Transcript Construction Industry of Thailand 2005
4/23/2020
Construction Industry of Thailand
By Tapanawat R.
SCI Plant Services Siam Cement Group SCI Plant Services/Siam Cement Group 1
Petrol Chemical Paper and Packaging
4/23/2020
Distribution and Retailing Cement
SCI Plant Services/Siam Cement Group
Building Product
2
Index
• • • • • •
Thailand Economy Overview Construction Industry of Thailand Construction Employment and Statistic Safety in Construction Work Law and Regulation Conclusion
4/23/2020 SCI Plant Services/Siam Cement Group 3
Thailand Economic Overview
4/23/2020 SCI Plant Services/Siam Cement Group 4
Thailand Economy Overview
Currency Fiscal year Trade organisations GDP ranking GDP GDP growth GDP per capita GDP by sector Inflation Pop below poverty line Labour force Labour force by occupation Unemployment Main industries Economy of Thailand
Thai baht (THB) 1 October 30 September WTO and APEC
Statistics
20th [1] $524.8 billion ( 2004 est .) 6.1% ( 2004 est .) $8,100 ( 2004 est .) agriculture ( 9% ) , industry ( 44.3% ) , services ( 46.7% ) ( 2004 est .) 2.8% ( 2004 est .) 10% ( 2004 est .) 36.43 million ( Nov . 2004 est .) agriculture ( 49% ) , industry ( 14% ) , services ( 37% ) ( 2000 est .) 1.5% ( Nov . 2004 est .) tourism , textiles and garments, agricultural processing, beverages , tobacco , cement , light manufacturing , appliances , computers and parts, furniture, plastics
Trading Partners
4/23/2020 SCI Plant Services/Siam Cement Group 5
GDP of Thailand
TomyamKung Crisis
GDP -10% Construction -38% GDP 6% in 2004
4/23/2020 SCI Plant Services/Siam Cement Group 6
Construction Industry
4/23/2020 SCI Plant Services/Siam Cement Group 7
Construction Industry in 2005
Thailand's Economy Main Exports
Tin Textiles Fish Products Rice Tapioca Jewellery Electrical Appliances Furniture Plastics Integrated Circuits 4/23/2020
GDP Construction 7% Agriculture 13% Service 48%
SCI Plant Services/Siam Cement Group
Other Industries 32%
8
Growth Rate of Thai Economy and Construction Industry 40
(%)
30 20 10 0 -10 -20 -30 -40
1985 1987 1989 1991 1993 1995 1997 GDP of Thailand GDP of Construction 1999 2001 2003 2005 4/23/2020 SCI Plant Services/Siam Cement Group 9
Construction Value Investment
(Million Bath)
300,000 250,000 200,000 150,000 100,000 50,000 0
1985 1987 1989 1991 1993 1995 1997 1999 2001 2003
+14.1
% +15.
+12.5
%
2005 4/23/2020 Total Investment Private Investment SCI Plant Services/Siam Cement Group Public Investment 10
100,000 80,000 60,000 40,000 20,000 0
Construction Investment by Segment Building and Factory Investment Trend significantly increased Housing is saturated 2005
2004 2005
2005
Facility Work Building Work Factory Chain Store Housing 4/23/2020
2005
SCI Plant Services/Siam Cement Group 11
Construction Employment and Statistic
4/23/2020 SCI Plant Services/Siam Cement Group 12
Construction Industry
Employment 4/23/2020 SCI Plant Services/Siam Cement Group 13
Accident Rate in Each Business
Metal Business Construction Business 9%
4/23/2020 SCI Plant Services/Siam Cement Group 14
Death and Permanent Disability
Construction work
• accounts for
(almost 1 in 6) of deaths at work
4/23/2020
14%
•
24% of permanent total disability.
SCI Plant Services/Siam Cement Group 15
Death and Permanent Disability (Cont.)
•
Construction workers are to face occupational death 2 .7 times as likely per million.
as otheroccupations – 57 per million versus 21
•
Construction workers are suffer permanent total million.
5 times disability as likely to as other workers – 2.1 per million versus 0.4 per
4/23/2020 SCI Plant Services/Siam Cement Group 16
4/23/2020
Rate of Accident and Death
Accident Rate/1,000 is Constant Death Rate/100,000 is increase 10-15% SCI Plant Services/Siam Cement Group 17
Safety in Construction Work
4/23/2020 SCI Plant Services/Siam Cement Group 18
SHE PLAN
• • • • • • • • • • • • Organization and Responsibility Discipline and Planning (work permit) Risk Assessment and Pre-Job Safety Analysis Standardization (Prevention and Control) Site Inspection and Audit Reporting and Accident Investigation Safety Training Safety Promotion First aid Emergency Plan 5S (Cleaning and House Keeping) Waste Management 4/23/2020 SCI Plant Services/Siam Cement Group 19
Pre-Construction Period
• • • • • •
Boundary or Fence/Area Separation Safety Sign Facility (Water, Waste…) Construction Equipment ( Interlock) People : Training Method Statement
4/23/2020 SCI Plant Services/Siam Cement Group 20
Construction Period
• • • • • • • •
Risk Assessment and Pre-Job Safety Analysis Safety Control Safety Inspection Safety Audit Safety Talk Training Reporting Emergency Plan
4/23/2020 SCI Plant Services/Siam Cement Group 21
Causes of Accident in Construction Work
• • External Environment Human • • From Statistic In the beginning of construction period, there were accident 3 times/day.
In case of high rise building, there was one death. 4/23/2020 SCI Plant Services/Siam Cement Group 22
Types of accident in Construction Site
• • • • • • • High Falling Electric Vibration and Noise Fire Machinery Land Sliding Scaffolding and Structure Falling 4/23/2020 SCI Plant Services/Siam Cement Group 23
Accident Rate in Each Causes
All Industry • • • • • • • Hand Accident 25% Materials impact 18% Eyes Accident 16% Material Falling 13% High Falling 4% Slippery Falling 3% Electric 2% 4/23/2020 SCI Plant Services/Siam Cement Group 24
4/23/2020
Law and Regulation
Design Period Construction Period
SCI Plant Services/Siam Cement Group 25
Design Period
• Code of Design of Building and Factory – Set Back Distance : Fire Protection, Airflow, Light..
– Live Load : Depend on function of building. Ex Housing 150kg/m2, Super Store 500 kg/m2, Walk way 300kg/m2, Library 600-800 kg/m2 – Fire Protection System, : Fire Coating for steel structure (3 hrs), Fire Exit ( 2 Positions for 4 Stories upward) (Fire Wall 2 hrs), Air Pressure System, Fire Alarm 4/23/2020 SCI Plant Services/Siam Cement Group 26
• • •
Air Flow
: Factory use 4 times of Volume/hr.
Office use 7 time of Volume/hr
Lighting
: Factory use 500 Flux, Office use 300 Flux
Air Condition
: 1 tons/ 20m2 ( Height=2.7 m.) 4/23/2020 SCI Plant Services/Siam Cement Group 27
Construction Period
• Construction Area : Restriction area, Sign, Prohibit unconcern people 4/23/2020 SCI Plant Services/Siam Cement Group 28
• Safety of Mobile Crane & Crane : Capability of crane, Crane Inspection Erection Procedure 4/23/2020 SCI Plant Services/Siam Cement Group 29
• Safety of Piling Work Limit Area, Follow Instruction, Inspect Equipment and Sling 4/23/2020 SCI Plant Services/Siam Cement Group 30
• Safety of Lift 9 meters height onward designed by civil engineer 4/23/2020 SCI Plant Services/Siam Cement Group 31
• Safety of Scaffolding Work 2 meters height onward need scaffolding, in case of super structure, it is needed to design by civil engineer 4/23/2020 SCI Plant Services/Siam Cement Group 32
• Safety High, Material and Structure Falling Fence, Safety line, net , belt 4/23/2020 SCI Plant Services/Siam Cement Group 33
• Safety, Health, and Environment Management Control about airflow in construction area, Training, If we have to work in low airflow area we have to work with other people at least 3 people, Entrance must be convenience and safety.
4/23/2020
Dia 25 m. , H= 70 m.
SCI Plant Services/Siam Cement Group 34
Conclusion
4/23/2020 SCI Plant Services/Siam Cement Group 35
Conclusion
• •
Construction Industry of Thailand in 2006 still slightly increase. It’s not housing but building, factory of private sector. Moreover public sector invest more in infrastructure especially in Bangkok and East area such as mass transit, hospital, university. It may contribute around 7-9% of GDP
4/23/2020 SCI Plant Services/Siam Cement Group 36
Conclusion
•
2003-2005 Rate of accident was constant while rate of death per 100,000 people increased because of accident from housing segment, In next 3 years building ,factory and infrastructure work will increase.
•
Construction employment is round 6% of total workforce. Construction work have 14% of total death(1 of 6) and 24% of total permanent disability
4/23/2020 SCI Plant Services/Siam Cement Group 37
Conclusion
•
Construction worker have more risk 2.7 times to face occupational death and 5 times to face permanent disability
•
Even though Thailand have the law about safety but in reality we still lack of safety supervisor. Safety management and control have only in the large company
4/23/2020 SCI Plant Services/Siam Cement Group 38
Conclusion
• • • Safety in Engineering Work Should start on Engineering Design Philosophy.
Designer should concern about all of period of Engineering Work – Construction or Erection period (Implement) – Operating Period – Maintenance Period Designer should concern about Law, Environment, New Construction Technology, New Material Technology 4/23/2020 SCI Plant Services/Siam Cement Group 39
Example
• • • It design to against earth quake It use simulation to evaluate effect of all force, wind tunnel testing Design concern about every stage :construction and operating and maintenance 4/23/2020
The Akashi Bridge The Oakland Bay Bridge
SCI Plant Services/Siam Cement Group the longest spanning
suspension bridge
in the world
Petronas Tower
40
Thank You For Your Attention