ERGEG Opinion on the
ENTSO-E pilot TYNDP
Tahir Kapetanovic
ENM TF Co-Chair
XIX Florence Forum, 13-14 December 2010
ERGEG Advice on TYNDP:
Objectives …
• Create a better and more stable environment for the
TSOs and the regulators / Agency:
• By specifying explicitly what should be included in the
Community-wide electricity network development plan,
ENTSO-E will know precisely how to create it
• By defining the criteria for fulfillment / quality of the plan, the
Agency knows how to evaluate and what (possibly) to
request further if something is missing
• By defining the process for preparing the plan, the Agency
can evaluate if all stakeholders have been consulted and if
scenarios and planning principles behind the plan are
transparently communicated to the stakeholders
XIX Florence Forum, 13-14 December 2010
2
Documents & Contents
I
Communitywide, regional
and national
scenarios
European and
national
generation
outlook
Status review of previous plan
II Scenario development
III European generation outlook
Modelling of integrated system
IV
European
system
adequacy
outlook
National,
regional and
Communitywide network
development
plan
XIX Florence Forum, 13-14 December 2010
- Description of market and
power system models
- Evaluation criteria for reinforcements
Assessment of system resilience
-Existing and decided infrastructure
V -Identification of future congestions
-Identification and description of
investment projects
- System adequacy outlook
3
Criteria from Regulation
• According to Regulation (EC) No. 714/2009, the TYNDP
shall ensure:
• Non-discrimination
• Effective competition
• Efficient and secure functioning of the internal electricity
market
• Sufficient level of cross-border interconnection open to
TPA
• The planning process should be smooth, efficient,
consistent and transparent
XIX Florence Forum, 13-14 December 2010
4
Criteria - Details
• Scenarios have been prepared and applied
• Modelling of integrated network has been made
applying bottom-up and top-down approaches
• Generation outlooks have been prepared
• Assessment of the resilience of the system
• Consultation of all relevant stakeholders has been
executed and outcome of these consultations has been
documented
• Coherence between national, regional and Communitywide ten-year network development plan is met
• Monitoring report on implementation of the plans has
been prepared
XIX Florence Forum, 13-14 December 2010
5
Key Issues to be Improved
• Only two scenarios  enhanced scenario development
needed
• Network and market modelling shall serve as the basis
for the project selection
• Top-down approach and a comprehensive assessment
of resilience are needed
• Many topics addressed, but a clear connection between
topics needs to be added
• Comprehensive list of projects  prioritisation is
required
• Integration of third party projects
XIX Florence Forum, 13-14 December 2010
6
Conclusions / Next Steps
• ERGEG appreciates ENTSO-E’s initiative to provide a
pilot TYNDP and the effort to provide a comprehensive
view of key drivers for the development of the
transmission system
• Further challenges identified
• Social acceptance
• Permission procedures
• ERGEG will continue with discussions and further
support and guide ENTSO-E in the development of the
TYNDP, also within the scope of the EIP
XIX Florence Forum, 13-14 December 2010
7
Thank you for your