Transcript 無投影片標題
Ganda Project Plan Data Systems Consulting MFG Division Charley.C/Jeff.Y/ Executive Summary 1. 2. 3. 4. 5. 6. 7. 8. Project scope Detail workplan Project Team TIPTOP ERP connection interface with some hardware devices Clarification about VPS EasyFlow, What Digiwin proposal (need to confirm and discussion for more details) BI, What Digiwin proposal (need to confirm and discussion for more details) Finalized the reminding items in the file of "things to be confirm with Digiwin.docx" Discussion Summary Topic Status • Project Scope 73% initial ganda’s requirement met to Tiptop and 18% need customization • Work plan Agreed project divided on 2 phase • Project team~ Digiwin will provide dedicated Project Team (Consultant) • ERP comm. Interface Digiwin proposed some option to Ganda • • • • • VPS~ B2B/BI/Easyflow Draft contract Payment term After sales service -Phase 1 (6 month) for core business modules -Phase 2 (Phase 1 + 6 mth) for supporting modules. OK with certain condition OK, Digiwin accepted Sent to Richard, Alex & Toto for review Discuss later on 26 April 2013 Need to be finalized with CFC TIPTOP solution match % for Ganda Total 214 of initial Ganda’s requirements TIPTOP Standard Match 158 73% Not clear Need customization 38 1 Not in scope 6 No function 18% 10 9% Key Principles for Project Strict Scope Control is required in order to ensure that: 1. Initial Ganda’s requirements and TIPTOP modules Standard is adhered to 2. Schedule is met Therefore: •Allow Changes for statutory or critical business requirements, only • Any enhancements on the system can only be built AFTER go-live Management & End users must be aware of this approach and must have the realistic expectations about what the system will provide Digiwin Standard Modules suggests in Ganda Group Sales A/P BOM B2B Purchasing A/R Production Easyflow GP Inventory MRP BI Cost Accounting HRM Distribution G/L Consolidation Financial report Inter-Company Trading Equip. Mgt. Cross-Data transfer Project Mgt. Fixed Asset Quality. Mgt. Leasing Mgt. Tax Declaration BOM Cash/Loan/Investment Budget Mgt. System and Parameters System Mgt. Customization Modules in Ganda Project Item Estimate Man hours Phase Manufacturing of Production Daily reports KP+ CFC 500 Phase 1 Vehicle Management ( For Transportation Cost Management) Base on Ganda 300 Phase 1 HRM report ID 200/ VN 200 Phase 1 Automatic PLC Integration Base on CFC400 Phase 1 Tax reporting to Local Government Free of charge Phase 1 Packing Management (Truck & Belt Scale System) Base on CFC 200 Phase 1 CMMS System(Customization in Equipment Module) Electric Power System Base on CFC50 Phase 1 Base on CFC100 Phase 2 Telephone Management Base on CFC150 Phase 2 Library Management Base on CFC150 Phase 2 Canteen Meal Management Base on CFC150 Phase 2 GPS Integration 300 Phase 2 TIM(TIPTOP Implement Methodology) & Project Organization TIM ( TIPTOP Implementation Methodology ) < Project Life Cycle > Project Planning TIPTOP Goes Live Implementing • Goals • Survey & Diagnosis • Existing System Stops • Scope • Application Training • Organization • S.O.P. Modeling • On-site ProblemSolving • Schedule • Gap Analysis & Solution Design • Data Migration & Input • Simulation & tuning Fine- • Balance Checked in Project Closing • Achievements Check Meeting • Documentation of Project • Take-over of TSC • All case profile in CRM system Group Company - Project Structure Chairman Mr. Tony Steering Committe Mr. Richard Mr Alex Mr Gary Ms Maria Mr Toto Ganda IDN Project Leader Chinfon VN Project Leader Toto Alex Ganda IDN Project Leader Toto – Ganda Group Indonesia TBD – DIGIWIN PROJECT MANAGER Digiwin Consultant Support Function 1.Finance & Acc = Consutant 1 (1 person) 2.Mfg and Sales & Dist = Consultant 2 (1 person) 3.HRM,= consultant 3 (1 person) 4.BI = Consultan 4 (1 person) 5.Easyflow = consultant 5 (1 person) 6.System Analysis / Trainer = Consultant 6 ( 2 person) Note: Not include programmer who should working on Taiwan) 1. Change & Communication : Toto 2.Project Supporting: Hary Technical Support 1. Sunu Waskita (leader) 2. Appilion 3..Digiwin System Engineer (1 person) Group Leader 1 Group Leader 2 Group Leader 3 1. Vacant 1. Vacant 1. Vacant Business Inteligent Mgt Report, KPI, etc Advance Features PLC/Field instrument integration Advance Features B2B, Websales, etc Purchasing & Inventory Manufacturing & CMMS Human Resources Sales & Distribution Accounting & Finance Process Owner: ...... Process Owner: Ms Maria Process Owner: Mr Wahyu Process Owner: Ms. Jacqueline Process Owner: Mr Gary Fleet Management Process Owner: ...... Project Management Process Owner: Mr Anang 1..........................(Staff) 2........................... 1. ...............(Staff) 2................. 1. ...............(Staff) 2................. 1. ...............(Staff) 2................. 1. ...............(Staff) 2................. 1. ...............(Staff) 2................. 1. ...............(Staff) 2................. Team (Key User) 1.. ............ 2. .......... 3. ............. 4. .......... Team (Key User) 1.. ............ 2. .......... 3. ............. 4. .......... Team (Key User) 1.. ............ 2. .......... 3. ............. 4. .......... Team (Key User) 1.. ............ 2. .......... 3. ............. 4. .......... Team (Key User) 1.. ............ 2. .......... 3. ............. 4. .......... Team (Key User) 1.. ............ 2. .......... 3. ............. 4. .......... Team (Key User) 1.. ............ 2. .......... 3. ............. 4. .......... SCOPE: WHI, GG, AASTAR, CG, NSD, ANP, SAG, MM SCOPE: GG, AASTAR, CG, NSD, ANP, SAG, MM SCOPE: GG, AASTAR, CG, NSD, ANP, SAG, MM SCOPE: GG, AASTAR, CG, NSD, ANP, SAG, MM SCOPE: CG, SAG, MM SCOPE: ANP SCOPE: GG, CG Chinfon VN Project Leader Support Function T-038 Mr. Alex Hsu TBD – DIGIWIN PROJECT MANAGER 1.Finance & Acc = Consutant 1 (1 person) 2.Mfg and Sales & Dist = Consultant 2 (1 person) 3.HRM,= consultant 3 (1 person) 4.BI = Consultan 4 (1 person) 5.Easyflow = consultant 5 (1 person) 6.System Analysis / Trainer = Consultant 6 ( 2 person) Note: Not include programmer who should working on Taiwan) 1. Change & Communication : Alex Hsu 2.Project Supporting: Richard Technical Support 1.V1121 Le Quoc Tuan 2.V1422 Nguyen Thu Hong 3..Digiwin System Engineer (1 person) Group Leader ( Marketing ) Group Leader ( Administration ) 1. Vacant Business Inteligent Mgt Report, KPI, etc Digiwin Consultant 1. Vacant Group Leader ( Production ) Advance Features B2B, Websales, etc 1. Vacant Finance & Accounting G/A Warehouse / Canteen Sales & Distribution Purchasing / Export W/H Spare Parts & Inventory 1.................(Dept. Lead) 2..................(Key User) 1.................(Dept. Lead) 2.................(Key User) Team (Key User) 1.................(Dept. Lead) 2.................(Key User) 1.................(Dept. Lead) 2.................(Key User) 1.................(Dept. Lead) 2.................(Key User) Team (Key User) Team (Key User) Team (Key User) 1.. ............ 2. .......... 3. ............. 4. .......... 1.. ............ 2. .......... 3. ............. 4. .......... Team (Key User) 1.. HP ............ 2. HN .......... 3. HM ............. 4. DN ............. 5. .HPGP......... 1. GL ............ 2. A/P.......... 3. A/R............. 4. Cash....... 5. .Costing...... 6.Fixed Asset 1.. ............ 2. .......... 3. ............. 4. .......... Maintenance CMMS Logistic & Shipping Finished Goods Project Management HR Management 1.................(Dept. Lead) 2..................(Key User) Team (Key User) 1.................(Dept. Lead) 2..................(Key User) Team (Key User) 1.................(Dept. Lead) 2.................(Key User) Team (Key User) 1.................(Dept. Lead) 2.................(Key User) Team (Key User) 1.................(Dept. Lead) 2..................(Key User) Team (Key User) 1.. ............ 2. .......... 3. ............. 4. .......... 1.. ............ 2. .......... 3. ............. 4. .......... 1.. ............ 2. .......... 3. ............. 4. .......... 1.. ............ 2. .......... 3. ............. 4. .......... 1.. ............ 2. .......... 3. ............. 4. .......... Advance Features PLC/Field instrument integration Production / Manufacturing T.K.P & HPGP 1.................(Group leader) 2..................(Consultant) Team (Key User) 1..Quarry 2. Raw Mill 3. Kiln . 4. Cement Mill 5. CCR 6.Packing 7.F/G 8.Elec. 9.QC Project Team Responsibilities Role Responsibility Qualifications Remark Project Leader • Deliver the specified project deliverables on time in good quality and in accordance with the budget Achieve milestones on time Report on project progress to the steering committee Identified of potential bottleneck and initiate to propose the solution Coordinate & Assign tasks to project members Keep in touch with Consultant to ensure successfully the project and for knowledge transfer • • • • • • • • • Knowledge of business processes The ability to work effectively with all levels within Organization Project Management Expertise Have good understanding of project scope & constraint. Time management skills and multi-tasking capabilities Good on verbal and written communication skills The ability to make timely decisions Strong organizational skills Good leadership and coaching skills Full time IT Technical Support • • • Providing IT infrastructure for implement ERP System To setup system requirement for ERP System Support user to operate this system • Have Good skill & experience in Databases, networking, and operating system Have good understanding on the current IT System Experience and knowledge in current system environment. Part time but ready if required Support Function • To assist project team on Project administration, training, business process development and prepare new infrastructure (if needed) To coordinate change program impacted of ERP impl. system Project Administration task Setup and organize documentation control system and records • Good knowledge of the company’s organizational structure and business processes The ability to work effectively with all members of the organization ranging from executive members to front line / users. Full Time Group Leader • • Leader on development defined modules To manage and coordinate project communication, training, socialization and prepare new infrastructure (if needed) Working together with consultant to determine business process flow that needed to ERP system requirement with consultation to process owner. Development of business process documentation (incl design standard form and report) with consultation to process owner. Conduct testing, data collection, data validate and data migration for new system configuration. To drive, coach and facilitate the implementation of new system Issues resolution Working together with key user to Identify of end user, training requirements at their particular site. • • Experience in functional business process, In-depth knowledge of the company’s business processes & best practices, Strong analytical skills and problem solving skills Strong communication skills and coaching skills Excellence team player skills, with strong verbal and written communication skills and coaching skills, Experience to design and developing System & Procedures. Experience in delivery training Full time Co-ordinate between Project and End User Represent End Users Support project team by share data & information Validate data & Process Build knowledge of what new system will do Assist on end user training “Owner” of new system Lead in managing the change in their unit areas • An in-depth knowledge of the business unit functionality business and requirements in their business process area(s), Strong analytical skills. Active and willing Able to use own initiative Good at interpersonal communication Part Time but ready on demand with advance notification • • • • • • • • • • • • • • Key User • • • • • • • • • • • • • • • • • • • • DSC Service Team [PM qualifications]: 1. Project planning 2. Definition, clearance, & Statement of main project issues 3. Allocate DSC service team resources Project Manager 4. Main Communicator to client team 5. System progress & risk management 6. monthly report Account Consultant Account Services ID & VN team ID & VN team System Engineer Programmer [Consultant Main Tasks] 1. Discuss & confirm System SOP 2. System Education 3. Implement System according to TIM [Service Team main tasks] 1. Assist consultant draw system analysis 2. Coordinate Programming pool & test 3. Customer service [System Engineer main tasks] 1. Installation TIPTOP system 2. Assist normal operational maintenance 3. Abnormal recovery Device Integration For Ganda Group Charley Cheng DigiWin Corporation 2013/04/19 Device Integration Architecture for TIPTOP (DB solution) Current New by Database Truck Weight Scale Data Collation Software Output Request on demand Or periodically Finger Print Data Collation Software SQL Compute Feedback data Save Record Statistic Database Door Lock Data Collation Software Reports Oracle Query Database And so on… Data Collation Software Monitor Device Integration Architecture for TIPTOP (Text File Solution) Text File Exchange Truck Weight Scale Data Collation Software Finger Print Data Collation Software Door Lock Data Collation Software Output Text File Folder Obtain Data Periodically Transfer Programs Request by Demand Reports Compute Statistic Save Records Sharing Folders To ERP Oracle Query Database And so on… Data Collation Software Monitor Hardware Infrastructure Indonesia & Vietnam Hardware Suggestion~ Indonesia Service Ethernet Giga Switch For VMNetwork EFGP + ESS 8C / 12G(Win+MSSQL) BI + Auditor 8C/12G(Win+MSSQL) TIPTOP DB 8C / 16G(RHEL+Oracle) HRM 8C/12G (Win+MSSQL) TIPTOP B2B 8C / 12G(RHEL) 4C/8G(Win+MSSQL) Crystal Reports 4C/8G (Win) TIPTOP AP 8C / 16G(RHEL) HP DL380 Gen8 2P12C / 64GB 300GB SAS 10K x2 8Gb Single HBA x 4 VMWare vSphere 5 ESP HP DL380 Gen8 2P12C / 64GB 300GB SAS 10K x2 8Gb Single HBA x 4 VMWare vSphere 5 ESP HP DL380 Gen8 2P12C / 64GB 300GB SAS 10K x2 8Gb Single HBA x 4 VMWare vSphere 5 ESP Portal Client User - Guard service - VMWare vCenter Server - Symantec Backup Server NAS Appliance ( 2TB HDDx6 RAID5) Back up SVR Phase 2 Backup Guard Service XP or above PC Symantec Backup Exec Agent For VM Host / SQL/ Oracle Redundant Fiber Channel IBM DS3500 Storage 2G Cache/Per-Controller HD: 600GB 6Gb SAS 15K*12 IBM DS3500 Storage 2G Cache/Per-Controller HD: 600GB 6Gb SAS 15K*12 4Gb or 8Gb Fibre Channel Giga intranet VMWare Internal data Transfer SPEC List - Indonesia Hardware all Local purchase QTY Host for virtual machine HP DL380 Gen8 : CPU : E5-2620 x 2 、RAM : 64G 、HDD : 300G x 2、8Gb Dual-Port Fiber Card x 2 、 1Gb Giga Port x 4 3 Storage IBM DS3500 Storage (Dual-Controller)、SFP x 8、2G Cache/Per-Controller、HD: 600GB 6Gb SAS 15K * 12、FC Cable x 8 2 Backup Server HP X1430 NAS Appliance G2 WSS NAS(8TB)(Builtin Windows 2012) 1 Guard Server HP ThinClient T610 for P-Cloud (Builtin Windows) 1 Ethernet Switch HP V1910-24G Switch 1 Software partial local purchase Operation System RedHat Enterprise Linux for TIPTOP AP 、TIPTOP DB、TIPTOP B2B 2 Windows Server 2008 MOLP for Crystal Report、EFGP+ESS、Portal、BI+Auditor、HRM Local purchase 5 Windows Server CAL Local purchase Database Backup 100 Oracle DB Standard Ed. For 2-processor for TIPTOP ERP 1 Microsoft SQL Server Standard Ed. MOLP,Device Cal for EFGP+ESS、Portal、BI+Auditor、HRM Local purchase 4 Microsoft SQL server CAL Local purchase Virtualization QTY 100 VMWare vSphere 5.1 Essential Plus 1 SYMC BACKUP EXEC 2012 V-RAY EDITION WIN 2 TO 6 CORES PER CPU BNDL STD LIC EXPRESS BAND S ESSENTIAL 12 MONTHS 6 Hardware Suggestion~ Vietnam Service Ethernet Giga Switch For VMNetwork EFGP + ESS 8C / 12G(Win+MSSQL) BI + Auditor 8C/12G(Win+MSSQL) TIPTOP DB 8C / 16G(RHEL+Oracle) HRM 8C/12G (Win+MSSQL) TIPTOP B2B 8C / 12G(RHEL) 4C/8G(Win+MSSQL) Crystal Reports 4C/8G (Win) TIPTOP AP 8C / 16G(RHEL) HP DL380 Gen8 2P12C / 64GB 300GB SAS 10K x2 8Gb Single HBA x 4 VMWare vSphere 5 ESP HP DL380 Gen8 2P12C / 64GB 300GB SAS 10K x2 8Gb Single HBA x 4 VMWare vSphere 5 ESP HP DL380 Gen8 2P12C / 64GB 300GB SAS 10K x2 8Gb Single HBA x 4 VMWare vSphere 5 ESP Portal Client User - Guard service - VMWare vCenter Server - Symantec Backup Server NAS Appliance ( 2TB HDDx6 RAID5) Back up SVR Existing System HP DL380 Gen8 2P12C / 64GB 300GB SAS 15K x5 Raid 5+HSP VMWare vSphere 5 ES Phase 2 Backup Guard Service XP or above PC Symantec Backup Exec Agent For VM Host / SQL/ Oracle Redundant Fiber Channel IBM DS3500 Storage 2G Cache/Per-Controller HD: 600GB 6Gb SAS 15K*12 IBM DS3500 Storage 2G Cache/Per-Controller HD: 600GB 6Gb SAS 15K*12 4Gb or 8Gb Fibre Channel Giga intranet VMWare Internal Data Transfer SPEC List - Vietnam Hardware all Local purchase QTY Host for Virtual Machine HP DL380 Gen8 : CPU : E5-2620 x 2 、RAM : 64G 、HDD : 300G x 2、8Gb Dual-Port Fiber Card x 2 、 1Gb Giga Port x 4 3 Host For Existing System HP DL380 Gen8 : CPU : E5-2620 x 2 、RAM : 64G 、HDD : 300G x 5、1Gb Giga Port x 4 1 Storage IBM DS3500 Storage (Dual-Controller)、SFP x 8、2G Cache/Per-Controller、HD: 600GB 6Gb SAS 15K * 12、FC Cable x 8 2 Backup Server HP X1430 NAS Appliance G2 WSS NAS(8TB)(Builtin windows 2012) 1 Guard Server HP ThinClient T610 for P-Cloud (Builtin Windows) 1 Ethernet Switch HP V1910-24G Switch 1 Software partial local purchase Operation System RedHat Enterprise Linux for TIPTOP AP 、TIPTOP DB、TIPTOP B2B 2 Windows Server 2008 MOLP for Crystal Report、EFGP+ESS、Portal、BI+Auditor、HRM Local purchase 5 Windows Server CAL Local purchase Database Backup 100 Oracle DB Standard Ed. For 2-processor for TIPTOP ERP 1 Microsoft SQL Server Standard Ed. MOLP,Device Cal for EFGP+ESS、Portal、BI+Auditor、HRM Local purchase 4 Microsoft SQL server CAL Local purchase Virtualization QTY 100 VMWare vSphere 5.1 Essential Plus 1 SYMC BACKUP EXEC 2012 V-RAY EDITION WIN 2 TO 6 CORES PER CPU BNDL STD LIC EXPRESS BAND S ESSENTIAL 12 MONTHS 6 B2B&BI Ganda initial requirement of TIPTOP B2B Customer can make the sales order / lading bill via web Customer can make the cement issue schedule via web Customer can know the inventory status via web Carrier can know the transport status via web. • Posting enquiries and sales orders through web-sales (web-sales) TIPTOP B2B V-Point BI Implementation strategy, improve performance management • Quantization execution strategy, Easy to use, analysis, adjustments • View the target reached,performance indicators management • Ex:Operating margin, current ratio, accounts receivable turnover days, CCC(Cash conversion cycle), liability ratio, Current ratio, amount of inventory, turnover per capita, Orders shipping days, revenue growth rate, vaerage customer price. 26 27 KPI Performance Management Spare Parts-Safety inventory Of Alert Analysis Inventory Trend Analysis Sales Intelligence with KPI template Financial Intelligence with KPI template TIPTOP exception management Business Object platform BO Xcelsius Dashboard developer 32 TIPTOP Exception Management 33 Easyflow~ The Business Process Management 流程追蹤 Approval on line 35 Process Statistic analysis to achieve optimal Process Performance Loading Cost ~Efficiency~ ~Loading~ ~Cost~ AVG process time AVG process time trend AVG process time by activities AVG process time per User Process Starts quantity Process finish quantity Process trends To do list quantity Process activities allocation Process dealing cost AVG Dealing cost AVG Dealing cost by activities AVG Dealing cost by activities per User Total Services Oriented Demand Satisfying Total Services Demand Leading Pre -Sale Deploying Maintenances Valued Sales Implement Post-enhance 精進管理 Achieve Project Goal ROI improving 實現投資效益 Demand clarifying & Solution Planning TIPTOP Service Center/ TIPTOP Programming Center / TIPTOP R&D / TIPTOP E-Learning/ TIPTOP ERP II e-Service 36 About the after service Redundant infrastructure provided in each of Ganda & CFC at local site. And we treat Ganda & CFC as other’s mutual backup & support system . Once the emergency situation happened, Ganda can switch the system via Virtualize Machine in local side. The worst case is JKT machine room is dead, Ganda can switch the system temporary to CFC if the internet is linking and Digiwin can response asap. Telephone, fax inquiry service; Remote terminal login service; Program debugging service; Elimination of system malfunction arising out of normal usage; and Program version update: “minor patches” as termed in the industry. Extra requirement for customization inquiry and SA documents Technical courses online via video conference(after go-live) DB diagnosis , system performance advisory E-service website (in Chinese) for FAQ, Knowledge base for user E-Learning in (Chinese) •The System analyst will be fulltime contact window for Ganda after system go-live •If emergency problem happens, such as system crash, DB crash, power shot down, emergency recovery…etc, the contact window will inform the engineer team to remote to service. AS long as the telecom company network works. •The All system modules for ERP II just find one contact window. •80%questions can be solved within 24 hours, 90% can be solved in 48 hours, and 95% can be solved in 72 hours.