Transcript Slide 1

Clarification Meeting:

Provision of Primary Health Care and Occupational Health Services Kusile Power Station Project 30 July 2013

Agenda

Welcome & Introduction:

Ms Olga Molaotsi 

Evacuation Route:

Mr Gladstone Morake 

Background of the Project:

Mr Gladstone Morake 

Technical:

Mr Jerry Thumbatha 

Quality

: Mr Motsaka Ledwaba 

SHE

: Ms Musiiwa Luvhengo 

Commercial

: Ms Olga Molaotsi 2020/04/27 2

Evacuation Route:

By: Gladstone Morake 2020/04/27 3

Background of the Kusile Project:

By: Gladstone Morake 2020/04/27 4

Background

• Due to the increasing demand for electricity, Eskom has decided to embark on a new build program to increase its generating capacity and support economic growth of the country.

• It entails the construction of a coal fired power station and associate infrastructures in Mpumalanga.

• Kusile Power Station is a coal-fired power station with six supercritical generating units.

2020/04/27 5

Background

• The total generating capacity of the station will be 4800MW.

• Project Kusile is located between N-12 and N-4 highways; about 40 km Northwest of Emalahleni,10 Kilometers from Kendal Power Station.

• The provision of primary health care and occupational health forms part of Kusile Project initiatives of enhancing medical services capacity 2020/04/27 6

Eskom Health & Wellness

Technical presentation

By: Jerry Thumbatha 2020/04/27 7

TECHNICAL PRESENTATION Kusile Medical Centre

Date : 30 July 2013 Presented by: Jerry Thumbatha

Background

• Kusile Power Station Project currently has and one admin.

one medical

centre which is operated by Eskom. The staff compliment is two professional nurses • The service provided is occupational health to Eskom permanent employees, IOD treatment of both Eskom employees and contractors and PHC for contractors.

• ER24 is also based on site 24 hours a day and attend to all emergencies that might occur.

• As the

work force increased

, a decision was made to out source this services to a service provider that will focus on providing the PHC and OH services to the contractors on site. 9

Breakdown of PHC services

PHC services will be divided as follows: • Treatment of minor ailments and family planning • Monitoring of chronic patients and referral to external service providers for further management • Medical emergencies will be stabilised on site and referred.

• Further diagnostic evaluation will be referred externally • HCT/VCT will be provided and referred where necessary • Obstetric cases will be referred out 10

Primary Health Care

• It will be operated by professional nurses from 07h00 to 17h00 Monday to Friday.

• They will also be required to respond to call out and do overtime as and when required.

• Currently Kusile has medical aid schemes and rely on the services from the clinic when they are not feeling well.

+_ 13000 contractors, most of them don’t have • Based on our previous statistics, on average the clinic treats about 150 PHC cases a week.

• Having said that Eskom does not guarantee that these are the numbers that the service provider will have to treat as it may be more or less.

• The Primary Health Care service will be funded by Eskom excluding the diagnostic investigations 11

PHC (cont.….)

• The facility and the equipment required to render this service will be provided by Eskom.

• The maintenance and replacement of the equipment will be the duty of the service provider.

• The doctor will be required to work

two hours daily(Monday to Friday

) and perform call out duties as and when required.

• The service provider will have to provide a list of medicines that might be needed for PHC and price each item.

• The service provider will also be providing treatment to

contractor injuries on duty (IOD)

and then fill in the necessary COID documentation for processing. 12

Occupational Health

• The service provider will be given a platform to provide this service to the contractors as well.

• This means that the service provider will be providing the service for a fee from the contractors.

• The service provider will have to market their services to the contractors and have competitive prices so that they secure clients.

• A retainer fee will be paid to the service provider. • The service provider will have to bring his own equipment for occupational health services.

• The service provider will be responsible for the maintenance and replacement of occupational health equipment.

• Eskom will pay a retainer fee for the mobile x-ray to be brought to site for a speedy and uninterrupted service to be available.

• Service provider will do the trending and provide monthly reports to Eskom 13

Basic Compliance /Mandatory Requirements

Tenderers must submit the following documents in order to be eligible for further evaluation: • Certificate of registration with relevant professional bodies i.e. SANC for nurses and HPCSA for medical practitioners • Certified copies of relevant valid qualifications for the personnel (for nurses: four year diploma or degree in nursing, occupational health qualification, spirometry, audiometry and dispensing license. For doctors MBCHB, occupational health qualification).

• Company ownership must comprise of individuals in the medical field.

NB: Tenders which do not meet Eskom’s mandatory requirements will not be evaluated further.

14

Structure of the facility

Drawing 1.pdf

Drawing 2.pdf

15

Questions

16

Thank you

PROCUREMENT QUALITY ASSURANCE

Quality Presentation by:

Motsaka Ledwaba 2020/04/27 18

PROCUREMENT QUALITY ASSURANCE TENDER CLARIFICATION PRESENTATION PROFESSIONAL SERVICES ESKOM CONTRACT QUALITY REQUIREMENTS STANDARD QM58

Presenter: Motsaka Ledwaba

31 Jul 2013

Eskom Contract Quality Requirements

Eskom Contract Quality Requirements Standard QM58

All Consultants shall adhere to the requirements as set out in the Eskom Contract Quality Requirements Standard QM58.

The requirements include, but are not limited to the following: 1. Quality Management System Requirements (Ref: Eskom Standard QM58, Section 3.1)

• The consultants shall implement and maintain a Quality Management System which, as a minimum, meets the requirements of ISO 9001-2008 Quality Management System Requirements. Compliance to ISO requirements shall be verified by a full quality compliance assessment performed by Eskom prior to award of contract.

Note: Eskom shall specify within the scope the applicable areas of ISO 9001-2008 and the application of this standard in the enquiry/contract/order quality requirements forms (Annexure A and B).

2020/04/27 20

Eskom Contract Quality Requirements (cont.)

2.

Quality Documents to be submitted with the Tender (Ref: Eskom Standard QM58, Section 3.2)

• Signed enquiry/contract/order quality requirements forms (B) • A CV of the consultant’s quality management representative • One provisional copy of the contract quality plan (including a signed quality policy) • ISO 9001-2008 certificate or objective evidence of an ISO 9001-2008 compliant quality management system.

• Latest structure/organogram of the quality function/department, resources, and number of employees employed in the quality department, including an abridged indication of qualifications (the quality structure to show who the quality departmental leader reports to within the tenderer’s organisation) • Any quality management accreditations(NDT/NDE/welding) and special processes requiring certification.

• 2020/04/27 Preliminary risk assessment data 21

Eskom Contract Quality Requirements (cont.)

• Information on similar work performed recently ( within the last two years): o Sample contract quality plan (including a quality control plan) from a similar project executed by the tenderer less than two years ago ( o Sample report reflecting quality performance and measures (report to reflect statistics of at least six months) o Sample of non-conformance report o Sample of Corrective and Preventive Action reports • Management of suppliers / sub-contractors to the tenderer o A detailed description of the process/procedure for evaluation, selection and control of sub contractors/suppliers(where applicable).

2020/04/27 22

Access to the Consultant’s premises and facilities

Eskom or its inspection authority/agency, where appropriate, shall be afforded access to the consultant’s and sub-contractor’s premises and facilities at reasonable times to conduct quality audits, surveillance or inspections to verify compliance with the contract/order.

2020/04/27 23

Questions?

Thank you

SHE Presentation By: Musiiwa Luvhengo

CPHC/ OH

Clarification Meeting SHE Presentation

SHE Evaluation Submittals: OHS

Please submit the following documents for SHE Evaluation: 1. SHE Management system • SHE Plan aligned to the Project’s SHE Specification (Sec 4 part 9) • SHE policy (adequate & signed by the Company’s CEO) • Proposed Sufficient SHE Budget Breakdown supporting the SHE Plan • Baseline Risk Assessment & SHE Method Statements (on Medium &High Risks) • Organogram -Site structure( CV’s & Competency Proof) • Procedures (Incident management/Occ Hygiene programme • Emergency Preparedness ( fire, bomb threat or labour unrest) 28

SHE Evaluations Submittals: OHS

2. Site Management Plans: • Access /Traffic Management Plan 3. Company’s Past SHE Performance: • Records for the past three years.

• Records of DoL / DMR reportable incidents • Environmental performance: Contravention of legislation.

• Any past SHE achievements.

SHE Evaluations Submittals

4. Occupational Health and Wellness • Valid Letter of good standing ( proof of registration with WC) 5.

Environmental Management: • Environmental Management Plan (eg. Waste/General/Hazardous waste management) in line with Sec 4 part 10, Impact and Aspect register in line with scope of service, • Waste Manifest and Safe disposal certificate (SDC) [To be provided when waste is removed from site and an SDC submitted after disposal] • Method statement on how medical waste would be handled from cradle to cave, Permit for disposal or treatments of medical waste from service provider

Questions

Price Schedule

• By: Alfeo Phiri 2020/04/27 32

Price Schedule

Price Schedule.xls

2020/04/27 33

Commercial

Presentation by: Olga Molaotsi

2020/04/27 34

Commercial

Enquiry Number:

Enquiry closing Date:

Place: NB: No late submission will be accepted PS(K)(R)2013/OM/01 30 August 2013 at 10:00am Megawatt Park at Sunninghill

2020/04/27 35

Commercial

Bidders are required to use 2 Envelope system and 1 CD.

(1 st Envelope: Commercial and Financial) 1 Original and 1 Copy (2 nd Envelope: Technical and SHEQ) 1 Original and 1 Copy Price schedule to be submitted on a CD as well as a signed hard copy

NB: FAILURE TO SUBMIT COPIES WILL RESULT IN DISQUALIFICATION

2020/04/27 36

Commercial

Tender documents should be addressed as follows:

Commercial and Finance

Private and Confidential, Group Capital Division Kusile Power Station Project Attention: Olga Molaotsi Marked CONFIDENTIAL TENDER NO: PS(K)(R)2013/OM/01 

Technical and SHEQ

Private and Confidential, Group Capital Division Kusile Power Station Project Attention: Olga Molaotsi Marked CONFIDENTIAL TENDER NO: PS(K)(R)2013/OM/01 2020/04/27 37

Tender Box Location

Tender Office

Megawatt Park NO.1 Maxwell Drive Sunninghill Sandton Tender Box is opposite main Reception

2020/04/27 38

Structure of the Document in the tender bulletin

Request for proposal

NEC 3 Professional Services Contract (PSC)

Returnables

2020/04/27 39

Invitation to Tender

Acknowledgement Form

Faxed to 086 660 0480 Or email to [email protected]

Returnables- Commercial, Financial, Technical(SHEQ)

Gatekeepers/Mandatory requirements

2020/04/27 40

Company Letters

• Acceptance of tender validity (120 Days) • Acceptance of Eskom standard conditions of tendering 2020/04/27 41

NEC 3 Professional Services Contract

 Cover Page  Agreements and Contract Data  Form of Offer and Acceptance  Data provided by the Employer  Data provided by Consultant  Pricing Data  Scope of work 2020/04/27 42

NEC 3 PSC

Documents to be returned and completed:

 Cover Page.

 Form of Offer and Acceptance  Contract Data provided by Supplier 2020/04/27 43

NEC 3 PSC- Contract

NB: The contract needs to be submitted with the tender documents except Scope of Work

2020/04/27 44

Evaluation Process

All tenders are evaluated and scored in accordance with Eskom’s Procurement Process 

Functionality

Local Production and Content

Financial Analysis &

Price & preference (90/10)

2020/04/27 45

ACCESSIBILITY OF DOCUMENTS

Tender documents may be downloaded as follows: www.eskom.co.za

Click on Tenders Click on What’s out to tender Click Eskom’s Tender bulletin Click on General Search Click on Search http://mp2mas17.eskom.co.za/tenderbulletin/search.asp

2020/04/27 46

Preferential Procurement Policy Framework Act B-BBEE Evaluation (10 points) Tenderers are required to submit original and valid B-BBEE Status Level Verification Certificates or certified copies thereof together with their tenders to substantiate the B-BBEE claims.

Tenderers who do not submit B-BBEE Status Level Verification Certificates or non-compliant contributors to B-BBEE will not qualify for preference points for B-BBEE however will not be disqualified from the tender process. Such a tenderer will score points out of 90 for price and 0 points out of 10 for B-BBEE 2020/04/27 47

Financial Analysis Step 3 – Financial Analysis •An analysis of the tenderers financial statements will be conducted for the purposes of establishing the tenderers financial viability and ability to meet all of its contractual obligations for the duration of the contract, should the tenderer be awarded the contract. •Where applicable a financial evaluation will be conducted by Eskom to further evaluate the financial viability of the tenderer. (incl. formal treasury evaluation) • Past 2 years Audited financial statements • Tenders which do not meet Eskom’s financial requirement will not be evaluated further.

48

Price and Preference

Step 4 – Price and Preference Price Evaluation (90 points) • • Where: Ps Pt • Pmin = = =

Adjudication Criteria

Price Evaluation

Ps

= 90 (1 –

Pt – Pmin

)

Pmin

Points

90 Points scored for price of tender under consideration Rand value of tender under consideration Rand value of lowest acceptable tender 2020/04/27 49

Preferential Procurement Policy Framework Act

PPPFA

10 B-BBEE evaluation score B-BBEE price 90

Price Evaluation

| 50

Contact details of tenderer

• Company representative/Contact person • Email address • Fax • Telephone/Cell phone number 2020/04/27 51

Communication During Tender Period

Contact Person: Olga Molaotsi

Tel:+27 13 699 7367

Email Address:[email protected]

NB: All clarification should be send via dedicated e-mail address

2020/04/27 52

Thank you