Transcript Slide 1
The Two INO Sites PUSHEP at Singara RAMMAM at Darjeeling • Underground facility for conducting experiments in Science and Engineering • First Phase : Iron calorimeter experiment using RPC for Neutrino oscillation detection. Criteria for good sites Physics issues Availability and access long term ownership Sharing / Dedicated facility Depth and all round cover Distances from Neutrino beams Time & Cost Risk factors and Safety issues Rock condition Environmental risk Seismic risk Time to install detectors for first experiment Construction cost Running cost Infrastructure Housing, Connectivity Local Help & Awareness. Muon Intensity vs. Depth in m.w.e. Present International Scenario of different underground facilities. Area around Singara PUSHEP at Singara in the Nilgiris (Pykara Ultimate Stage Hydro Electric Project) Position : Lat. North 11.5 & Long. East 76.6 Distance : 7 Km from Masinagudi 30 km from Ooty Airports : Coimbatore & Calicut ( Domestic) ; Bangalore (intl) Railhead : Chamrajnagar Climate : Moderate (12-25oC) Rainfall : Low (100-150 cm) Access : All days around the year Some basic facts about PUSHEP Some basic facts about RAMMAM Rammam at Darjeeling Dist. of West Bengal. Position : Lat. North 27.4 & Long. East 88.1 Distance : 8 Km from Rimbik, 66 Km from Darjeeling 140 Km from Siliguri. Airport : Bagdogra ( Domestic) Kolkata ( Intl.) Railhead : New Jalpaiguri Climate : Moderate ( 5-200 C) Rainfall : 300-400 cm. Access : Almost all days Map of tunnel alignments at PUSHEP Tunnel alignment at PUSHEP Alignment location Length Portal Level Vertical cover All round Cover From access Tunnel 1867 m 1019 m 1313 m > 1000 m Next to access tunnel 2129 m 1050 m 1299 m > 1000 m South of Adit 4 of hydel project 2380 m 1025 m 1340 m > 1000 m Around Adit 4 inlet of hydel project 3194 m 966 m 1453 m > 1000 m Alignment 2 preferred. Detailed report on alignment 2 already made Reverse gradient of 1:15 The detailed geological features along alignment 2 Details of Joints, Shear zones, Fracture zones identified. Rock mass rated fair to very good Map of tunnel alignments at RAMMAM Tunnel Alignments at RAMMAM Alignment location Length Portal Level Vertical cover All round cover L1/1 – N2 3251 m ~1100 m 1400 m 1250 m L1/1 – M1 3080 m ~1100 m 1405 m ~1300 m L1/1 – N1 3590 m ~1100 m 1560 m 1400 m L1/1 – N1 – O1 4850 m ~1100 m 1780 m 1650 m o Horizontal tunnel with slight gradient for exit of water. No pumping required o Adit of 2000 m as an escape route o Depending on the present need one can stop at any depth and go deeper in future All round rock cover at PUSHEP and RAMMAM Seismic zoning map of India issued by Bureau of Indian Standards,2000. Comparison of PUSHEP & RAMMAM Geo-technical data PUSHEP Rock type Charnockite (Monolith) Specific gravity 2.62-2.9 Q-factor of tunnel. medium 4 - 45: good to very good Horz. / vert. stress ratio Seepage Geological adversities Rock radio-activity 1.6 (approx.) Moist to Dry Shears, dykes, joints are mapped from both surface projections and underground tunnels 0.005 mR/hr RAMMAM Gneiss 2.79-2.84 2 – 40 ; Fair to very good Not available Moist Shears, dykes, joints are mapped from surface projections Less than 0.01 mR/hr Comparison of PUSHEP & RAMMAM (contd.) Risk factors Seismic Risk PUSHEP Zone –2 No discernible fault RAMMAM Zone – 4 No faults on alignment Environmental Risk Reserve forest. Portals are Reserve forest. Portals inside the TNEB / private are inside the WBSEB land / Govt. land. Civil unrest / Terrorism None so far None so far INFRASTRUCTURE • PUSHEP • Inspection bungalows • Surplus housing • Masinagudi exchange connected by optical fiber . Radio link with Ooty with high speed data connection • Water, Electricity • Access road, Security • Road connection to neighbouring cities good • RAMMAM • Inspection bungalow • Housing available • Telephone exchange, Optical fiber link in future • Water & electricity • Metal road to portal, security • Road connections to neighbouring cities need improvement. Helipad facility BOTH SITES NEED CLEARANCE FROM FOREST DEPARTMENT. 29 th April, 2005 MOU signed between NTPC Hydro Ltd. and WBSEB. 90 MW RAMMAM III to be commissioned by 2011. ~ 450 Crores Project WILL RESULT IN SUBSTANTIAL IMPROVEMENT IN INFRASTRUCTURE AROUND THE AREA Underground tunnel and caverns in the Singara region : New 150 MW hydel power house cavern (constructed) : 70 m x 20 m x 39 m Nearly 12 km of tunnels in the immediate vicinity of the project site and 60 km Of tunnels in the Nilgiris Underground Power House Caverns : Himalayan Geology Hydel Power Station Size of Underground Cavern Naptha Jhakri project Machine Hall – 221m X 20m X 50m Transformer Cavern – 196m X 18m X 29 m Tala H.E. Project Bhutan P.H. Cavern – 206 m X 44m X 20 m Transformer Hall – 191 m X 26.5m X 16m Chuka H.E. Project Bhutan P.H. Cavern – 141m X 24m X 38 m Larji H.E. Project P.H. Cavern – 110 m X 20 m X 42m Atmospheric muon background as a function of depth in Meters water equivalent. PUSHEP is at the same depth as Gran Sasso. RAMMAM has much more depth with a reduction of background : 1/10 of PUSHEP / Gran Sasso PUSHEP Distances from the neutrino beam lines PUSHEP RAMMAM RAMMAM CERN 7150 Km 6850 Km JHF 6550 Km 4850 Km Fermi Lab. 11300 Km 10600 Km (with 3700 Km (with no core) of core ) Facility : backgrounds and depth requirements for Future Experiments Experiment Details Depth Requirements Solar Neutrinos HERON, CLEAN 4500 m.w.e Geo Neutrinos 1 kton liquid scint. (like Borexino) Proposed 6500 m.w.e Dark Matter (WIMP) EDEL WEISS (Frejus Tunnel) Next Generation Expts. 4800 m.w.e > 6000 m.w.e MOON (100Mo) Will require 34 tons of natural Mo. ~ 6000 m.w.e. Double beta-decay A ) Tunnel & Cavern Tunnel Cost & Time Length (Km) Vertical Cost Cover (m) (Crores) Time (Month) ------------------------------------------------------------------------------PUSHEP (2) 2.13 1299 35 22 -----------------------------------------------------------------------------RAMMAM 2.69 1203 39+20* 24 3.59 1560 50+20* 31 4.85 1780 65+20* 41 ----------------------------------------------------------------------------* Rs. 20 crores for adit B) Civil work ( surface & underground) in (i) tunnel, (ii) Cavern (iii) Surface laboratory and (iv) housing/accommodation : Rs. 35 Crores C) Facilities in the cavern : i) Overhead Crane ii) Air circulating system iii) Air conditioning in the labs. iv) electrical works : Rs. 20 Crores Time needed before tunnel construction : 12 – 18 months Time needed for civil work etc. after cavern Construction : 12 – 18 months Acknowledgement GSI Chennai & GSI East Region, Kolkata TNEB & WBSEB and Department of Power, W.B. NIRM, Kolar Larsen & Tubro Possibility at ROHTANG PASS Connects Kullu – Manali valley (2100 msl) to Lahaul – Spiti valley ( 3080 msl) South Portal : 25 Km from Manali Length : 8802 m 10 m wide ; 10 m high Rock type : alternate sequence of Quartzite, Quartzitic schist and Schist Project time: 7-9 years Seismic zone : 4 Above snowline Vertical cover : up to 1910 m