D EVELOPMENT OF THE I NTERMODAL T RANSPORT IN B ULGARIA Anita Angelova
Head of Department Ministry of Transport, Information Technology and Communications
10th April 2014 Sofia
S
TRATEGIC
F
RAMEWORK
Strategy for the Development of the Transport System of the Republic of Bulgaria until 2020
National Development Programme: Bulgaria 2020 – Priority 8 Improvement of the Transport Connectivity and the Market Access
OP on Transport 2007-2013 and OP on Transport and Transport Infrastructure 2014 – 2020 (draft)
General Transport Master Plan for Bulgaria
Strategy for Integration of the Bulgarian Railway Infrastructure in the European Intermodal Network
Strategy for deployment of the European Rail Traffic Management System (ERTMS) in the Republic of Bulgaria
Integrated Transport Strategy of Bulgaria (in preparation)
TEN-T & C ONNECTING E UROPE F ACILITY
Regulation 1315/2013 for the development of the Trans – European Transport Network
Regulation 1316/2013 establishing the Connecting Europe Facility
Core and Comprehensive TEN-T Networks
Corridor Approach – 9 Core Network Corridors
Connecting Europe Facility financial package:
Annual and multi-annual work programmes Budget (2014-2020) – € 26.25 billion, including €11.305 billion transferred from the Cohesion Fund
TEN-T R AIL AND R OAD M APS
Rail Network Road Network
CORE NETWORK CORRIDORS IN BULGARIA
Two corridors pass through Bulgaria:
The Rhine – Danube Orient/East-Med
Main objectives:
Remove bottlenecks and build missing links Streamline cross-border operations Promote modal integration and interoperability
Corridor management:
European Coordinator Corridor Forum Work Plan – 22 December 2014
Vidin Sofia Kulata Plovdiv Ruse Svilengrad Silistra Burgas Orient/East-Med Road Section Orient/East-Med Railway Section Rhine Danube IWW Section Core Port Rail-Road Terminal
TEN-T I NTERMODAL N ODES
C
URRENT
P
ROJECTS FOR
I
NTERMODAL
T
ERMINALS
Intermodal Terminal Ruse
Project preparation under OPT 2007 – 2013 Tender procedure – 2015 Indicative cost of planned investment – € 26 M Indicative period of implementation – 2 years
Intermodal Terminal Plovdiv
Indicative budget – € 7 M Construction – December 2015 Next step – signing of grant contract
Intermodal Terminal Varna
Location: South industrial zone of the city of Varna Transport modes served: sea, rail and road Approved for implementation under the new investment programme “Sustainable development of the regions” with an initial budget of € 15 M
R
AILWAY
P
ROJECTS
2014 – 2020
Under implementation
Rehabilitation of the Railway Infrastructure along Plovdiv – Burgas Railway Line – Stage I Modernization of Sofia – Plovdiv Railway Line (Septemvri – Plovdiv Section) Electrification and reconstruction of Plovdiv- Svilengrad Railway Line (Dimitrovgrad – Svilengrad Section)
Planned Projects 2014 – 2020
Completion of Plovdiv – Burgas Railway Line - Stage ІІ Modernization of Sofia – Plovdiv Railway Line (Septemvri – Sofia Section) Reconstruction of design parameters of Ruse – Varna Railway Line Modernization of Karnobat - Sindel Railway Line (partially) Modernization of Vidin – Medkovets Railway Line Modernization of Sofia – Dragoman Railway Line
M AP OF THE R AILWAY P ROJECTS 2014 – 2020
5.
3.
Projects under implemantation: I. Plovdiv – Burgas – Stage I II. Septemvri – Plovdiv III. Plovdiv- Svilengrad – Turkish/Greek Borders
6.
4.
2.
II 1.
III I
Planned Projects until 2020 1.Plovdiv – Bourgas – stage ІІ 2.Septemvri – Sofia (partially) 3.Ruse - Varna 4.Karnobat – Sindel (partially) 5.Vidin – Medkovets 6.Sofia – Dragoman
D
EVELOPMENT OF THE
P
ORT
I
NFRASTRUCTURE
Vidin Lom Oryahovo Nikopol Somovit Svishtov Ruse Sofia Balchik Lesport Varna Nesebar Burgas Rosenetz Port Terminals under Concession
Vidin North Vidin South Lom Oryahovo Somovit Nikopol Svishtov Ruse West Balchik Lesport Burgas East 2 Burgas West Rosenetz Nesebar (in appeal procedure)
Planned Concessions
Vidin Center Ruse East Ruse Zimovnik
S
USTAINABLE
F
REIGHT
S
ERVICES
The Marco Polo Programme was discontinued beyond 2013
Application of a new approach in the period 2014 – 2020
Introduction of a new funding scheme for freight transport services under the revised TEN-T and the new instrument CEF
Ongoing Ex-ante study
Additional input from stakeholders was collected through online questionnaire
Intelligent Transport Systems Application
Implementation of River Information System in the Bulgarian stretch of the River Danube (BULRIS)
Vessel Traffic Management Information System (VTMIS Phase 3)
Implementation of ERTMS as part of the railway infrastructure projects
THANK YOU FOR YOUR ATTENTION!
www.mtitc.government.bg