NanoRelease is working to advance
understanding of measurement methods for the
release of nanomaterials from solid matrices
used in commercial products.
2
Phase 2.5 report
Three white papers
PHASE2 + 2.5
Glossary of terms
Decided on MWCNT-polymer
Criticality
PHASE1
We have the best ever compilation of knowledge:
• Comprehensive: white papers on scenarios, materials, methods
• Specific advice: phase 2.5 report about nano-release labs
• Chose options for ITG
ITG full modules
PHASE2 + 2.5
ITG pilots
Phase 2.5 report
Three white papers
Glossary of terms
Decided on MWCNT-polymer
Criticality
PHASE1
PHASE3
This is a decision-making workshop
This is a decision-making workshop
• Chose options for ITG
• Aim at low barriers towards wide adoption
FP7 SUN etc,
PHASE3
NSF –EPA
Lifecycle centers
ITG full modules
PHASE2 + 2.5
ITG pilots
Phase 2.5 report
Three white papers
Glossary of terms
Decided on MWCNT-polymer
Criticality
PHASE1
Adoption
of methods
FP7 SUN etc,
Adoption
of methods
NSF –EPA
Lifecycle centers
ITG full modules
ITG pilots
Phase 2.5 report
PHASE3
Three white papers
PHASE2 + 2.5
Glossary of terms
Decided on MWCNT-polymer
Criticality
PHASE1
Adoption to
Nanomaterial in solid matrix:
pigments, CNTs, fillers, …
in coatings, plastics, metals…
MWCNT-polymer
pigments, fibers,
fillers, … in coatings,
plastics, metals…
Convening the SC to a Decision Session
(Day 2 Plenary Session, after lunch)
The SC shall take the following decisions:
1) How appropriate is the approach to developing a pilot phase
workplan? What portions need to be changed in order to move on
to methods development?
2) Prioritize modules by the SC view on:
 The relevance of the scenario
 The probability of success of the work plan elements as
developed by the breakout groups
3) Take a GO / REVISE / STOP decision on each module (sanding,
abrasion, weathering) where :
7
GO:
• ITG is charged to realize the pilot lab work,

With SC acknowledgement that independent decisions will
be made on finalizing the workplan(s).
• Manufacturers Liason Group (MLG) will be
•
approached for industrially relevant samples as
proposed by work plan
SC responsible for (mainly intramural) resources
 If funding is identified through the project, it will be issued

in an open solicitation
Otherwise, with the exception of funding to coordinate the
ITG, all resources are assumed to reside in participating labs
• Further decision item: timeframe
8
STOP:
• SC NanoRelease sees no value in an interlaboratory study to develop methods.
(Are there scenarios in studies in the literature,
or being proposed for evaluation that, at this
time, would not be useful to use to develop
broadly accepted methods?)
9
REVISE:
ITG (or other SC group) charged to
• Describe unacceptable uncertainties with regard to
workplan elements, and where possible
 Propose solutions that allow a “GO” decision
 Frame proposals for study to advance the field and for
consideration by the SC
• (Note: probably by experiments, since literature is exhaustively covered
by now).
• Timeline to achieving a “GO” decision (or a STOP)
10