Transcript Document

Comprehensive Basinwide Protection Recommendations
13 Primary Principals:
1.
Serve as framework moving forward
2. Establish acceptable levels of protection
3. Basin approach – multiple measures to accomplish
4. Uniform flood regulations and zoning
5. Goals for the reduction in flood flows
6. Reduce runoff rate and volume
7. Incorporate multiple purposes (FDR/NRE…)
8. Avoid or minimize adverse impacts
9. Cost effectiveness
10. RRBC to facilitate implementation of cross-jurisdictional
partnerships where possible
11. Evaluation and prioritization of plan recommendations
12. Measure and evaluate implementation of the LTFS
13. Requires a shared responsibility and commitment
•
Part of Long Term Flood Solutions Report
•
Reduce Red River main-stem flows by 20%
•
Based on 1997 Spring Flood Event
•
Applied to HEC-HMS Synthetic Hydrology
Lidar/Enhanced
Technology
RRBC-LTFS
RRWMB
Distributed
Detention
Plans
ND Comprehensive Detention
Plans
•
•
•
•
•
•
•
•
Large Scale Sites
Identification of all apparent sites
WRD Involvement
Multiple proposed conditions scenarios
Multiple Runoff Events
Establish benefit within Tributaries
Establish reduction to Red River main stem
Detailed reporting
MN Expanded Distributed
Detention Strategy
•
•
•
•
•
•
•
•
Large Scale Sites
Identification of sites required to meet
LTFS goals
Limited WD Involvement
One proposed condition
Standard melt progression event only
Establish benefit within Tributaries
Establish reduction to Red River main stem
Generalized reporting
1. Guide WD project teams – Similar to BdSWD plan.
2. “Get FDR Projects in the Queue!” - State and Local Funding
3. Identify Project Concepts for Potential Federal Funding –
Farm Bill
4. Consistency with On-going North Dakota Planning Effort
5. Potential Cost Share of FM Diversion Authority - $25 Million
– Sites upstream of Halstad
6. Identify Sites for Halstad Upstream Retention Study (HUR)
– RRBC
Detention Site
Identification
•Project Planning Tool Incorporation
•Watershed District/LGU Involvement
•Upstream of local damage areas
•Large Site Concepts (greater than 10 square miles – most in the 30 SM range)
Detention Site
Statistics
•LiDAR Derived Elevation/Storage Data
•LiDAR Derived Contributing Watershed
•Consider construction/environmental impacts of gated pool elevations
•Goal: 3” – 4” of gated storage per site (Meet LTFS Volume and Peak Goals)
Hydrologic Analysis Benefits
•Red River Basin HEC-HMS developed by the US Army Corps of Engineers
•Incorporate Identified Detention Sites
•Assume all gates closed
•25, 50, 100-yr Rainfall (10-day) & 100-yr, 10-day Runoff (Snow melt progression
included)
•Existing conditions (Pre-1997) vs Proposed Conditions (Site Outlet, Damage areas,
Reporting
USGS Gages)
•Watershed scale mapping only
•Report Summarizing Analysis
Red River Basin Commission
Basinwide Flow Reduction Strategy
Peak Flow Goal: 35% Reduction
Peak Flow Obtained: 36% Reduction