Transcript Slide 1

I3 EURONS
Status report of the
AGATA joint research activity
EURONS : Integrated Infrastructure Initiative (I3) for Nuclear Structure
45 contractors and 33 other institutions from 27 countries
27 activities:
8 Trans-National Access (TNA) to research infrastructures,
9 Joint Research Activities (JRAs), e.g. AGATA,
8 Networking activities
Contract for the EURONS project has been signed (~14 M€)
Project started on 1.1.2005 and ends on 31.12.2008
 Coordinator and management team : GSI
 Scientific manager : A. Mueller (IN2P3)
 Project coordination committee (PCC)
 comprises one representative from each activity
 1st PCC meeting held at Funchal (Madeira) on 7./8.2.2005
 General assembly (GA)
 comprises one representative from each institution
 1st GA planned for September 2005
Wolfram KORTEN, JRA-02 AGATA
AGATA week, GSI, 21. February 2005
I3 EURONS
Minutes of the first PCC meeting
 Presentation of all activities
 Activity information sheet (AIP)  reporting every 6 months
 Monitoring the progress of the project (milestones & deliverables)
 Preparation of the (annual) reports (management & activity)
 Discussion of management organization, payments etc.
 Executive board of the PCC was elected (3x2 members + manager)
 Advance payment from GSI in early March :
 2/3 of request for the first 18 months’ period
 Yearly payments after submission of each annual report
 Audit certificate needed from each contractor every 2 years
 check with your local administration
 Consortium agreement (CA) distributed to all institutions
 Comments by the end of February
 Signatures needed by March 31st, 2005
 “Late comers” will accede to the contract
Wolfram KORTEN, JRA-02 AGATA
AGATA week, GSI, 21. February 2005
I3 EURONS
AGATA JRA : Objectives and Tasks
Objectives:
Development, construction, commissioning and evaluation of the first modules for an advanced
gamma ray tracking array (AGATA) including digital front-end electronics and a data acquisition
system capable of handling the gamma-ray tracking procedure
Description of work:
Task T-J02-1: General Tasks
Subtask T-J02-1.1: Conceptual design
Subtask T-J02-1.2: Subsystem commissioning
Subtask T-J02-1.3: Prototype commissioning
Task T-J02-2: Detector module and infrastructure
Subtask T-J02-2.1: Characterization
Subtask T-J02-2.2: Assembly
Subtask T-J02-2.3: Tests
Task T-J02-3: Local Level Processing system
Subtask T-J02-3.1: Electronics
Subtask T-J02-3.2: Pulse-shape analysis
Subtask T-J02-3.2: PSA evaluation
Task-T_J02-4: Global Level Processing system
Subtask T-J02-4.1: Trigger and system integration
Subtask T-J02-4.2: Gamma-ray tracking
Subtask T-J02-4.3: DAQ
Task-T_J02-5: MC simulation and data analysis
Subtask T-J02-5.1: Physics emulator
Subtask T-J02-5.2: Data bases
Subtask T-J02-5.3: Analysis routines
Wolfram KORTEN, JRA-02 AGATA
AGATA week, GSI, 21. February 2005
I3 EURONS
Tasks and Responsibilities
Task Nr.
1
2
3
4
5
Task name
General Tasks
Detector module &
Infrastructure
Local Level
Processing
Global Level
Processing
MC Simulations &
Data Analysis
1st sub-task
Conceptual design
of the full
AGATA array
INFN Padua
Characterisation of
asymmetrically shaped 36fold segmented
Ge detectors
Univ. Liverpool
Prototype electronics
for analogue and
digital signal
processing
CCLRC Daresbury
Global trigger,
synchronisation and
integration
of ancillary detectors
INFN Padua
Conceptual array
design and MonteCarlo simulations incl.
ancillary detectors
INFN Legnaro
2nd sub-task
Commissioning of
all sub-systems
Task leaders
Cryostat and pre-amplifier
developments, detector
module assembly and
acceptance test
Univ. Köln
Pulse-shape analysis
(PSA) algorithms
TU München
Gamma-ray tracking
(GRT) algorithms
CSNSM Orsay
Databases for event
data storage
IPN Lyon
3rd sub-task
Commissioning of
the full AGATA
prototype system
Project leader
Test benches and infrastructure for
“in-beam” tests, incl.
ancillary detectors
IReS Strasbourg
Simulation of detector
signals and
comparison
with experimental data
CEA Saclay
Data acquisition, and
storage, run control,
graphical users
interface
IPN Orsay
Generic data analysis
routines
Uppsala Univ.
Wolfram KORTEN, JRA-02 AGATA
AGATA week, GSI, 21. February 2005
I3 EURONS
Milestones
Milestones :
Short title
Date
due
M-J02-1.1
Conceptual design of the full array finalised
06/05
INFN-Padua
M-J02-1.2
AGATA demonstrator sub-systems commissioned
12/07
Task leaders
M-J02-1.3
Final report delivered to managing institution
12/08
Project leader
M-J02-2.1
Asymmetric Ge detector prototype characterized
06/06
U-Liverpool
M-J02-2.2
AGATA prototype triple-cluster module assembled
12/06
U-Köln
M-J02-2.3
Infrastructure for in-beam tests commissioned
12/07
IN2P3-IReS
M-J02-3.1
Prototype local level processing electronics delivered
12/05
CCLRC
M-J02-3.2
Pulse-shape analysis algorithms optimised
06/06
TUM/IPNO
M-J02-3.3
Pulse-shape analysis performance evaluated
06/07
CEA-DSM
M-J02-4.1
Prototypes for data acquisition hardware delivered
12/05
INFN-Padua
M-J02-4.2
Gamma-ray tracking algorithms optimised
06/06
IN2P3-CSNSM
M-J02-4.3
Data acquisition system commissioned
06/07
IN2P3-IPNO
M-J02-5.1
Physics emulator integrated in MC simulations
12/05
INFN-Legnaro
M-J02-5.2
Event data base storage commissioned
12/06
IN2P3-IPNL
M-J02-5.3
Analysis routines for event data commissioned
12/07
U-Uppsala
Wolfram KORTEN, JRA-02 AGATA
Date
accomp.
Remarks/ lead
participants
AGATA week, GSI, 21. February 2005
I3 EURONS
Deliverables and lead contractors
Type[ii]
Disseminat
ion level[iii]
Remarks :
12/07
R/PU
Project
leader
CEA-DSM
12/08
R/PU
JRA
coordinator
Delivery of prototype triple-cluster
module
U-Köln
12/06
P/PU
D-J08-2.2
Report on the characterisation of the
detector module
U-Liverpool
12/08
R/PU
D-J08-3.1
Delivery of prototypes of digital signal
processing electronics
IN2P3
06/06
P/PU
D-J08-3.2
Report on local level processing system
and pulse shape analysis
IN2P3/TUM
12/08
R/PU
D-J08-4.1
Delivery of prototypes of specific data
acquisition hardware
INFN
06/06
P/PU
D-J08-4.2
Report on global level processing system
and gamma-ray tracking
IN2P3/INFN
12/08
R/PU
D-J08-5.1
Report on MC simulations and data
analysis routines
U-Uppsala
12/08
R/PU
Deliverables:
Short title
Lead
contractor
Date
due5
D-J08-1.1
Delivery of the full AGATA prototype
system
CCLRC
D-J08-1.2
Final evaluation report on the full
prototype system commissioning
D-J08-2.1
Wolfram KORTEN, JRA-02 AGATA
Date
deliver
ed
AGATA week, GSI, 21. February 2005
I3 EURONS
AGATA JRA participant
(Nr. & short name)
28. CEA Saclay1
1. GSI Darmstadt
3. GANIL Caen
4. Univ. Jyväskylä
5. INFN Legnaro
5. INFN Milano
5. INFN Padova
11. Univ. Sofia
17. Univ. zu Köln
20. TU München
23. NBI Copenhagen
29. CNRS/IN2P3
33. Istanbul University
35. Univ. Warsaw
36. NIPNE Bucharest
38. KTH Stockholm
39. Uppsala Univ.
40. CCLRC Daresbury1
41. Univ. Liverpool
44. Univ. York
Project Coordination
(CEA-Saclay)
TOTAL
Wolfram KORTEN, JRA-02 AGATA
Finances and first payment
Personnel
Networking
Overheads
24.000
36.000
24.000
0
39.000
47.000
56.000
0
46.000
50.000
20.000
70.000
0
12.500
0
45.000
45.000
27.000
45.000
21.000
0
9.440
15.000
7.667
17.500
5.333
6.583
6.917
10.000
9.000
5.000
7.500
26.667
10.000
25.000
14.167
5.000
5.000
13.000
20.000
9.000
5.000
18.560
10.000
6.333
3.500
8.867
10.717
12.583
2.000
11.000
11.000
5.500
19.333
2.000
7.500
2.833
10.000
10.000
39.000
13.000
6.000
0
Total
EU
52.000
61.000
38.000
21.000
53.200
64.300
75.500
12.000
66.000
66.000
33.000
116.000
12.000
45.000
17.000
60.000
60.000
79.000
78.000
36.000
5.000
607.500
233.334
209.166
1050.000
First 18
months
21.000
26.000
13.000
7.000
22.000
27.000
32.000
4.000
54.000
30.000
24.000
50.000
4.000
24.000
6.000
16.000
16.000
27.000
33.000
19.000
2.000
457.000
AGATA week, GSI, 21. February 2005
I3 EURONS
Activity information sheet
Participant No.
5
11
20
17
23
UKBH
TUM
U-Köln
U-Sofia
INFN
JYU
Wolfram KORTEN, JRA-02 AGATA
4
GANIL
48 months
presently spent
next 18 months
Personnel / k€
48 months
presently spent
next 18 months
Other / k€
48 months
presently spent
next 18 months
Sum / k€
48 months
Presently spent
next 18 months
3
GSI
Personnel/PM
1
CEA/
DSM
Saclay
Participant short name
28
(Coord.)
EU
PI
EU
PI
EU
PI
EU
PI
E
U
PI
EU
PI
EU
PI
EU
PI
EU
PI
6
48
12
48
6
36
0
24
72
252
0
36
9
84
24
96
6
12
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
3
16
6
16
2
12
0
6
30
96
0
12
9
36
12
36
6
3
24
36
24
0
142
0
46
50
20
0
0
0
0
0
0
0
0
0
12
18
8
0
65
0
46
25
20
33
25
14
21
51
12
20
16
13
0
0
0
0
0
0
0
0
0
12
8
5
7
16
4
8
5
4
57
61
38
21
193
12
66
66
33
0
0
0
0
0
0
0
0
0
23
26
13
7
81
4
54
30
24
AGATA week, GSI, 21. February 2005
I3 EURONS
Activity information sheet (cont.)
29
39
40
41
44
U-York
ULiverpool
CCLRC
U-Uppsala
KTH
Wolfram KORTEN, JRA-02 AGATA
38
NIPNE
next 18 months
Sum / k€
48 months
presently spent
next 18 months
36
U-Warsaw
Personnel / k€
48 months
presently spent
next 18 months
Other / k€
48 months
presently spent
35
U-Istanbul
Personnel/PM
48 months
presently spent
next 18 months
33
IN2P3
Participant No.
Participant short name
EU
PI
EU
PI
EU
PI
EU
PI
EU
PI
EU
PI
EU
PI
EU
PI
EU
PI
24
192
0
36
12
72
0
36
24
48
24
48
11
96
12
84
6
24
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
12
72
0
12
9
24
0
12
6
18
6
18
4
30
6
36
4
6
80
0
12.5
0
45
45
27
45
21
0
0
0
0
0
0
0
0
0
35
0
9
0
11
11
10
22
14
36
12
32.5
17
15
15
52
33
15
0
0
0
0
0
0
0
0
0
15
4
14
6
5
5
17
11
5
116
12
45
17
60
60
79
78
36
0
0
0
0
0
0
0
0
0
50
4
24
6
16
16
27
33
19
AGATA week, GSI, 21. February 2005
I3 EURONS
Research Infrastructures in FP7
(as seen by the EC)
Proposed Lines of Action (major role for RI)
 Continue and improve the current line of action on RI
 Reinforce RI action
adding new line for development of new ‘unique’ RI Vision.
Roadmap for RI in Europe in the next 10-20 years.
The Roadmap can have periodic updates and revisions.
 Criteria for priority projects in Roadmap :
 Pan-European interest; potential impact on ERA;
 Size (>50M€); maturity of the project and timeliness;
 Existence of multi-annual and long-term budgetary planning,
 Quality of management.
 AGATA has good chances to become a priority RI project
Wolfram KORTEN, JRA-02 AGATA
AGATA week, GSI, 21. February 2005
I3 EURONS
Research Infrastructures in FP7
(as seen by NuPECC)
 Nuclear Physics community should submit one I3,
instead of I3HP and I3EURONS; but NuPECC is open for suggestions.
 A committee should be formed soon to look into the various issues
and ‘new’ criteria connected with I3 applications in FP7.
 New design studies and new construction projects should be inventorised.
Current priorities for construction: FAIR and SPIRAL-2
Other installations such as a “High-intensity stable beam facility” and
other initiatives will be discussed later (according to M. Harakeh)
 The AGATA collaboration must start defending its interests
Wolfram KORTEN, JRA-02 AGATA
AGATA week, GSI, 21. February 2005