Transcript Slide 1
One Team – Relevant, Ready, Responsive, Reliable US Army Corps of Engineers Huntington District Southern WV 340 Environmental Infrastructure Program Sherry Adams 340 Program Manager One Team – Relevant, Ready, Responsive, Reliable US Army Corps of Engineers Huntington District Southern WV Environmental Infrastructure Section 340 Webster Krouts Creek Cabell Nicholas Wayne Lincoln Boone Boone County Mingo Pageton Fayette Greenbrier Raleigh Logan Gilbert Pocohontas Wyoming McDowell Summers Monroe Mercer Kilsyth Fayette County Marsh Fork Cool Ridge / Flattop and Piney Creek Mercer Co. and Oakvale Road One Team – Relevant, Ready, Responsive, Reliable US Army Corps of Engineers Huntington District Authorized by WRDA 92 (Sec. 340) ● ● Amended by WRDA 96 (Sec. 359) Amended by WRDA 99 (Sec. 368) ■ ● ● ● ● Increased authority to $40M Amended by WRDA 2000 (Sec. 550) 75 / 25% cost share Inventory of needs – $1.1B Scope ● Southern WV Environmental Infrastructure – Section 340 Water and wastewater Surface water resource protection and development Environmental restoration $20.2M Appropriated thru FY 05 $750K Appropriated in FY 06 (Corps) ● $2M ARC One Team – Relevant, Ready, Responsive, Reliable US Army Corps of Engineers Huntington District Water quality improvement project ● Part of a comprehensive watershed restoration plan for Dunloup Creek ■ ■ ■ ● Phase I – Design of Kilsyth Collection System and upgrade of Mt. Hope wastewater treatment plan (WWTP) Phase II – Construct WWTP upgrade at Mt. Hope Phase III – Construct Kilsyth collection system Total Corps Project Cost – $2.5M ● Kilsyth / Mt. Hope Environmental Infrastructure Design cost – $340K Construction cost – $2.1M Local Sponsor – City of Mt. Hope (25%) Source of Non-Federal funds – SCBG, DEP Stream Restoration Funds, SRF Loan Current Status ● Initiate Phase II – Mt. Hope WWTP construction One Team – Relevant, Ready, Responsive, Reliable US Army Corps of Engineers Huntington District Cool Ridge / Flat Top Environmental Infrastructure Construction of new WWTP, pump station, force main and collection system Total Corps Project Cost – $3.6M Local Sponsor – Shady Spring PSD (25%) Source of Non-Federal funds – SRF Loan, IJDC Loan, Flat Top Lake Grant Current Status ● Initiated construction Dec 05 One Team – Relevant, Ready, Responsive, Reliable US Army Corps of Engineers Huntington District Boone County PSD Environmental Infrastructure New WWTP and collection system to improve local environment Total Corps Project Cost ● ● Design Cost - $450K Construction Cost - $2M Sponsor – Boone County PSD (25%) Source of Non-Federal funds – SCBG, ARC grant, IJDC loan, IJDC grant Current Status Local ● Execute construction agreement and initiate construction of WWTP One Team – Relevant, Ready, Responsive, Reliable US Army Corps of Engineers Huntington District Stormwater Krouts Creek Environmental Infrastructure diversion 5’ x 9’ underground box culvert ● 1,250 feet long ● Project Cost – $3.3M Local Sponsor – City of Huntington (25%) Source of Non-Federal funds – WVCA, City of Huntington Current Status Total ● Complete construction Mar 06 One Team – Relevant, Ready, Responsive, Reliable US Army Corps of Engineers Huntington District Replacement ● Piney Creek Interceptor Environmental Infrastructure of gravity sewer line In close proximity to Whitestick Creek and runs through the incorporated Town of Mabscott Corps Project Cost – $1.3M Local Sponsor – Beckley Sanitary Board (25%) Source of Non-Federal funds – Beckley Sanitary Board Current Status Total ● ● Execute design / construction agreement Feb 06 Initiate construction Mar 06 One Team – Relevant, Ready, Responsive, Reliable US Army Corps of Engineers Huntington District Water system extension/upgrade to Southern Hollow Road ● ● Oakvale Road PSD Environmental Infrastructure Serves 30 new customers Additional phases allow potential of providing water service and fire protection to another 1,100 customers Total Project Cost – $830K Local Sponsor – Oakvale Road PSD (25%) Source of Non-Federal funds – State Digest, WVAWC, Mercer Co. Commission, IJDC Grant Current Status ● ● Initiate construction Mar 06 Complete construction Aug 06 One Team – Relevant, Ready, Responsive, Reliable US Army Corps of Engineers Huntington District Completed 340 Environmental Infrastructure Projects 340 Projects Total Project Cost (000s) Date PCA Executed Date Complete Gilbert Sewer (Design) $209 Jun 95 Dec 97 Gilbert Sewer (Construction) $3,107 Mar 98 Dec 99 Mercer Water (Design) $209 Aug 95 Jun 98 Mercer Water (Construction) $2,333 Sep 98 Mar 01 Krouts Creek (Design) $344 Dec 98 Sep 00 Pageton (Design) $156 Oct 99 Jun 01 Pageton (Construction) $2,367 Sep 01 Sep 02 Fayette Co. Wastewater (Design) $2,367 Sep 99 Aug 01 One Team – Relevant, Ready, Responsive, Reliable US Army Corps of Engineers Huntington District Questions