FRMAC T echnical and Operational Update NREP April 2009

Download Report

Transcript FRMAC T echnical and Operational Update NREP April 2009

FRMAC
Technical and Operational
Update
NREP April 2009
Panel discussion
Questions welcome!
1
FRMAC
Technical and Operational
Update
Information & New Directions for NIMS Integration
Colleen O’Laughlin
FRMAC Augmentation
Robert Augdahl
FRMAC Assessment Methods – The New EPA PAGs
Arthur Shanks
FRMAC Data Management – Paperless FRMAC
Harvey Clark
FRMAC Product Distribution – CMweb
Rajah Mena
New Line of FRMAC Data Products – Briefing Products
Harvey Clark
Official Use Only
2
CM/FRMAC
Colleen O’Laughlin
U.S. Department of Energy
National Nuclear Security Administration
Work with other Agencies
•
•
•
•
•
•
•
•
DoD – MOU
EPA - PAG Manual, RAD/Chem, ICS
FEMA – IPX’s, ICS/MACC
NASA – Mars Launch Support
(postponed), ECAMS MOU
NRC – IPX’s
VA – Support
Advisory Team – Pop. Monitoring
FRMAC Working Groups (Interagency)
Empire 09
• National Level Exercise
• 3 Phases
• Phase I Table-Top discussion of the first 48 hours
• Phase II Full-Scale Field exercise, 48-120 hours
• Phase III Table-Top discussion, Intermediate/longterm recovery, 45 days
•
•
•
•
RDD incident in an urban environment
Address Lab analysis
Staffing augmentation
Transfer FRMAC responsibility, DOE to EPA
Exercises
•
•
•
•
•
•
•
IPX-10 - 3
IPX-11 - 6
Diablo Bravo – Weapons
Empire – Urban RDD
Liberty Radex – Long-term Recovery
NLE-2010 - IND
NLE-2012 – FRMAC
FRMAC ICS Implementation
• Ensure FRMAC’s ability to coordinate
and manage Federal radiological
monitoring and assessment as a
discrete organizational unit
• Collect and asses radiological data
based on incident command priorities
for incident planning and decision
processes
FRMAC NIMS Implementation Plan for Single Event
DRAFT 01-07-09
LEGEND
DOE
Multiagency Coordination
System MACS
Incident Command/
Unified Command
Unified Command
State, Tribal and Local
Joint Field Office
FRMAC Reporting Line
* = Assumed
Operations
Safety Officer
Public Information
Office
PIO
Liaison Officer
FRMAC
Liaisons
Logistics Section
Finance/Admin
Section
FRMAC
These elements will be collocated.
All FRMAC elements will remain under
the administrative and policy control of
their respective Department/Agency and/
or the FRMAC
Planning
Section
Advisory Team
FRMAC Director
Located IC/UC #
Information Exchange
DOE Rad Support
to Operations
Section Chief
The FRMAC and Advisory Team
Exchange Information
Between the IC/UC, MACS
and JFO thru appropriate channels
#
FRMAC Director will most likely be located
at an Incident Command post supporting
the Senior Planning and Response Staff
For Multi-IC/UC FRMAC
may be addressed thru MACS
Support to FRMAC, RAP and UC
Consequence Management
Home Team
Operations
Section
FRMAC
Manager
Assessment
Manager
Health &
Safety
Monitoring Manager
Field Monitoring &
Sampling Teams
Laboratory
Analysis
Manager
AMS
FRMAC
Emergency
Worker
Support*
Population
Monitoring*
Air
Operations*
All red boxes will interface.
DHS NOC/FEMA
NRCC
CAT MACC*
RRCC
RRCC
FEDERAL &
STATE
COORDINATION
LEVEL
State
JFO
State
JFO
State
JFO
State
EOCs
State
JFO
Federal Radiological
Monitoring and
Assessment
(FRMAC) ***
AREA
COMMAND**
LOCAL,STATE &
FEDERAL TACTICAL
LEVEL
Control
ICP
ICP
ICP
FRMAC
FWD Monitoring
Coordination
Info Sharing
* If there is only one RRCC, the CAT MACC may be co-located with the RRCC
** Representative of Area Command or Unified within each JFO
*** FRMAC will locate at the nearest suitable site to the Area/Unified Command w/forward monitoring at incidents sites
Information
• State/FRMAC Bi-annual Conference
Call – Last Wednesday of January &
July
• Mass E-mail
• Manuals
• [email protected]
Official Use Only
10
Augmentation
Colleen O’Laughlin
11
Purpose
• To provide additional personnel and
expertise to the Federal Radiological
Monitoring and Assessment Center.
Before
After
Capabilities
• Surge capacity to supplement responders
• Increased field analytical capacity and
capabilities
• Mobile Laboratory Resources
Interagency
• Department of Energy
• Radiological Assistance Program
• National Laboratories and other DOE
sites
• Other Federal Agencies
• EPA
• CDC
• DHS
- FDA
- USDA
- NRC
Our First Test
• Empire 09 – Albany, NY
• 130 DOE responders
• Consequence Management Response
Team, Nevada
• RAP Regions 1, 2, 3, New York , Tennessee,
Georgia
• Sandia National Lab, New Mexico
• Los Alamos National Lab, New Mexico
• Lawrence Livermore National Lab,
California
• And a full cast of other state and federal
players
FRMAC Assessment WG
Arthur Shanks
Sandia National Laboratories
16
New Assessment Calculations
• Developed and Incorporated the "avoidable
dose" concept into the Deposition Derived
Response Level (DRL) and Exposure Rate
DRL methods,
• Developed and Incorporated the ability to
calculate 'delayed entry' worker protection
guidance,
• Developed and Implementing Alpha DRL, and
Beta DRL methods,
Official Use Only
17
Assessment Method Updates
• Developing additional FRMAC
assessment methods in conjunction with
OGT (e.g., ingestion pathway analysis,
resuspension factor, dose to exposure
conversion factor).
• Held 2 Assessment WG meetings in the
last year to work on and finalize several
of the new methods:
• Several sub-work groups have been spun off
of the Assessment WG
Official Use Only
18
Manual and Turbo FRMAC
Revisions
• Revising FRMAC Assessment Manual.
• To date, 10 revised methods have been drafted for
AWG review and approval.
• Expect draft manual out for technical
review in fall of 2009.
• Turbo FRMAC 2009 Release April.
• Incorporates newly developed methods that have
been approved by Assessment WG
Official Use Only
19
CMHT/Assessment Actions
• CMHT resource has been an evolving
and very successful new capability
• Tested in several exercise
• Supported the real-world NIST Event
• CMHT Assessment Outreach
• HT Assessment has been integrated into all
RAPTER Trainings
• Supported several IPX events
Official Use Only
20
Update on Paperless FRMAC
An Electronic Data Management Enterprise
Replacing
Paper-Based Data Management
Harvey Clark
Remote Sensing Laboratory
21
Goals & Objectives
• Goal – Move data faster, farther, and
better through telemetry, automation,
and networking
• Objectives
• Assimilation
• Collaboration
• Dissemination
Official Use Only
22
FY09 pFRMAC Goals
•
•
Add samples and lab analyses
Other features
•
•
•
•
One-Button CMweb upload
Total accountability
Archive Utility
EPA Relationships
Official Use Only
23
Database – RAMS
Radiological Assessment and Monitoring System
Official Use Only
24
RAMS – Key Features
•Version 2
•6 Types of Samples
•Lab & In-situ
•Chain of Custody
•Bulk Upload (EDDs)
•Version 1
Official Use Only
•Field Data
•Search Utility
•Mapping Utility
•Measurement Sets
25
RAMS – Workflow Management
Action Item Tracking
Work Product Approval
Official Use Only
26
FRMAC Product Distribution
CMweb:
A Unified Web Site for FRMAC, CMHT, and
NARAC/IMAAC Product Distribution
RaJah Mena
Remote Sensing Laboratory
27
CMweb:
A Unified Web Site for FRMAC, CMHT, and
NARAC/IMAAC Product Distribution
Official Use Only
28
Access to FRMAC, NARAC/IMAAC and CMHT
products has been unified under CMweb
• https://cmweb.llnl.gov/web is a single Web site for DOE
NA42 asset public information
• Login to CMweb secure, password-controlled site
provides access to the following (if it has been shared
with you):
• Working group information, meeting notes,
documents, manuals, user guides, etc.
• FRMAC, NARAC/IMAAC and CMHT model/data
products for current and historical
incidents/exercises (note: CMweb will be utilized for
Empire 09, June 2009)
Official Use Only
29
Your
Account
Toolbar
Emergency Contact
Information
System
Notifications
Notifications
of folders,
model runs,
books, files
that have
been shared
with you
Operations Info:
-Event Folders
-Exercise Folders
-Meeting Notes
Documentation
Official Use Only
30
FRMAC Documents, Meeting Notes and
Working Group information can be found on CMweb
Official Use Only
31
During an Exercise or Event, FRMAC and
NARAC/IMAAC products will be available via CMweb
Official Use Only
32
FRMAC and NARAC/IMAAC technical products
are currently available, with the new briefing
product format coming soon
Official Use Only
33
Update on Briefing Products
Communicating Technical Issues to a
Non-Technical Audience
Harvey Clark, Remote Sensing Laboratory
34
Briefing Product Initiative
• Additional Product Line Tailored to:
• Briefing key leaders
• Decision makers without SMEs
• Motivation
• Customers Changing
• HSC issues tasking
• Does not replace Standard Products
Official Use Only
35
Briefing Product Initiative
• Developed with Stakeholders
• 5 Rounds of reviews
NARAC, IMAAC, FRMAC, NA-42
PAOs – EPA, DHS & DOE
HSC, OSTP & Advisory Team
• Final until after Empire 09
• Standard Products Next
Official Use Only
36
Briefing Product Features
• Targets key leaders and decision makers
•
•
•
•
•
Plain English, No jargon
Highlights key points
Cites PAG and consensus recommendations
Explanation page
Layouts for projection & speaker notes
Official Use Only
37
Briefing Product Suite
•
•
•
•
•
•
•
Modeled Evacuation and Sheltering Areas – Plume Phase
Modeled Evacuation and Sheltering Areas – Post-Plume Phase
Relocation Areas
Areas of Concern for Agricultural Products
Default Evacuation and Sheltering Area
Worker Protection Area
Early Heath Effects
Hyperlinked
End of Presentation
Official Use Only
38