configuration changed
– Eliminated safety hazards
Transportation
– 7 sites made transportation changes
AM SOP Overview
34
Alpha Site Results
Delivery Point Sequence
– Twelve sites indicate increased DPS percentage
from 1.2 to 15.5% with 2 sites at 85%
– Four sites exceeding 80% DPS
DOIS Indicators
– Eleven sites increased Total Workload
Effectiveness AP following implementation
AM SOP Overview
35
Alpha Site Results
Mail flow / F4
– Reduction in F4 work hours
– 80% of mail is being provided to the carrier prior to
their begin tour
– IOP team focus is on separation of pref from
standard mail
AM SOP Overview
36
Alpha Site Results
Route / work hour adjustments
– Thirteen sites made immediate minor/negotiated
adjustments involving the elimination of 15 routes
plus work hour / route status reductions
– One site absorbed 800 new growth deliveries
– Formal Inspections and/or additional minor
adjustments planned for spring
AM SOP Overview
37
Summary
Establish Core Competencies For Sites
– Transportation Stability
– IOP Effectiveness
– Office & Street Work Hour Trend
– Office & Street Effectiveness (DOIS)
– Downtime Report
– OEI / SEI
– Late Leaving / Returning Routes
AM SOP Overview
38
Summary
Stabilize Route Structure
– Formal Inspections
– Special Inspections
– Minor Adjustments
Present Business Case
– To NALC
– To Individual Carrier
Conduct Joint Reviews
AM SOP Overview
39