MNCF August Update

Download Report

Transcript MNCF August Update

Micro and Nano Characterization Facility
Girish Kunte
October 29th 2013
Agenda
• Equipment Usage Statistics
• MNCF – Updates
Instrument Usage Statistics – Electrical Lab
Equipment Utilization Chart
500
450
400
Total hrs
350
300
250
200
150
100
50
0
DC PS1
Total
Unavailable
Downtime
Not Used
Used
189
0
0
76
113
Nonoffice
531
0
0
467
64
DC PS 2
189
0
0
67
122
Nonoffice
531
0
0
326
205
RF PS
189
0
0
131
58
Non
Office
531
0
0
531
0
Instrument Usage Statistics – Mechanical Lab
Total hrs
Equipment Utilization Chart
500
450
400
350
300
250
200
150
100
50
0
AFM
- NonBrukeoffice
r
Total
189 531
Unavailable 0 0
Downtime 189 531
Not Used
0 0
Used
0 0
Opt
NonNonNonProfilNonUV- NonMSA
UTM
SAM
office
office
office
ometoffice
Vis office
er
189 531 0 189 531 0 189 531 0 189 531 0 189 531
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
126 502
159 531
182 531
169 528
179 531
63 29 0 30 0
7 0
20 3
10 0
Instrument Usage Statistics – Materials Lab
Equipment Utilization Chart
500
450
400
Total hrs
350
300
250
200
150
100
50
0
SEM - NonEDS office
Total
189 531
Unavailable 0
0
Downtime
0
0
Not Used
0 426
Used
189 105
SEM - NonCL office
189 531
0
0
0
0
37 371
152 160
FIB
189
0
8
0
181
Nonoffice
531 0
0
42
455
34
0
Zeta NonPALS office
189 531
0
0
0
0
184 531
5
0
XPS
189
0
189
0
0
Nonoffice
531
0
531
0
0
Instrument Usage Statistics – Optical Lab
Total hrs
Equipment Utilization Chart
500
450
400
350
300
250
200
150
100
50
0
mRaNonmanoffic
& PL e
SolarNonSimuoffic
lator e
NonFT_I
offic
R
e
Total
189531
Unavailable 0 0
Downtime 0 0
Not Used 61 479
Used
128 52
189531
0 0
0 0
163525
26 6
189 531
0 0
189531
0 0
0 0
XRDXRDNonNon- powNonNonfour
SPMoffic Q Effoffic der/offic
offic
circl
e
e
Thin e
e
e
Film
0 189531 0 189531 0 189537 0 189531
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
189531
189531
46 387
97 478
0 0 0
0 0
143150
92 53
MNCF Updates
• XPS is open for booking
– Repaired on 30th November
• AFM Status:
– Payment to Bruker done on 28th Nov
– Parts to be shipped today from Singapore
• Automated Login System:
– Aravinda modified existing system to include feedback page - compulsory to fill
after each slot
– Working on automating billing using the login system
– Unique ID to be given to users starting 9th Dec
MNCF Updates
• New Installations:
– 1.7 T Electromagent installed in Electrical Characterization
– Hall probe to be made
– Kliendiek Nanomanipulators installed on SEM-EDS
• Low temperature probe station to be installed on 13th December
Thank You!