Transcript Document
Commercial HVAC Program Presented by: Lauren MacMillan B.Comm. Darin Ostrowsky, P.Eng. Jamie Hopkins B. Comm. January 31, 2008 Condensing Boiler Market Share 60% 50% 40% 30% 20% 10% 0% 2003-2005 2006 2007 Program Achievements 2006 2007 Total Number of Applications 75 90 165 Incentives Paid Out $165,000 $900,000 $1,065,000 Annual Savings (m3) 372,500 1,032,400 1,404,900 GHG Reduction (tonnes) 708 1,964 2,672 Saving equivalents • Natural Gas • Heat for 660 average Manitoba homes each year. • 16 million pounds of steak on a natural gas BBQ • GHG reductions • 300,000 trees not harvested • 750 cars not driven each year What’s New • No more tiered incentives • New incentives for domestic hot water • New incentives for ventilation air • Heat load calculation required to calculate incentive No more tiered incentives • Fixed component of the incentive structure has been eliminated • Incentive factors are now the same regardless of size of boiler or use Detailed Heat Load Requirements • Transmission heat load (100% eligible) • Infiltration heat load (100% eligible) • Ventilation heat load (partially eligible) • Domestic hot water (partially eligible) Old Boiler Co. XYZ Boiler Mfg. KR-2750 800 X 350 X S-2000-Cond 750 2,000 2,750 1,873 X 27 yrs X 2,750 2,750 92.3%. 2,000 MUA Unit 2,000 1,873 $8 1,120 2,750 490 263 1,873 2,000 $14,984 1,873 Rewards Program • Installers – name on application • Random monthly draw for each completed application for boilers. • Rewards – gift cert., tickets, Hydro swag Reference Material Reference Material • www.hydro.mb.ca/psfb Commercial HVAC team • • • • • Darin Ostrowsky Lauren MacMillan Vicki Einarson Jamie Hopkins Power Smart Commercial Sales • Dan Yurkiw • Sam Fay • Tom Garbolinski • John Moroz • Cynthia Hyrich Custom Measures Program • Incentives for measures that save Electricity and Natural Gas. • Includes measures that Power Smart does not currently have a program for. • Variable Speed Drives, Direct Digital Control System Upgrades, High Efficiency Motors, Demand Control Ventilation Systems. Custom Measures Program • Electric and Natural Gas $0.20 /kWh $0.30 /m3 • Feasibility Study 50% of the first $5,000 up to 25% of the remaining portion to a maximum of $10,000 per study Questions or Feedback ???