PMBOK - Charter 4 - Project Integration Management

Download Report

Transcript PMBOK - Charter 4 - Project Integration Management

Centro de Estudos e Sistemas Avançados do Recife
PMBOK - Chapter 5
Project Scope
Management
Contents







Introduction to Project Scope Management
Initiation
Scope Planning
Scope Definition
Scope Verification
Scope Change Control
Glossary
Introduction to Project Scope Management


Includes the processes required to ensure that the project
includes all the work required, and only the work required,
to complete the project successfully.
The major project scope management processes are:
–
–
–
–
–
Initiation
Scope planning
Scope definition
Scope verification
Scope change control
Initiation


Definition
Inputs to Initiation
–
–
–
–

Product description
Strategic plan
Project selection criteria
Historical information
Tools and Techniques for Initiation
– Project selection methods
– Expert judgement
Initiation (cont.)

Outputs from Initiation
–
–
–
–
Project charter
Project manager identified/assigned
Constraints
Assumptions (see Section 4.1.1.5)
Scope Planning



Definition
Inputs to Scope Planning
–
–
–
–
Product description
Project charter
Constraints
Assumptions
Tools and Techniques for Scope Planning
–
–
–
–
Product analysis
Benefit/cost analysis
Alternatives identification
Expert judgement
Scope Planning (cont.)

Outputs from Scope Planning
1. Scope statement
2. Supporting detail
3. Scope management plan
Scope Definition


Definition
Inputs do Scope Definition
1. Scope statement
2. Constraints
3. Assumptions
4. Other planning outputs
5. Historical information
Scope Definition (cont.)

Tools and Techniques for Scope Definition
1. Work breakdown structure (WBS) templates
2. Decomposition

Outputs from Scope Definition
1. Work breakdown structure (WBS)
2. Scope statement updates
Scope Verification

Definition

Inputs do Scope Verification

Tools and Techniques for Scope Verification
1. Work results
2. Product documentation
3. Work breakdown structure
4. Scope statement
5. Project plan
1. Inspection
Scope Verification (cont.)

Outputs from Scope Verification
1. Formal acceptance
Scope Change Control


Definition
Inputs do Scope Change Control
1. Work breakdown structure
2. Performance reports
3. Change requests
4. Scope management plan

Tools and Techniques for Scope Change Control
1. Scope change control
2. Performance measurement
3. Additional planning
Scope Change Control (cont.)

Outputs from Scope Change Control
1. Scope changes
2. Corrective action
3. Lessons learned
4. Adjusted baseline
Glossary
Assumptions
Constraints
Lessons learned
Performance measurement
baseline
Performance reporting
Product scope
Project charter
Project scope
Project scope management

Scope
Scope change
Scope definition
Scope planning
Scope statement
Scope verification
Work Breakdown Structure
(WBS)

Centro de Estudos e Sistemas Avançados do Recife
PMBOK - Chapter 5
Project Scope
Management