Earth Control Measures at Project Detail Site Location Marina Barrage Site Location Marina Bay Sands IR Earth Control Measures Layout One discharge Point Water Treatment System Water Storage Pond Silt Trap Perimeter Cut-Off Drain with Silt Fence on both sides Earth Control Measures Implementation Earth Control Measures Implementation Earth Control Measures Earth Control measures at construction site is of greater urgency and importance now as Singapore has to harness every drop of water so that Singaporeans can enjoy clean, clear water and a healthy environment. Erosion Control much easier and more cost effective to prevent erosion than to trap sediments earth work shall be sequenced and scheduled in stages and progressively to minimize bare earth surfaces. All construction access and bare surfaces shall be paved up with concrete or milled waste or other suitable materials. To turf up bare surfaces immediately in an earthwork if there is no subsequent construction activities. All bare slopes shall be protected with cemetitious spray, close-turfing or erosion control blankets. All earth stokepiles shall be protected by canvas sheet or erosion control blanket. Sediment Control To provide concrete lined cut off drains along the perimeter of the construction sites. To provide sit fence properly installed and embedded onto the ground along the perimeter cut-off drains Intermediate silt traps shall be installed for every 30 metres along the perimeter lined cut-off drain. To provide sedimentation basins along the perimeter cut off drains and before discharge points into public drains. Estimation of Surface Runoff Estimation of Discharge Capacity Rainfall Intensity No of Wet days a year Estimation of Sediment yield Parameters adopted Estimation of Soil Erodibility Wheel Wash at Main entrance Water treatment system provided at wheel wash Perimeter cut off drain Concrete lining Silt fence Silt Traps After exvavation, all rainwater will be retain at basement Concrete lining at slope Diaphragm wall completed Existing turfing to be retained Main Water holding area before treatment Water Treatment System Slurry discharged to slurry collection area Discharge of Slurry after water treatment Discharge of water to existing canal after treatment Discharge of water to existing canal after treatment The discharge into the storm water drainage system shall not contain Total Suspended Solids in concentrations greater than 50 milligrams per litre of the discharge. Continuous monitoring will be implemented on site Regular Maintenance - cost of chemical = $0.20 to $0.60 per m3 (mixed chemical by supplier) - assume running on full capacity for 24 hrs - for four (4) unit of ASIII-10 = $144.00 per day x 4 nos = $576.00 - for two (2) unit of ASIII-40 = $288.00 per day x 2 nos = $576.00 - total chemical cost per day = $1,152.00 - chemical used: - (1) Polymer = $10/kg - (2) Ferrichloride = $0.20/litre - mixing of chemical by Contractor, cost = $0.10 - $0.30 per m3 - (estimated cost of chemical = HK$1,200/mth for 20/m3 18 hour) - ASIII-10 = 20m3/hr - total capacity = 20m3 x 24hr = 480m3 - chemical usage = 480m3 x $0.30/m3 = $144.00 per day - ASIII-40 = 40m3/H - total capacity = 40m3 x 24hr = 960m3 - chemical usage = 960m3 x $0.30/m3 = $288.00 per day Existing drain within construction site maintained regularly Maintenance Programme Regular checks on the ECM that have been put in place The checks including the inspection of slope, drain, erosion blanket, silt fence, curb inlet sediment barrier, sediment tank. Damage, choke or any problem which cause ineffectiveness should be recorded and reported. The washing bays with sump pump at all entrances/exits must be also properly maintained. Servicing & repair required for the ECM should be looked into and immediate necessary repair/service or improvement should be carried out with urgency. Increase in composition fines Regulation 4 TSS >50mg/l • $1,000 and • $2,500 in the case of a second offence CHECKLIST FOR MAINTENANCE OF EARTH CONTROL MEASURES Checklist for Perimeter cut off drain Date of inspection: Check by: Name of QECP Items Description 1 Location according to ECM? If no, inform contractor 2 Construction according to ECM? If no, inform contractor. 3 Any signs of damage? If yes, repair 4 Any signs of inadequate capacity (ie flooding)? If yes, inform QECP 5 Is obstructing debris or sediment blocking drain? If yes, clear Follow up action and date of implementation: Name of ECO Yes No Remarks Checklist for silt fence Date of inspection: Check by: Name of QECP Items 1 Description Installation of silt fence according to ECM? If No, inform contractor 2 Site fence accumulated >25cm sediment? If yes, clear 3 Is the runoff water running around, above or below the fabric? If yes, fabric is choked and replacement with new fabric required. 4 Is silt fence support steady? If no, rectify 5 Is silt fence torn? If yes, replace 6 Is silt fence properly anchored? If no, rectify. Follow up action and date of implementation: Name of ECO Yes No Remarks Checklist for silt trap Date of inspection: Check by: Name of QECP Items 1 Description Installation of silt trap according to ECM? If No, inform contractor 2 Is silt trap structure damaged? If yes, repair. 4 Is silt trap fabric torn? If yes, rectify 5 Is silt fence torn? If yes, replace 6 Is silt trap accumulated with sediment >50% height? If yes, clear. Follow up action and date of implementation: Name of ECO Yes No Remarks Checklist for Stabilization through laying milled waste, lean concreting, installing erosion control blanket or vegetation Date of inspection: Check by: Name of QECP Items Description 1 Location according to ECM? If No, inform contractor 2 Construction according to ECM? If No, inform contractor 3 Any signs of damage for lean concrete areas? If yes, repair. 4 Any signs of damage for milled waste areas? If yes, repair. 5 Any signs of damage for erosion control mat areas? If yes, replace. 6 Any signs of damage for vegetation areas? If yes, replant or replace with suitable material. Follow up action and date of implementation: Name of ECO Yes No Remarks Checklist for Stockpile of topsoil/materials Date of inspection: Check by: Name of QECP Items 1 Description Stockpile location and creation according to ECM? If no, inform contractor 2 Properly protected against erosion? If no, refer to ECM or check with QECP. 3 Properly protected against sedimentation? If no, refer to ECM or check with QECP. Follow up action and date of implementation: Name of ECO Yes No Remarks Checklist for Sedimentation basins Date of inspection: Check by: Name of QECP Items Description 1 Location and schedule according to ECM? If no, inform contractor 2 Details of basins according to ECM?, If no, inform contractor 3 Concentration of effluent (outlet runoff) >50ppm? If yes, inform QECP 4 Sediment filled to within 30cm of water discharge level of outflow structure? If yes, remove sediment. 5 Outlet structure installed as specified in ECM? If no inform contractor. 6 Embankment (if any) protected against erosion? If no, propose measures to protect against erosion. 7 Sedimentation basin inlet chocked? If yes, clear. 8 Sedimentation basin outlet chocked? If yes, clear. 9 Sedimentation basin inlet/outlet scouring problem? If yes, inform contractor. Follow up action and date of implementation: Name of ECO Yes No Remarks Checklist for wheel wash areas, entrance/ exit points Date of inspection: Check by: Name of QECP Items 1 Description Location according to ECM? If no, inform contractor. 2 Construction according to details? If no, inform contractor 3 Any signs of damage for concrete (or stabilized) areas? If yes, repair 4 Any signs of sediment spill from these areas into public domain? If yes, investigate. 5 Runoff from wheel wash area channel to suitable areas and properly treated? Follow up action and date of implementation: Name of ECO Yes No Remarks THANK YOU . . . .