Mrs. Anita Angelova - MTITC

Download Report

Transcript Mrs. Anita Angelova - MTITC

D EVELOPMENT OF THE I NTERMODAL T RANSPORT IN B ULGARIA Anita Angelova

Head of Department Ministry of Transport, Information Technology and Communications

10th April 2014 Sofia

S

TRATEGIC

F

RAMEWORK

Strategy for the Development of the Transport System of the Republic of Bulgaria until 2020

National Development Programme: Bulgaria 2020 – Priority 8 Improvement of the Transport Connectivity and the Market Access

OP on Transport 2007-2013 and OP on Transport and Transport Infrastructure 2014 – 2020 (draft)

General Transport Master Plan for Bulgaria

Strategy for Integration of the Bulgarian Railway Infrastructure in the European Intermodal Network

Strategy for deployment of the European Rail Traffic Management System (ERTMS) in the Republic of Bulgaria

Integrated Transport Strategy of Bulgaria (in preparation)

TEN-T & C ONNECTING E UROPE F ACILITY

Regulation 1315/2013 for the development of the Trans – European Transport Network

Regulation 1316/2013 establishing the Connecting Europe Facility

Core and Comprehensive TEN-T Networks

Corridor Approach – 9 Core Network Corridors

Connecting Europe Facility financial package:

 Annual and multi-annual work programmes  Budget (2014-2020) – € 26.25 billion, including €11.305 billion transferred from the Cohesion Fund

TEN-T R AIL AND R OAD M APS

Rail Network Road Network

CORE NETWORK CORRIDORS IN BULGARIA

Two corridors pass through Bulgaria:

 The Rhine – Danube  Orient/East-Med 

Main objectives:

 Remove bottlenecks and build missing links  Streamline cross-border operations  Promote modal integration and interoperability 

Corridor management:

 European Coordinator  Corridor Forum  Work Plan – 22 December 2014

Vidin Sofia Kulata Plovdiv Ruse Svilengrad Silistra Burgas Orient/East-Med Road Section Orient/East-Med Railway Section Rhine Danube IWW Section Core Port Rail-Road Terminal

TEN-T I NTERMODAL N ODES

C

URRENT

P

ROJECTS FOR

I

NTERMODAL

T

ERMINALS

Intermodal Terminal Ruse

 Project preparation under OPT 2007 – 2013  Tender procedure – 2015  Indicative cost of planned investment – € 26 M  Indicative period of implementation – 2 years 

Intermodal Terminal Plovdiv

 Indicative budget – € 7 M  Construction – December 2015  Next step – signing of grant contract 

Intermodal Terminal Varna

   Location: South industrial zone of the city of Varna Transport modes served: sea, rail and road Approved for implementation under the new investment programme “Sustainable development of the regions” with an initial budget of € 15 M

R

AILWAY

P

ROJECTS

2014 – 2020

Under implementation

 Rehabilitation of the Railway Infrastructure along Plovdiv – Burgas Railway Line – Stage I   Modernization of Sofia – Plovdiv Railway Line (Septemvri – Plovdiv Section) Electrification and reconstruction of Plovdiv- Svilengrad Railway Line (Dimitrovgrad – Svilengrad Section) 

Planned Projects 2014 – 2020

      Completion of Plovdiv – Burgas Railway Line - Stage ІІ Modernization of Sofia – Plovdiv Railway Line (Septemvri – Sofia Section) Reconstruction of design parameters of Ruse – Varna Railway Line Modernization of Karnobat - Sindel Railway Line (partially) Modernization of Vidin – Medkovets Railway Line Modernization of Sofia – Dragoman Railway Line

M AP OF THE R AILWAY P ROJECTS 2014 – 2020

5.

3.

Projects under implemantation: I. Plovdiv – Burgas – Stage I II. Septemvri – Plovdiv III. Plovdiv- Svilengrad – Turkish/Greek Borders

6.

4.

2.

II 1.

III I

Planned Projects until 2020 1.Plovdiv – Bourgas – stage ІІ 2.Septemvri – Sofia (partially) 3.Ruse - Varna 4.Karnobat – Sindel (partially) 5.Vidin – Medkovets 6.Sofia – Dragoman

D

EVELOPMENT OF THE

P

ORT

I

NFRASTRUCTURE

Vidin Lom Oryahovo Nikopol Somovit Svishtov Ruse Sofia Balchik Lesport Varna Nesebar Burgas Rosenetz Port Terminals under Concession

 Vidin North  Vidin South  Lom  Oryahovo  Somovit   Nikopol Svishtov  Ruse West  Balchik  Lesport   Burgas East 2 Burgas West  Rosenetz  Nesebar (in appeal procedure)

Planned Concessions

 Vidin Center  Ruse East  Ruse Zimovnik

S

USTAINABLE

F

REIGHT

S

ERVICES

The Marco Polo Programme was discontinued beyond 2013

Application of a new approach in the period 2014 – 2020

Introduction of a new funding scheme for freight transport services under the revised TEN-T and the new instrument CEF

Ongoing Ex-ante study

Additional input from stakeholders was collected through online questionnaire

Intelligent Transport Systems Application

Implementation of River Information System in the Bulgarian stretch of the River Danube (BULRIS)

Vessel Traffic Management Information System (VTMIS Phase 3)

Implementation of ERTMS as part of the railway infrastructure projects

THANK YOU FOR YOUR ATTENTION!

www.mtitc.government.bg

25th February 2014 Sofia