Transcript Slide 1

Southern Morava Region Sewerage and Wastewater Treatment
Master Plan
Preparation of a Sewerage &
Wastewater Strategic Master
Plan for the Southern Morava
Region and Tender
Documents for Construction
of a "Model" WWTP
Izrada Strateškog plana razvoja
kanalizacione mreže i
tretmana otpadnih voda u
slivu Južne Morave i priprema
tenderske dokumentacije za
konstrukciju “Modela”
postrojenja za preradu
otpadnih voda
An EU funded project managed
by the European Agency for
Reconstruction
Projekat je finansiran od strane
Evropske Unije pod upravom
Evropske Agencije za
Rekonstrukciju
1
Southern Morava Region Sewerage and Wastewater Treatment Master Plan
An EU-funded project managed by the European Agency for Reconstruction
17/07/2015
Southern Morava Region Sewerage and Wastewater Treatment
Master Plan
Project Area:
Područje projekta:
2
Southern Morava Region Sewerage and Wastewater Treatment Master Plan
An EU-funded project managed by the European Agency for Reconstruction
17/07/2015
Southern Morava Region Sewerage and Wastewater Treatment
Master Plan
Characteristics of the Project
Area:
Karakteristike projektnog
područja:
 About 16,000 km2
 Oko 16 000 km2
 About 1 million inhabitants
 Oko milion stanovnika
 25 Municipalities
 25 opštine
 24 Named Urban Centres
 24 gradska centra
 About 100 major industries
 Oko 100 većih industrijskih
pogona
3
Southern Morava Region Sewerage and Wastewater Treatment Master Plan
An EU-funded project managed by the European Agency for Reconstruction
17/07/2015
Southern Morava Region Sewerage and Wastewater Treatment
Master Plan
 Project Objectives:
–
To strengthen the protection of
water resources, water quality
and public health
–
Provision of improved conditions
for increased investment in
wastewater treatment and
sewerage, and protection of
ground and surface water
 Project Outputs
 Ciljevi projekta:
- Povećati zaštitu izvora vode, kvalitet
vode i javnog zdravlja
- Obezbediti bolje uslove za veća
ulaganja u sisteme za prečišćavanje
otpadnih voda i kanalizaciju i zaštitu
podzemnih i površinskih voda
 Rezultati projekta
–
Sewerage and Wastewater
Treatment Master Plan
- Strateški plan razvoja kanalizacije i
tretmana otpadnih voda
–
WWTP Design and Tender
Documents
- Izrada tehničke dokumentacije
postrojenja za preradu otpadnih voda
i priprema tenderske dokumentacije
4
Southern Morava Region Sewerage and Wastewater Treatment Master Plan
An EU-funded project managed by the European Agency for Reconstruction
17/07/2015
5
Southern Morava Region Sewerage and Wastewater Treatment Master Plan
An EU-funded project managed by the European Agency for Reconstruction
17/07/2015
Major Outputs
Glavni rezultati
 Full Master Plan ready for
financing
 Potpun Strateški plan spreman
za finansiranje
 GIS based data base for whole
region
 GIS baza podataka za čitavo
područje
 Preliminary design of priority
investments
 Preliminarni projekat o
prioritetnim ulaganjima
 Design Manual for good
practice
 Smernice za pripremu tehničke
dokumentacije
 Detailed design for small
WWTP
 Glavni projekat za manje
prostrojenje za prečišćavanje
otpadanih voda
6
Southern Morava Region Sewerage and Wastewater Treatment Master Plan
An EU-funded project managed by the European Agency for Reconstruction
17/07/2015
Southern Morava Region Sewerage and Wastewater Treatment
Master Plan
 2 years
 2 godine
 Project office in Nis
 Projektna kancelarija u Nišu
 Permanent staff of 8
 8 osoba sa stalnim
angažmanom tokom projekta
 Total staff of 49
 20 international experts
 Ukupan broj angažovanih na
projektu je 49
 21 Serbian experts
 20 medjunarodnih stručnjaka
 21 stručnjak iz Srbije
7
Southern Morava Region Sewerage and Wastewater Treatment Master Plan
An EU-funded project managed by the European Agency for Reconstruction
17/07/2015
Southern Morava Region Sewerage and Wastewater Treatment
Master Plan
Main findings:
 50% of the population connected
to sewer systems
 In total 1,085 km of primary
sewers.
 29 pumping stations
 5 wastewater treatment plants
with capacity of 49,000 PE (5%
of the total domestic wastewater
flow)
 Three plants need major
reconstruction
Najbitniji zaključci:
- 50% stanovništva povezano na
kanalizacioni sistem
- ukupna dužina primarne mreže iznosi
1 085km
- ukupno postoji 29 pumpnih stanica
- postoji 5 postrojenja za prečišćavanje
otpadne vode kapaciteta 49 000 ES (5%
ukupne količine otpadne vode iz
domaćinstava)
- potrebna kompletna rekonstrukcija tri
(3) postrojenja za prečišćavanje
8
Southern Morava Region Sewerage and Wastewater Treatment Master Plan
An EU-funded project managed by the European Agency for Reconstruction
17/07/2015
9
Southern Morava Region Sewerage and Wastewater Treatment Master Plan
An EU-funded project managed by the European Agency for Reconstruction
17/07/2015
Southern Morava Region Sewerage and Wastewater Treatment
Master Plan
Future Requirements
Buduće potrebe

60 projects identified

Identifikovano 60 projekata

Future wastewater load in project area:

Buduće opterećenje otpadnom vodom na
području projekta:
–
250,000 m3/day
–
1.1 million PE
- 250 000 m3/dan
- 1,1 milion ES

21 wastewater treatment plants

21 postrojenje za prečišćavanje

105 pumping stations

105 pumpnih stanica

749 km of connecting sewers

749 km primarne kanalizacione mreže

Investments needed

Potrebne investicije
–
300 million Euros for the master plan
- 300 miliona Evra za master plan
–
200 million Euros for local sewer networks
- 200 miliona Evra za lokalne kanalizacione
mreže
10
Southern Morava Region Sewerage and Wastewater Treatment Master Plan
An EU-funded project managed by the European Agency for Reconstruction
17/07/2015
11
Southern Morava Region Sewerage and Wastewater Treatment Master Plan
An EU-funded project managed by the European Agency for Reconstruction
17/07/2015
Southern Morava Region Sewerage and Wastewater Treatment
Master Plan
 Ranking of Projects
– Phase 1: 0-5 years
– Phase 2: 6-15 years
– Phase 3: 16-25 years
 Rangiranje projekata
- Faza 1: 0-5 godina
- Faza 2: 6-15 godina
- Faza 3: 16-25 godina
12
Southern Morava Region Sewerage and Wastewater Treatment Master Plan
An EU-funded project managed by the European Agency for Reconstruction
17/07/2015
Southern Morava Region Sewerage and Wastewater
Treatment Master Plan
Methodology used for
ranking

Multi Criteria Analysis (MCA)
Primenjena metodologija
pri rangiranju

Višekriterijumska analiza (VA)
–
Costs
–
Troškovi
–
Environment and Hygiene
–
Životna sredina i higijena
–
Social aspects
–
Socijalni aspekti
13
Southern Morava Region Sewerage and Wastewater Treatment Master Plan
An EU-funded project managed by the European Agency for Reconstruction
17/07/2015
Southern Morava Region Sewerage and Wastewater
Treatment Master Plan
Top-10 results
rank
number
1
2
3
4
5
6
7
8
9
10
project
points
Prokuplje
Niš
Leskovac
Pirot
Vranje
Vlasotince
Lebane
Kuršumlia
Prešovo
Alexinac
79.8
66.9
61.5
58.6
58.5
56.7
51.6
50.6
48.8
47.7
investment
Euro
8,8
53,7
15,4
12,5
13,9
5,6
7,3
4,8
6,9
8,7
investment
EUR/PE
240
180
190
200
190
250
390
300
240
240
14
Southern Morava Region Sewerage and Wastewater Treatment Master Plan
An EU-funded project managed by the European Agency for Reconstruction
17/07/2015
O&M
EUR/PE.y
14.14
12.42
12.52
13.16
13.83
18.41
21.67
19.11
13.22
13.21
Southern Morava Region Sewerage and Wastewater Treatment
Master Plan
 Phase 1:
 Faza 1:
– Prokuplje
– Prokuplje
– Niš
– Niš
– Leskovac
– Leskovac
– Pirot
– Pirot
– Vranje
– Vranje
105,000,000 Euro
105,000,000 Euro
15
Southern Morava Region Sewerage and Wastewater Treatment Master Plan
An EU-funded project managed by the European Agency for Reconstruction
17/07/2015
16
Southern Morava Region Sewerage and Wastewater Treatment Master Plan
An EU-funded project managed by the European Agency for Reconstruction
17/07/2015
17
Southern Morava Region Sewerage and Wastewater Treatment Master Plan
An EU-funded project managed by the European Agency for Reconstruction
17/07/2015
Southern Morava Region Sewerage and Wastewater Treatment
Master Plan
Thank You
Hvala
18
Southern Morava Region Sewerage and Wastewater Treatment Master Plan
An EU-funded project managed by the European Agency for Reconstruction
17/07/2015