NG9-1-1 Program Update
Download
Report
Transcript NG9-1-1 Program Update
NG9-1-1 PROGRAM
UPDATE
J AS O N H O R N I N G
N D AC O
3 / 6 / 2 0 1 3
THREE PRONGED APPROACH
• Carrier Outreach/Planning
• GIS Outreach/Planning
• NG9-1-1 Outreach/Planning
CARRIER OUTREACH/PLANNING
• Ongoing dialog with Local Exchange Carriers
• Ongoing dialog with National Information Solution
Cooperative (NISC)
• Ongoing dialog with Dakota Carrier Network (DCN)
• For collocated equipment
• Bismarck / Fargo
• Aggregation point for 9-1-1 call delivery from LECs
operating in ND.
• Pilot program being discussed to replace TDM with IP transport
• Program would develop a model for ultimately transitioning all
LECs to IP transport for 9-1-1
• Presentations on NG9-1-1 to the carrier community
LECs
Bismarck
Tandem
LECs
Bismarck
DCN
PSAPS
Fargo
Tandem
Fargo
DCN
PSAPS
LECs
LECs
Carrier
IP
Bismarck
Tandem
Bismarck
DCN
PSAPs
Fargo
Tandem
Fargo
DCN
PSAPs
LECs
LECs
Carrier IP Network
Bismarck
Tandem
Bismarck
DCN
PSAPs
Fargo
Tandem
Fargo
DCN
PSAPs
LECs
LECs
Carrier IP Network
Bismarck
Tandem
Bismarck
DCN
Fargo
Tandem
Fargo
DCN
ESInet
PSAPs
PSAPs
LECs
LECs
Carrier IP Network
Bismarck
DCN
Fargo
DCN
ESInet & NG9-1-1 Core Services
PSAPs
PSAPs
GIS OUTREACH/PLANNING
• GIS is CRITICAL to achieving NG9-1-1
• Without good GIS, NG9-1-1 is not possible.
• Please ensure you have identified an effective
maintenance plan and resource for the added
level of effort required!
• 9-1-1 Association’s GIS Committee
• Ongoing discussions with DOT, ITD, Tax Department
• Required Layers for NG9-1-1 have been identified
• Working to establish layer authority and responsibility
• Who is responsible for maintaining each layer?
• Who is responsible for aggregating each layer?
• Who will provision the aggregated GIS data into the NG9-1-1
system?
GIS OUTREACH/PLANNING
• NDACo considering an end-to-end GIS
Maintenance Service if necessary
• Counties/Cities/PSAPs will drive that need
• Please come see me if you have questions!
Layer Name
Required
Geometry
Type
Aggregation
Authority
Minimum
Update
Frequency
Maintenance
Authority
Priority
Road Centerlines
Yes
Line
NDDES
Daily
Local
2
Site/Structure
Addresses
Yes
Point
NDDES
Daily
Local
3
States
Yes
Polygon
DOT
Monthly
State
4
Counties
Yes
Polygon
DOT
Monthly
State
5
Municipalities
Yes
Polygon
T.B.D
Monthly
Local
6
PSAP
Yes
Polygon
NDDES
1 hour
Local
1
Law
Enforcement
Yes
Polygon
NDDES
Daily
Local
7
Fire
Yes
Polygon
NDDES
Daily
Local
8
Ambulance
Yes
Polygon
NDDES
Daily
Local
9
NG9-1-1 OUTREACH
• PSAP Visits
•
•
•
•
Visited 21 of 22 PSAPs thus far
Explain the NG9-1-1 Program
Answered NG9-1-1 questions and potential impacts
Gathered trunk/switch layouts (for transition planning)
• Continued meetings with DCN / ITD / CenturyLink
• Setting expectations
NG9-1-1 PLANNING
• Phase I (2013-2014)
• ESInet deployment, Legacy Connectivity and Data Centers
• Phase II (2015-2016)
• 9-1-1 Database Aggregation and NG9-1-1 Core Service
Build-out
• Phase III (2017 +)
• PSAP / Originating Service Provider Migration and LongTerm Maintenance
OTHER NOTABLE UPDATES
• FCC Legal and Regulatory Framework for NG9-1-1
Report and Recommendations to Congress released on
2/22/2013
• Talks about how states can position themselves well for grants
moving forward
• Good material for understanding NG9-1-1 current state
• Cassidian is suing numerous NG9-1-1 Providers claiming
patent infringement on U.S. Patent 6,744,858
• Seeking clarification….
• FCC also seeking comments
• Rolette planning to “go-live” with 9-1-1 calls at the end
of March
NG9-1-1 “THE GOAL”
• Wireless contract replacement must support the
evolution of the current 9-1-1 environment in ND to
a “Baseline NG9-1-1 System”.
• http://www.nena.org/?NG911_Baseline
• Would appreciate the endorsement of the 9-1-1
Association
• Vote and/or Board Approval on the above statement as
our collective objective and expectation