A better planning process for national infrastructure projects

– A

simpler

process –

Faster

decisions – A

fairer

approach –

Engaging

people and communities –

Independent

judgement professional – Cutting

costs

independent, impartial, inclusive

National Policy Statements (NPSs)

– Overall energy policy * – Renewables * – Fossil * – Electricity networks * – Oil and gas * – Nuclear * – Ports * – National networks – Airports – Water supply – Waste water – Hazardous waste

independent, impartial, inclusive

Future reform

Commitment by Government to an efficient and democratically accountable fast-track process for major infrastructure projects.

– Energy NPSs to undergo further consultation – New primary legislation – Localism Bill – A new Major Infrastructure Planning Unit as part of the Planning Inspectorate (Spring 2012) – The expertise, processes and special character of the IPC will be retained – Secretary of State to make final decisions – Existing procedures remain during transition.

independent, impartial, inclusive

independent, impartial, inclusive

Proposals

Humberside Projects

– Hull Biomass Power Station (Autumn 2010) – Brigg Gas Power Station (Feb 2011) – Marine Energy Park, Killingholme (March 2011) – Hornsea Offshore Windfarm (July 2012) – Triton Knoll Offshore Windfarm (Dec 2012) – Dogger Bank Offshore Windfarm (2012) – A160 Highway Improvement (TBC)

independent, impartial, inclusive

The role of the IPC

Pre-application:

– Outreach – Advice to all parties – EIA - Screening and scoping – Effective consultation

Acceptance Examination:

– Preliminary meeting – Written representations – Inquisitorial hearings

Decision/Recommendation:

– Report of justification

independent, impartial, inclusive

How our process works

Pre Application Acceptance Pre Examination Examination Pre-application advice to applicant and others.

Outreach activity to raise awareness and encourage effective consultation.

28 days to decide whether to accept IPC Chair appoints Panel or Single Commissioner Initial assessment of principal issues and Preliminary Meeting.

Procedural decision on how application is to be examined.

Up to 6 months to carry out examination, principally through written representations.

Hearings led by Commissioner on specific issues, and open-floor hearings.

Decision Post Decision independent, impartial, inclusive IPC has 3 months to make recommendation. Secretary of State has 3 months to make final decision.

6 week window for legal challenge

Pre-application: effective community and organisational engagement

other organisations general public land owners & neighbours developer potential interested parties local authorities government depts & NPSs statutory consultees

IPC independent, impartial, inclusive

Total application

No shocks and no surprises

– Driven by applicant – Effective engagement with communities and LAs – Have regard to consultees – Development of draft DCO – Very limited scope to make changes post submission – Comprehensive EIA/ES

independent, impartial, inclusive

Acceptance

– Has the applicant met its pre application obligations?

– Does the Consultation Report demonstrate that consultation was effective?

– Local authorities’ adequacy of consultation representations?

– Is the application in the correct form, including necessary documentation?

– Has applicable guidance been followed, and if not, why not?

independent, impartial, inclusive

Post application: effective gathering of evidence and decision making

other organisations developers general public land owners & neighbours IPC Commissioners potential interested parties local authorities government depts & NPSs statutory consultees

independent, impartial, inclusive IPC professional services

Pre-examination

– Applicant required to publicise an accepted application – IPC moves to centre stage – Appointment of

Examining Authority

– Stakeholders register as interested parties – Relevant representations – IPC makes its initial assessment of principal issues – Preliminary meeting – Procedural decision – Timetable for examination

independent, impartial, inclusive

The examination

– Examination to be inquisitorial rather than adversarial – Statements of common ground – Local Authority produces Local Impact Report – Written representations – Hearings – Open floor – Specific issue – Compulsory purchase – IPC may appointment an assessor

independent, impartial, inclusive

Local authority leadership

– Statutory Consultee – Special Role – facilitating the process – Taking part at all stages of the process – Representing the Community – Providing objective technical evidence – Enforcement – Resources - PPA?

independent, impartial, inclusive

Statement of Community Consultation

– Developer must consult local authority on draft SoCC – Published in the local press – Developers must do what they say!

– LA comments to IPC on adequacy of consultation

independent, impartial, inclusive

Local Impact Report (LIR)

– Local authority decides form and content – Focus on the economic, environmental and social issues – Submitted at examination stage to deadline set by Commissioner – Important to start work

before

application – IPC advice note

www.independent.gov.uk\infrastructure independent, impartial, inclusive

Key Statutory Deadlines for Consultees

– – – – – – – Scoping Opinion Consultation (28 days) LA comments on draft SoCC (28 days) Pre-application consultation and publicity (min 28 days responses) LA adequacy statement within 14 days of submission.

Submission of relevant representation following application acceptance (min 28 days) Local Impact Report (approximately 6 weeks from Preliminary Meeting) Submission of detailed written representations (min 21 days)

independent, impartial, inclusive

Contact us

Hull Biomass Power Station and Marine Energy Park, Killingholme

Mark Wilson: 0303 444 5062 e: [email protected]

Brigg Gas Power Station

Tom Carpen: 0303 444 5064 e: [email protected]

Hornsea Offshore Windfarm and A160 Highway Improvement

Owain George: 0303 444 5053 e: [email protected]

Triton Knoll Offshore Windfarm and Dogger Bank Offshore Windfarm

David Cliff: 0303 444 5063 e: [email protected]

independent, impartial, inclusive

Contact us

Infrastructure Planning Commission (IPC) Temple Quay House Temple Quay Bristol BS1 6PN 0303 444 5000 [email protected] www.independent.gov.uk/infrastructure

independent, impartial, inclusive