ADJUSTABLE MECHANICAL STILTS

Download Report

Transcript ADJUSTABLE MECHANICAL STILTS

INTRO
PROBLEM
IDEAS
DESIGN
ANALYSIS
BUDGET
MANUALLY
ADJUSTABLE
STILTS
SCHEDULE
CONCLUSION
“Easy Lifts”
1
INTRO
PROBLEM
IDEAS
DESIGN
ANALYSIS
BUDGET
SCHEDULE
CONCLUSION
GROUP MEMBERS
Trent Hilliard
Ian Juurlink
Brad Poirier
Mitchell Weir
SUPERVISOR
Dr. Marek Kujath
2
INTRO
PROBLEM
IDEAS
DESIGN
ANALYSIS
BUDGET
SCHEDULE
CONCLUSION
3
INTRO
CURRENT STILTS:
PROBLEM
IDEAS
DESIGN
1. Used for tasks requiring
small rises in elevation
ANALYSIS
BUDGET
SCHEDULE
CONCLUSION
2. Difficulties:
• Getting on stilts
• Picking up objects
• Adjusting
4
INTRO
GETTING UP:
PROBLEM
IDEAS
DESIGN
ANALYSIS
BUDGET
SCHEDULE
CONCLUSION
5
INTRO
PICKING UP OBJECTS:
PROBLEM
IDEAS
DESIGN
ANALYSIS
BUDGET
SCHEDULE
CONCLUSION
6
INTRO
GETTING DOWN:
PROBLEM
IDEAS
DESIGN
ANALYSIS
BUDGET
SCHEDULE
CONCLUSION
7
INTRO
PROBLEM
IDEAS
DESIGN
ANALYSIS
BUDGET
SCHEDULE
CONCLUSION
8
INTRO
LIFTING DEVICE
PROBLEM
IDEAS
1. Power screw
DESIGN
ANALYSIS
BUDGET
SCHEDULE
CONCLUSION
http://forums.vwvortex.com
9
INTRO
LIFTING DEVICE
PROBLEM
IDEAS
2. One leg-lift
DESIGN
ANALYSIS
BUDGET
SCHEDULE
CONCLUSION
10
INTRO
LIFTING DEVICE
PROBLEM
IDEAS
3. Hydraulic Scissor Lift
DESIGN
ANALYSIS
BUDGET
SCHEDULE
CONCLUSION
www.autoliftuk.com
11
INTRO
LOCKING DEVICE
PROBLEM
IDEAS
Rotary Ratchet
DESIGN
ANALYSIS
BUDGET
SCHEDULE
CONCLUSION
www.wikipedia.org
www.istockphoto.com
12
INTRO
LIFTING DEVICE: SCISSOR LIFT
PROBLEM
IDEAS
DESIGN
ANALYSIS
BUDGET
SCHEDULE
CONCLUSION
13
INTRO
LIFTING DEVICE: SCISSOR LIFT
PROBLEM
IDEAS
DESIGN
ANALYSIS
1. Member Design
2. Member
Confinement
BUDGET
SCHEDULE
CONCLUSION
3. Assembly
Materials
•
•
•
Aluminum
Bushings
Snap Rings
14
INTRO
LIFTING DEVICE: SCISSOR LIFT
PROBLEM
IDEAS
DESIGN
ANALYSIS
BUDGET
SCHEDULE
CONCLUSION
15
INTRO
LOCKING MECHANISM:
PROBLEM
IDEAS
DESIGN
ANALYSIS
BUDGET
SCHEDULE
CONCLUSION
16
INTRO
LIFTING DEVICE: SCISSOR LIFT
PROBLEM
IDEAS
DESIGN
ANALYSIS
BUDGET
SCHEDULE
CONCLUSION
17
INTRO
PROBLEM
IDEAS
DESIGN
LINEAR DAMPER:
1. Gas Spring
2. Provides upward force
3. SAFETY feature
ANALYSIS
BUDGET
SCHEDULE
CONCLUSION
18
INTRO
FORCE DETERMINATION:
PROBLEM
IDEAS
DESIGN
W = Force Applied
ANALYSIS
L = Length of
Beam
BUDGET
SCHEDULE
CONCLUSION
D = Location of
Center of
Gravity
19
INTRO
Stress Analysis:
PROBLEM
Stress in Most Heavily Loaded Beam
IDEAS
50
45
DESIGN
BUDGET
SCHEDULE
CONCLUSION
Stress (ksi)
ANALYSIS
Aluminum Yield Stress
40
35
30
25
20
15
Minimum
Locking
Height
10
5
0
0
5
Total Stress
Bending & Axial
10
15
Height (in)
20
25
20
INTRO
PROBLEM
IDEAS
DESIGN
ANALYSIS
BUDGET
SCHEDULE
CONCLUSION
Item
Item Cost Qty.
Stilts
$365.00 1
Bearings
$1.41 16
Bushings
$0.72 16
Aluminum Plating
$88.16 1
Steel Flat Bar
$6.96 2
Aluminum Flat Bars
$6.30 6
Pins
$6.00 2
Concept Prototype
$50.00 1
Snap Rings
$36.31 1
Actuator
$30.00 2
Locking Mechanism
$74.80 1
Damper
$50.00 2
TOTAL (with 10% contingency)
Total Cost
$365.00
$22.56
$11.52
$88.16
$13.92
$37.80
$12.00
$50.00
$36.31
$60.00
$74.80
$100.00
$1,274.16
21
INTRO
CRITICAL SCHEDULE ITEMS
PROBLEM
IDEAS
DESIGN
Jan/14/10:
Final Drawing Submission
ANALYSIS
BUDGET
SCHEDULE
Feb/01/10:
All material obtained
CONCLUSION
March/01/2010:
Fabrication and assembly
22
INTRO
CRITICAL SCHEDULE ITEMS
PROBLEM
IDEAS
DESIGN
March/22/10:
Testing
ANALYSIS
BUDGET
SCHEDULE
April/08/10:
Final report submission
CONCLUSION
April/10/10:
Final presentation
23
INTRO
WHAT’S LEFT?
PROBLEM
IDEAS
1. Fine details on locking mech.
DESIGN
ANALYSIS
2. Finalize the damper force
BUDGET
SCHEDULE
CONCLUSION
24
INTRO
QUESTIONS?
PROBLEM
IDEAS
DESIGN
ANALYSIS
BUDGET
SCHEDULE
CONCLUSION
25
INTRO
WALKING WEIGHTS:
PROBLEM
IDEAS
1. Current Stilts weight:
15.5 lbs.
2. Competitor stilts:
14-17 lbs
DESIGN
ANALYSIS
BUDGET
SCHEDULE
CONCLUSION
3. Miner’s work boots:
4. Target stilt weight:
7 lbs
<20 lbs
26
INTRO
PROBLEM
IDEAS
DESIGN
ANALYSIS
BUDGET
SCHEDULE
CONCLUSION
27