Projects - ..:: SinoTharwa Drilling Company ::.. Offshore

Download Report

Transcript Projects - ..:: SinoTharwa Drilling Company ::.. Offshore

Projects
Projects is one of the sectors of the engineering
department that is paid a great attention because it
supports all other departments to achieve its
requirements and goals easily and according to the
global standards and specially API standards and in
time although the time provided to it is limited and
critical.
Why we start any project?
There are many points that could lead to start a project
1.
2.
3.
4.
The company's expansion, by starting up a new rig.
The company's equipment upgrading, by installing a new equipment.
Modification done to simplify and assist the operation of the rig and
make it comply with the global standards, especially API standard.
Problems facing operation or maintenance crew due to breakdowns
Project planning
Engineering department does believe
that project planning is the key to
succeed any project; projects can run
on time and interact effectively with
both operators and suppliers.
Everyone involved understands what
is wanted and emerging problems are
foreseen (and dealt with) long before
they cause damage.
EXCUTE
Rig in time &Safely
SELECT
Professional personnel
ISSUE
All Materials Needed
Plan
The Time Frame
Projects done
2-1
New rigs & Refurbishing old rigs
2-2
Top Drive & new equipment installation
2-3
Equipment overhaul
2-4
In progress projects
2-1
Sinotharwa Rigs
Rig up project for the following rigs:
Rig ..………………………………………start operation
ST# 1 (2000 HP)……………………………January,2006
ST# 2 (1500 HP)…………………………....January,2006
ST# 3 (2000 HP)……………………………January, 2007
ST# 4 (2000 HP)……………………………September,2007
ST# 5 (1500 HP)…………………………..April ,2008
ST# 6 (1500 HP)…………………………..End of April ,2008
ST# 7 (1000 HP)…………………………..July ,2008
ST# 8 (1500 HP)…………………………..June,2008
ST# 9 (2000 HP…………………………...March, 2008
ST# 10 (1500 HP)……………………….....End of June,2008
ST# 11 (2000 HP)……………………….....End of Oct.,2008
ST# 12 (2000 HP)………………………….Febrauary,2009
ST# 21 (650 HP-work over)………………January, 2007
ST# 22 (650 HP-work over)………………November ,2007
ST#23 (650 HP-work over)………………End of March ,2008
ST#24 (650 HP-work over)………………End of August,2008
Rigs Refurbishing
St1 Refurbished , April 2007
Upgrade the rig
(Mast, substructure
sandblast including
MPI)
Mud System
modification &
upgrading upon the
operator needs &
operation demands
Rigs Refurbishing
St2 Refurbished , December 2007
Modify the Rigs (Mast,
sub base sandblast
steel fabrications,
renew rig floor
including MPI)
Fabricated high
pressure mud
pump lines & standard
standpipe manifold
2-2
Top Drive & new equipment installation
2-1) Top Drive
Reasons to use Top Drive over classical drilling equipment
So we
Install the Top Drive on the following Rigs:
•(Varco
TDS-11SA)
ST#1,3,4,5,6,8,12
•(Tesco
ECI900 )
ST#9,10,11
New installed equipments
Install H2S & LEL
system on all rigs
Install new
alarm panels for
main engines
Install SCR CO2
fire fighting
system on all rigs
Man Rider
Installation for
all rigs
Install Fuel
Purifier on all
rigs
Isolate all
engines
exhaust pipe
manifolds
2-3
Equipment overhaul
ST#1,9
Complete overhaul for the Power Tong
ST#2
Top end overhaul for the ShanDong power engine
Complete overhaul for the ShanDong power engine
ST#5,7
Complete overhaul for the Air hoist 5 ton
ST#10
Complete overhaul for the Crown Block
ST#1,21
Complete overhaul for Mud Pump
2-4
In progress projects
2-4-1) Jack Up rig























Start fabrication : By End of year 2008
Electrical Rig ,VFD system
MAST 170 ft clear height
Rotary table 49 ½ ”
TDS -8SA top drive system
Drawworks power: 4600 HP.
Operating water depth: 400 ft (122 m).
Drilling depth: 30000 ft (9,144 m).
Quarters capacity: 120 persons.
3 -Mud pumps 2200 HP.
Power system of 5 Cat Engines ( 3516B)
& 1 Emergency Cat Engine (3512).
Three pedestal cranes with 120 ft (36.6 m) boom.
Horizontal & vertical pipe handling systems.
Three lifeboats (60 person each).
Four life rafts (35 persons each).
Cascading shaker system & 1 vacuum degasser.
Storage of 4,720 bbls fuel oil.
Storage of 10,540 bbls drill water.
Storage of 2,180 bbls potable water.
Storage of 15,800 tons preload ballast.
Storage of 17,400 cu.m bulk mud/cement.
Storage of 3,960 bbls active & reserve pits.
5000 sack storage.
2-4-2) Badr yard
Badr yard is one of the expansion
projects that our company is looking
forward to complete as soon as possible.
Badr yard will play a very big role for
the engineering department which will
deduct the outsourcing and hiring
cost of workshops to make overhauls
in.