Transcript Slide 1
January 29, 2008 Gwinnett Place Community Improvement District Gwinnett Village Community Improvement District Atlanta Regional Commission – LCI Funding Consultant Team: Street Smarts, Inc. Jordan, Jones & Goulding, Inc. Urban Collage JB+A Lessons Learned from Practice Barriers to Redevelopment • Economic Barriers – High cost of land, site preparation for redeveloped sites – Market shifts and uncertain future • Environmental Barriers – Difficult site conditions – Tree protection on redeveloped sites – Stormwater management on redeveloped sites • Zoning regulations – Height, setbacks, parking, procedures • Procedures – Public hearings / delay for entitlements Economic Barriers to Redevelopment Project Costs Greenfield Redevelopment Land Costs $ 1,050,000 $ 3,050,000 Site improvements 637,500 1,081,250 Base building / tenant improvements 6,375,000 6,375,000 Landscape, signage, etc. 337,500 337,500 Architect, Engr., Testing 525,000 543,750 Legal/ Ins./ Title/ Fees 225,000 260,000 Marketing/Promotion/ Other 78,750 97,500 Financing Costs 446,267 640,977 Contingency 525,000 675,000 TOTAL PROJECT COSTS $10,200,017 $13,060,977 COST PER SQ. FT. $136 Source: Gwinnett Council for Quality Growth $174 Add $ 2,000,000 443,750 0 0 18,750 35,000 18,750 194,710 150,000 $ 2,860,960 28% Regional Convention Center Overlay – Reno, NV Convention Center Mall Northgate Mall Overlay District – Seattle, WA Mall Lessons Learned from Practice Principles for setting boundaries • • • • • Size Matters Smaller areas focus resources Smaller area involves less risk/exposure Catalyst sites can jump-start the area Limit the “edge effects” Lessons Learned from Practice Conclusions and Recommendations It is better to start small and grow over time than to have to retreat. A multi-tier Overlay District can provide the best of both worlds. Gwinnett Place CID Rezoning Boundaries Gwinnett Village CID Rezoning Boundaries Gwinnett Place Redevelopment Study Agenda for Public/Private Partnerships • Attractive, unified design theme • Connectivity improvements • Public places and green spaces • Parking management structures and strategies • Areawide stormwater facilities • Transit-oriented development Goal: Key: Break the economic cycle of disinvestment Flexible regulations with incentives Purposes of the Redevelopment District Revitalization of underused property Efficient land use for livework-play Replace auto trips with walking Encourage connected system for all modes: auto, transit, bike, walking. • Branding – Visual Theme (Streetscape) • Incentives / Flexibility for Redevelopment • Mixed Use Development Design Guidelines • Public/Private Investment in Infrastructure and Amenities Uses Allowed in the Overlay District Permitted Uses Special Uses • C-1,C-2,C-3, O-I • Automotive parts, Building materials/ garden center, outdoor recreation, extended stay hotels, miniwarehouses, etc. • Mixed-Use: Hotel, Office Commercial, Retail, & Residential, (Including Lofts and Residential/Business) • All Residential Uses RTH, RSR, RZT Multi-family (density up to 96 du/acre) Prohibited Uses • Adult entertainment; car wash; contractor offices; mobile homes; heavy equipment sales/service; pawn shops; motels, etc. Development Requirements in the Overlay • Install CID Streetscape along frontage • 15% Common Area (50% transferable) • Utilities relocation • Max. 40% of Parking in Front Yard • Interparcel access • Maximum block length: 600 ft. Sources of Flexibility • • • • • Mixed Use Development Relaxed Setbacks Shared parking Fees in Lieu of Parking Off-site transfer of tree density & open space • Joint stormwater management facilities Incentive Features Density Bonuses – Mixed Use/ Housing – Street connections – Public areas – Structured parking – Areawide Stormwater – Transit connections Bonus Density Incentives What is Floor Area Ratio (FAR)? If FAR = 1.0 Density = 43,560 sq. ft. of building per acre of land 1-story bldg. covers 100% of lot or 2-story bldg. covers 50% of lot Bonus Density Incentives Mixed –Use Development • Bonus density incentive of 1.0 FAR for mixed-use development • Additional .5 FAR bonus for structured parking. Bonus Density Incentives Mixed-Use Development Additional 0.5 FAR for: • Projects over 25 acres • Projects over 10 acres that combine 3 or more lots into one plan • Projects that are over 40% Office • Projects that are over 30% Residential Common Area 20 % is mandatory Common Area 50% can be transferred to an approved receiving area Bonus Density Incentives Common Area Density Bonus of .2 FAR for each additional 1% of site area. Bonus Density Incentives For New Connecting Street New Public Street Provided Bonus Density Incentives New Connecting Street Connectivity Bonus- 10:1 Density Transfer Construction of Parking Deck • Does not count toward maximum FAR. • Density bonus of .5 FAR for providing >70% of required parking in a deck. • Joint parking structures can be constructed by private property owner or an entity created by Gwinnett County. • Fees in lieu of parking authorized. Regional Stormwater Management •Allow stormwater management requirements to be met off-site. •Provide 10:1 density transfer for land set aside and constructed as a Regional Stormwater Management facility. Bonus Density Incentives Transit-Oriented Development Developers who provide transit passenger waiting area and shelter earn .25 FAR bonus Bonus Density Incentives Energy- Efficient Construction Buildings that are certified as “Silver” level or higher by LEED earn .25 FAR bonus Overlay Tiers Maximum Intensities (with Bonus): Tier I Transition Height: 60 ft., or 3 stories Residential Density: 13 units/acre FAR: 0.40 Tier II Neighborhood Center Height: 80 ft., or 5 stories Residential Density: 32 units/acre FAR: 1.00 Tier III Town Center Height: 150 ft., or 10 stories Residential Density: 48 units/acre FAR: 2.00 Tier IV Regional Center Height: 300 ft., or 25 stories Residential Density: 96 units/acre FAR: 5.00 Bonus Density Incentives Example Site Area (Acres) 10 Tier IV Max. Residential Max. Max GFA FAR DU/Acre Stories Ht. (ft.) Base Allowable 174,240 sf 0.4 13 3 60 10 Acres/ 3 parcels 392,040 sf 0.90 32 5 75 Mixed-Use Develop. 827,640 sf 1.90 48 10 140 Structured Parking 1,045,440 sf 2.40 64 15 210 40% Office 1,263,240 sf 2.90 64 15 210 30% Residential 1,481,040 sf 3.40 80 20 260 25% Common Area 1,916,640 sf 4.40 96 25 300 0.6 acre ROW/street 2,178,000 sf 5.00 96 25 300 Tiers Gwinnett Village Street Designation Map Street Designation Map for GVCID Street Designation Map for GPCID Typical Street Cross-Sections Typical Street Cross-Sections New Areawide Zoning Meets Needs of Changing Community Conditions Mixed-Use Redevelopment District Zoning Grandfathered Uses Project Overview 8 Month Timeline August Sept Review Existing Conditions & Gather Input via Steering Committee - Development of Concept Report - Outline of Overlay Ordinance - Identification of Key Design Concepts Sept & Oct Steering Committee & Gwinnett Co. Staff Review of Concepts Oct. Nov/ Dec Draft Ordinance Steering Committee & CID Board Review 11/26-12/5 Revise Ordinance/ Coordinate with Gwinnett Village Jan Public Open House Jan & Feb Steering Committee & CID Board Review Feb Spring Transmittal to Gwinnett County & Planning Commission Public Hearing Gwinnett BOC & City of Norcross Public Hearings – Adoption What Triggers the New District? New Construction and Major Redevelopment or Expansion: “All applications for land disturbance permits, plan review, plat approval, and building permits for all property and rights of way within the boundaries of the CID Redevelopment Area District.” except… What are the Exemptions? 1. Development activity for which the Director has received a valid and complete development permits, building permit or land disturbance permit application prior to the enactment of this Section shall be exempt from this Section to the extent of property covered by the previously issued permit. 2. Rehabilitation, restoration, renovation, expansion, and repair of a legally permitted structure existing prior to the enactment of this section shall be exempt from all provisions of this Section 1319, except for Section 1319.6 until such time as the cumulative effect of all such permits on a single parcel results in an increase in the total floor area of the existing structure by 50 percent or 10,000 sq.ft., whichever is less. 3. Rehabilitation, restoration, renovation, expansion, or repair of structures that are part of a development of connected, non-residential buildings having a combined gross floor area of over 1 million square feet as of the enactment of this Section shall be exempt from all provisions of this Section 1319, except for Section 1319.6. What are the Exemptions? 4. Any structure that is legally permitted prior to the enactment of this Section that is subsequently destroyed or damaged by fire, flood, wind, or other natural disaster may be reconstructed to its previous use and extent without complying with any requirements of this Section 1319. 5. Construction of an accessory building or structure in conformity with Section 600 that is less than 2,500 sq. ft. gross floor area and is accessory to a use or structure that was legally permitted prior to the enactment of this Section shall be exempt from all provisions of this Section 1319, except for Section 1319.6. 6. No property made exempt from the requirements of this Section shall be entitled to any of the increases in density or gross floor area afforded by this Section. Questions?