Transcript Slide 1
Integrated Coach Management System An Overview Outline of the presentation Scope Initial New enhanced scope Stages of ICMS implementation strategy with phases ICMS Estimate Features of Coaching Stock Module Roadmap of ICMS Technology Scope of ICMS Initial Goal Monitor train running Monitor Status of Coaching Stock in real time Ensure timely Maintenance Planning including IOH/POH to minimize idling of Coaches outside shop Enhanced scope of ICMS Coaching Operation Information System has been renamed with enhanced scope as Integrated Coaching Management System. The scope of this application is to cover following: Coaching Stock Management Punctuality Module Coaching Maintenance Module Timetabling Module Integrated Coaching Management System Punctuality Module This module has been implemented all over Indian Railways. This module will be migrated to the same system on which Coaching Stock Module is being implemented. This migrated module will be offered for the testing by 20th June’06. Coaching Stock Module Will be discussed in next slides. Coaching Maintenance Module This module will capture depot workflow related to Coach Maintenance. Timetabling Module This module is again in two parts Maintaining a Centralized database of trains time table and providing centralized updating of time table data by all zones. Simulation of time table which will help in planning, rake link utilization etc. Stages of ICMS Implementation First Stage In the first stage of this project, the Punctuality of trains shall be addressed under Punctuality Module. Punctuality will be shifted from current NTES servers to COIS servers on FOIS network by 20th June 06. Punctuality Reporting may be shifted from current system to thin clients at all divisional control offices wherever Coaching Stock Module has been rolled out & having thin client. Stages of ICMS Implementation Second Stage In the second stage, Coaching Stock Module is being addressed. The software is ready & it is being tested at HNZM station. The Implementation of Coaching stock Module has been divided into three phases. Phase – I includes implementation at 12 major coaching hub locations. All the Zonal Railways have been given directions for pin pointing the terminal location for installing the COIS terminal, provide connectivity & ensure site preparation at all these hub location by 30th June 06 & commissioning of these locations by 31st Aug. 06. Implementation at locations covered under Phase – II has been given the target as 31st Oct. 06. Implementation at locations covered under Phase – III has been given the target as 31st Dec. 06 for commissioning. TARGETS OF SECOND STAGE Activities Target Date B.1 Updated information of coach master with 23 mandatory fields should be submitted to CRIS 30th May 06 B.2 User specification reports circulated to COM should be responded with suggestions/modification 30th May 06 B.3 Formation of core implementers team consisting of 4-5 staff from TNCs /Station master cadre for seeking training on COIS & further training their staff on Zonal Railway 15th July 06 B.4 Pin pointing of the locations for installing COIS terminal, provision of connectivity & site preparation at all locations in Delhi Area, JAT & LKO 30th July 06 B.5 Commissioning all locations in Delhi Area, JAT & LKO 31st Aug. 06 B.6 Pin pointing o locations for installation for terminal & provision of connectivity/site preparation at ASR, DDN, HW, BSB & KLK 30th June 06 Activities of ICMS Second Stage (Contd..) B.7 Commissioning all locations at ASR, DDN, HW, BSB & KLK 31st Oct. 06 B.8 Ensuring pin pointing of sites for installation for terminal & connectivity/site preparation at MTC, FZR, UMB, CDG, SRE, BTI 15th Oct. 06 B.9 Commissioning all the locations at MTC, FZR, UMB, CDG, SRE, BTI 31st Dec. 06 B.10 Site preparation of V-SAT location at Delhi Area, MTC, LKO, JAT, ASR, PTK, DDN, HW, DE, UMB, CDG, SRE, KLK 31st July 06 Stages of ICMS Implementation Third Stage In the third stage of, Coaching Maintenance Module is being addressed. Coaching Maintenance Module can be implemented only after the scope of the module is received from Railway Board. This module will have integration with Coaching Stock Module & hand shake will be ensured in various events. Stages of ICMS Implementation Fourth Stage In the fourth stage of, Time tabling is being addressed. Time tabling Module has two parts; (1) Centralized trains time table & (2) Simulation Module. Centralized Trains Time Table Maintaining of centralized database of trains with following attributes (a) Train Definition (b) Validity period of the train definition © Days of Run (d) Train Profile (e) Train Schedule (list of stations with timings)etc. Providing soft copy for printing of IR Time table. This part of the module will also be ready by 31st Dec. 06. Stages of ICMS Implementation (Contd..) (a) (b) (c) Simulation Module Simulating the suitable timings for running of all kinds of trains. Simulating the best available path for planning a train keeping in view all variables. Simulating optimum utilization of rake link. This Module is still at the age of defining the requirement specifications which is awaited from Railway Board. ICMS Estimate COIS was sanctioned in 2003-04 at the estimated cost of Rs. 7.0 Cr. For Punctuality implementation Rs. 1.43 Cr was sanctioned. With conversion of COIS project to Integrated Coach Management System Project, the estimate has been revised to 42 Cr and the sanction is awaited from Railway Board. There are 136 COIS locations with 495 thin clients. Broad Objectives of Integrated Coach Management System To monitor the condition and location of the coaching stock . To monitor the coaching rakes, their locations, arrival – departure . To work as a management tool to provide for planning and rescheduling of rakes. To work as a management tool to optimize utilization of each coach and timely maintenance (POH) and repairs. Prompt planning for idle coaches and their timely bookings and usage to generate more review for the Railways. To avoid manual manipulations and to provide fool-proof service to enhance the image of the Railways. To provide MIS for Coaching Operations. Major Features in Integrated Coach Management System Rake Formation Rake Examination Departure Reporting Enroute Detachment/Attachment Arrival Reporting Movement Empty Rake Movement from one yard to another yard Verify Consist Sick Marking Detachment Sick Line Operations Shop Marking Shop Operations Daily Stock Report Advanced Booking of Coaches by Zonal Railways. Memo Generation Mailing Facility Major Reports Daily Stock Report-Yard, Division, Zone and Indian Railways. Rake Link Information – No. of Rakes running with location of each rake, last event done on Rake, consist of each rake etc. Trains running with shortage/excess load. My Coaches in other Railways and vice versa. Coaches inside shop/outside shop/journey to shop/back from shop etc for certain given duration. Ineffective coaches Coach history for a given duration/starting from induction in the system. User Generated Report for Coaches. ICMS locations on NR Division Location Terminal HQ Baroda House 5+12 (Spare) Delhi Delhi Jn. 4 New Delhi 4+2 (Divl. Control) Nizamuddin 2 Delhi SaraiRohilla 2 Meerat Cantt. 1 Firozpur 1 Jammu Tawi 2 HSQ 3 Amritsar 2 Pathankot 3 Dehradun 1 Haridwar 1 Moradabad 2 Bareilly 1 Firozpur Moradabad ICMS locations on NR (Contd..) Division Location Terminal Lucknow Lucknow 1 Varanasi 2 Kalka 2 Ambala 1 Chandigarh 1 Saharanpur 1 Bhatinda 1 Ambala V-SAT Locations S. No. Location of COIS 1 SSE C&W, NDLS 2 TNC, DLI 3 SSE, C&W, NZM 4 TNC, DEE 5 TNC-MTC 6 TNC, LKO 7 TNC, JAT 8 TNC, ASR 9 TNC, PTK 10 ASM, HSQ 11 TNC, DDN 12 TNC, BE 13 TNC, HW V-SAT Locations (Contd…) S. No. Location of COIS 14 TNC, UMB 15 TNC, KLK 16 TNC, CDG 17 TNC, SRE ICMS Roadmap o o o o Punctuality Module to be migrated on new system (will be offered for testing by 20th June’06) Coaching Stock Module. Phase – I has been given the target as 31st Aug.’06, Phase – II has been given the target as 31st Oct. 06 & Phase – III has been given the target as 31st Dec. 06. Coaching Maintenance Module can not be implemented till the scope of this module is not received from Railway Board. Timetabling Module is still at the age of defining the requirement specification which are awaited from Railway Board. Integration with other Applications Integration with control charting application will provide exact position of rolling stock. Production units information system RCF and ICF will interface with the system to obtain data of stock introduced. Integration with PRS to analyze the traffic demand as well as for day to day working with damaged coaches,charting etc. Interfacing with workshop management module to have more clear picture of coaches in shop. Software Design Application design will be MVC (Model ,View & Controller)Arch only. Model is for data representation and business logic, Views that provide data presentation and user input(jsp), Controller to dispatch requests (servelet). Software Design Contd.. The business layer provides only application functionality, with no reference to presentation. The presentation layer presents the data and input prompts to the user (or to another system), delegating application functionality to the business layer. Separating business logic from presentation has some important benefits: -Minimizes impact of change -Increases maintainability Technology Platform Java based technology J2EE architecture is being used.(WebSphere Application Server) Backend is RDBMS Oracle 10g. This application will ride on the same network as that of FOIS. 7/18/2015 CRIS 24 System Architecture User will connect to Web servers through browser interface The user will be having Thin clients at their location that will be having internet browsers. At the back-end will be the database server(RDBMS with High Availability) Middle tier will have application servers with load balancing features System Architecture Web Servers Zones/Divisions / Yards Application Server Cluster DB Server Cluster Clients Intranet FireWall Web Servers Database Database Production Environment PRS LAN L3 Switch Management Console Offline Environment SAN Switch SAN Switch Storage Console + Backup Server L2 Switches Cluster Cluster Production App Server Cluster Cluster Offline Database Server Production web Server EDGE Load Balancer Dev App Server THANK YOU