CIGRE SC C6 Distribution Systems and Dispersed Generation

Download Report

Transcript CIGRE SC C6 Distribution Systems and Dispersed Generation

SC B5 – Protection and Automation
Presidente: G. J. Amantegui (SP)
Segretario: Iony Patriota (BR)
Scopo …
To facilitate and promote the progress of engineering and the international
exchange of information and knowledge concerning principles, design,
applications, coordination, performance and asset management of System
Protection, Substation Control and Automation, Remote Control Systems and
Equipment, Metering Systems and Equipment.
Membership



24 membri regolari
13 membri osservatori
Membro italiano: G. Vianello ([email protected])
SC website: www.cigre-b5.org
Milano 25-11-2008, Riunione CNI
SC B5 – Risultati principali della Conferenza
 Impact of IEC 61850-9-2 process bus on protection and
substation automation systems (39 contributi)
- discussi i problemi: accesso al sistema per le prove, concetto di prova,
interoperabilità ancora un obiettivo
- implementazione ancora a livello di sviluppo, non di realizzazione
 Life Cycle Management of Protection and Control Systems
(48 contributi)
- Tendenze: ruolo sempre più spinto del software e quindi
virtualizzazione e distribuzione di IED; standardizzazione hardware
- Necessità : Strumenti per la gestione di modelli, versioni e
configurazioni; per la personalizzazione da parte degli utenti
(specificazione e prove); per l’accesso remoto (security)
Milano 25-11-2008, Riunione CNI
SC B5 – Advisory Groups attivi
Type
Number
Title
Name of Conv.
Cr.
AG
B5.51
Substation Automation & Remote
Control
J. Ordacgi
(BR)
2007
/8
AG
B5.52
Protection & Monitoring of Main
Plant & Circuits
S. Chano (CA)
2007
/8
AG
B5.53
Monitoring, metering, recording & R. Adams (UK)
Overall System Protection
2007
/8
Milano 25-11-2008, Riunione CNI
Disb.
SC B5 - Working Groups attivi
Type
Number
Title
WG
B5.04
Modern Techniques for
Protecting and Monitoring
Generating Plants
G. Benmouyal
(CA)
2005 2008
WG
B5.05
Modern Techniques for the
Protecting, Monitoring and Control of
Power Transformers
M. S. Sachdev
(CA)
2001 2009
WG
B5.06
Maintenance Strategies for Digital V. Leitloff (F)
Substation Automation Systems
2008 2010
WG
B5.07
Modern Techniques for
Protecting and Monitoring of
Transmission Lines
S. Chano (CA)
2006 2009
WG
B5.08
Refurbishment Strategies based on
(Total) Cost of Ownership,
Operational Risk and Technical
Constrains
P. Leushuis (NL)
2005 2008
Milano 25-11-2008, Riunione CNI
Name of Conv.
Cr.
Disb.
SC B5 - Working Groups attivi
Type
Number
Title
WG
B5.10
Protection, monitoring and
control of series compensated
networks
J. Zakonjsek
(SE)
2002 2008
WG
B5.12
Engineering Guidelines for
IEC61850 Based Substation
Automation Systems
J.Castellanos
(ES)
2007 2009
WG
B5.14
Wide Area Protection and
Control Technologies
V. Terzija (UK)
2008 2010
WG
B5.15
Distance Protection Functions
for Modern Applications
D.Tziouvaras
(US)
2000 2008
WG
B5.16
Modern Techniques for
Protecting Busbars in HV
Networks
Z. Gajić (SE)
2004 2008
WG
B5.19
Protection Relay Coordination
H. Kameda (JP)
2004 2008
Milano 25-11-2008, Riunione CNI
Name of Conv.
Cr.
Disb.
SC B5 - Working Groups attivi
Type
Number
Title
WG
B5.20
New Trends for Automated Fault
and Disturbance Analysis
WG
B5.21
New Local Protection & Control
A. H. Abu Bakar
Approaches To Minimise The Impact (MY)
Of System Disturbances
2005 2010
WG
B5.31
Lifetime management of relay
settings
P.Crossley (UK)
2006 2010
WG
B5.32
Functional Testing of IEC 61850
Based Systems
I. Patriota (ES)
2007 2008
WG
B5.34
The Impact of Renewable Energy
Sources and Distributed
Generation on Substation
Protection and Automation
J. A. González
(ES)
2006 2009
Milano 25-11-2008, Riunione CNI
Name of Conv.
M. Kezunovic
(US)
Cr.
Disb.
2005 2008
SC B5 - Working Groups attivi
Type
Number
Title
WG
B5.36
Application
for
Protection D.Tholomier (FR) 2006 2009
Scheme Based on IEC61850
WG
B5.37
Protection,
Monitoring
Control of Shunt Reactors
WG
B5.38
The Impact of Implementing
Security Requirements using IEC
61850
D. Holstein (US)
2007 2009
WG
B5.94
High Impedance Faults
I. Ojanguren(ES)
2005 2008
Milano 25-11-2008, Riunione CNI
Name of Conv.
and P. Naisani (CA)
Cr.
Disb.
2007 2010
SC B5 - Working Groups attivi
Milano 25-11-2008, Riunione CNI
SC B5 - Nuove attività e futuri W.Groups
Sono stati decisi i seguenti nuovi W.G. :
• “Impact of HVDC on Protection & Control”’
(JWG (SC B5/B4)
Proposta una partecipazione italiana (corrispondente)
• “Protection of hybrid line/cable circuits in transmission
networks”
• ‘‘JWG (B5/D2) Application Guide on digital inter-S/S
comm.s for protection’’ (JWG (SC B5/B4)
Proposta una partecipazione italiana (membro regolare)
• “Protection requirements on transient response of voltage
and current digital acquisition chain’’
Proposta una partecipazione italiana (corrispondente)
• “Standardised protection schemes’’
Occorre individuare i nominativi dei due membri corrispondenti.
Milano 25-11-2008, Riunione CNI
SC B5 - Prossimi meetings
 Jeju Island, Korea, colloquium 2009, 19-23 Oct
 P.S.:



Protection & Control of FACT devices and impact on Protection Systems
Wide Area Monitoring, Control & Protection Technologies
PS1 - Strategies for the Lifetime Maintenance of SAS Systems
 Synopses: entro Feb 2009
 Full papers: entro Giu 2009
 Tutorial Topic:
Experience in the protection of multi-circuit & multiterminal lines and power transformers
Milano 25-11-2008, Riunione CNI
Notizie aggiuntive del regular meeting
 JWC B5/D2 – E’ stata proposta una common session
(Parigi 2010) sul tema ‘’Practical implementation of IEC
61850 in electric power systems”
 Advantages for implementation outside the substation
 Impact on Substation Automation (security, WiFi, teleprotection requirements)
 Architecture and Information Technology aspects between Substation
Automation and Remote Communication
 Communication needs for System Protection Schemes an Wide Area
Measurements
Milano 25-11-2008, Riunione CNI
SC B5 -Soggetti preferenziali per la
Sessione 2010
APPROVATI
• Protection Control & Monitoring Beyond 2015 - allocation
of P&C funcs– architecture of SAS - new concepts -new
requirements –recording
• Impact of renewable energy sources and new generation
on protection and automation of substations
(WG34) – controlled islanding – impact on WAP & SIPS connection protection -IEC 61850 on generator protection –
restoration policies – distribution protection
Milano 25-11-2008, Riunione CNI