Development of Quality Action Plan
EU Studies and Inspections
• JASPERS/COWI
Support to Improvement of Supervision Systems and Quality Assurance for Road
Construction Contracts, 2011-2012
• JACOBS Consultancy
Independent visual inspection of implemented EU co-financed projects 2001-2011
• Quality Action Plan
Ministry of Transport, Latvian State Roads
• Reporting to MoT/MoF/Government/EC
2 times per year in June and December
September 2013, Projects Quality Audit Department, Latvian State Roads
2
QAP. Administrative Measures (1)
• General measures – 7:
– economically feasible offers + liability of designers and supervisers, warranty
liabilities in construction, road technical audit, innovations and development
• JASPERS/COWI - 27 administrative recommendations:
– design, construction, supervision, warranty period, maintenance
• Jacobs Consulting - 6 immediate technical measures:
–
–
–
–
–
–
longitudinal joint, cracks;
insufficient maintenance activities;
shoulders;
carriageway depression;
water runoff;
pothole repair
September 2013, Projects Quality Audit Department, Latvian State Roads
3
Administrative Measures (2)
• Road Competence Center (RCC) under the
Latvian State Roads* (vision)
• Main responsibilities of RCC:
– Road Laboratory (existing);
– Research and development (existing/new);
– Inspections and expertises (new)
* - planned from the 1st of January 2014
September 2013, Projects Quality Audit Department, Latvian State Roads
4
Technical Measures (1)
In 2013 LSR has carried out the following number
of non-planned inspections/tests:
•
•
•
•
•
Bitumen emulsion – 46;
Mineral materials/aggregates – 71;
Drilled asphalt samples and asph mix – 181;
Reflection measurements – 129 places;
Road bearing capacity – 399 places
September 2013, Projects Quality Audit Department, Latvian State Roads
5
Technical Measures (2)
• Publication of updated version of the Road
Specifications 2012 (approved by the TC of LSR in June 2013)
• Preparation of the Road Specifications 2014
– Work group of representatives of LSR, road design,
construction and maintenance companies, consultants,
Riga Technical University
– Approval by the Technical Commission of LSR
September 2013, Projects Quality Audit Department, Latvian State Roads
6
Periodic Maintenance, ERDF projects, 2013
No.
Road index, name
Completion
year
1.
P30 Cēsis - Vecpiebalga - Madona
2.
Section
from
km
to
km
total
km
2007
11,60
14,90
3,30
P30 Cēsis - Vecpiebalga - Madona
2005
14,90
24,70
9,80
3.
P105 Saldus - Ezere
2006
9,00
18,30
9,30
4.
P85 Rīgas HES - Jaunjelgava
2005
0,00
8,86
8,86
5.
P131 Tukums - Ķesterciems Mērsrags - Kolka
2005
66,99
71,19
6.
P49 Krāslava - Ludza - Ezernieki
2006
7,20
2005
7.
8.
9.
P69 Skrudaliena - Kaplava Krāslava
P33 Ērgļi - Jaunpiebalga Saliņkrogs
P117 Skrunda - Aizpute
Renovation
method
Surface treatment
Contract
price,
EUR
1 010 209
Renovation of
wearing course
Renovation of
wearing course
Renovation of
wearing course
786 852
4,20
Surface treatment
94 898
17,00
9,80
Surface treatment
208 892
24,06
33,87
9,81
Surface treatment
161 079
2006
25,30
35,50
10,20
Surface treatment
291 246
2006
0,87
4,70
3,83
Surface treatment
73 507
Total:
72,7
September 2013, Projects Quality Audit Department, Latvian State Roads
268 966
2 895 649
7
Periodic Maintenance, CF projects, 2013
No.
Road index, name
Completion
year
Section
from
km
to km
total
km
Renovation
method
Contract
price, EUR
1.
A2 Rīga -Sigulda – Estonian
Border
2004
12,41
14,90
2,49
Renovation of
wearing course
1 445 683
2.
A7 Rīga - Bauska Lithuanian
Border (Grenctāle)
2001
44,60
65,20
20,60
New wearing
course
2 615 311
Total: 23,1
4 060 994
Total periodic maintenence budget for CF/ERDF projects in 2013 is 6,95 million EUR
September 2013, Projects Quality Audit Department, Latvian State Roads
8
Periodic Maintenance, EU/ERDF, 2014-15
Financing in 2014,
million EUR
Measures
State main roads (CF)
5,00
Regional roads (ERDF)
0,83
Bridges (CF/ERDF)
0,18
Municipal transit streets (ERDF)
0,50
Specific daily maintenance measures
0,85
Total:
7,36
• Detailed periodic maintenance programme for 2014 will be approved after analysis of annual
pavement visual inspection data in Nov/Dec 2013
• Planned budget for 2015 is about 7,5-8,5 million EUR
September 2013, Projects Quality Audit Department, Latvian State Roads
9
Road Network Financing
September 2013, Projects Quality Audit Department, Latvian State Roads
10
Conclusions
• Complex quality improvement measures in
each stage of road project
Technical design, construction, supervision, daily and periodic maintenance
• Periodic maintenance of investments as a part
of road lifecycle
September 2013, Projects Quality Audit Department, Latvian State Roads
11