Transcript Document
УПРАВЛЯЮЩАЯ КОМПАНИЯ Moscow 2010 UEC Companies УПРАВЛЯЮЩАЯ КОМПАНИЯ Perm Motors JSC NPO "Saturn" JSC, Saturn - Gas Turbines JSC MPP «Motor» Ufa Engine Industrial Association JSC Kuznetsov JSC, N.D Kuznetsov STCS Klimov JSC Chernyshev MMBE JSC UEC Gas Turbines УПРАВЛЯЮЩАЯ КОМПАНИЯ Manufacturing Company GT Type Power Output, MWe GTU-2,5P 2,56 GTU-4P 4,13 GTU-6P 6,14 GTU-12PG-2 12,3 GTE-16PA 16,3 GTU-16PA2 16,4 GTU-25P 23,0 DO-49 2,85 NPO "Saturn" JSC, Saturn - Gas GTD-6RM 6,5 Turbines JSC GTD-8RM 8,56 GTD-10RM 10,0 GTD-110 110,0 - GTP-10/953 8,2 R-13 AL-31CTE 18 AL-31F NK-14EBR 10,5 NK-12MP NK-37ST 26,5 NK-32 GTP-1,25 1,329 TVЗ-117 GTP-55ST-20 20,0 R-29-300 Perm Motors JSC MPP «Motor» Ufa Engine Industrial Association Initial Engine D-30 PS-90А D-30KU/КP JSC Kuznetsov JSC, N.D Kuznetsov STCS Klimov JSC Chernyshev MMBE JSC Gas Turbines 1,25 MW output УПРАВЛЯЮЩАЯ КОМПАНИЯ GTP-1,25 Manufacturer GT Type Power Output, (MWe) 1,329 LHV Efficiency, % 25,0 Exhaust heat , Гкал/ч 2,0 Heat Effisiency Rate, % 68,7 Total GT in operation Overall operating time, h Klimov JSC GTP-1,25 3 26 500 ISO Conditions Fuel - Natural Gas Gas Turbines 1,25 MW output Reference УПРАВЛЯЮЩАЯ КОМПАНИЯ GT Manufacturer Klimov JSC Customer Location Amount Commercial Operation OOO Lucoil-Sever Ardalin field (Arkhangelsk region) 1 2001 Kronstadt Plant St. Petersburg 2 2004 Total GT in operation Overall operating time, h 3 26 500 Gas Turbines 2,5 MW output УПРАВЛЯЮЩАЯ КОМПАНИЯ GTU-2,5P DO 49 Perm Motors JSC NPO "Saturn" JSC, Saturn - Gas Turbines JSC ГТУ-2,5П ДО 49 Power Output, (MWe) 2,56 2,85 LHV Efficiency, % 21,12 28,5 Exhaust heat , Гкал/ч 5,82 3,9 Heat Effisiency Rate, % 76,9 74 Total GT in operation 133* 28 Overall operating time, h 2 469 744 159 554 Manufacturer GT Type * Including GT in reserve and under repair ISO Conditions Fuel - Natural Gas Gas Turbines 2,5 MW output applications УПРАВЛЯЮЩАЯ КОМПАНИЯ Perm motors JSC SCPP «Ural-2500», Gas Boosting Station Yubileynaya, ООО «Gazprom dobycha Nadym» (2004) NPO «Saturn» JSC SCPP GTES-2,5 Gas Boosting Station Salskaya ООО Gazprom transgaz Stavropol (2003) Perm motors JSC SCPP «Ural-2500», Sosvinskoe Gas Boosting Station ООО Gazprom Transgaz Yugorsk (2005) NPO «Saturn» JSC SCPP GTES-2,5 Gas Boosting Station Pestsovoye ООО Gazprom dobycha Urengoy (2006) Perm motors JSC SCPP «Ural-2500», Uralskoe Gas Boosting Station ООО Gazprom Transgaz Yugorsk(2007) NPO «Saturn» JSC SCPP GTES-2,5 Gas Boosting Station Harvutinskoye ООО Gazprom dobycha Yambur (2007) Gas Turbines 2,5 MW output Reference УПРАВЛЯЮЩАЯ КОМПАНИЯ GT Manufacturer Customer Amount Commercial Operation Igrim 6 1994 Yamburgskoe GBS 7 1997 Nydinskoe GBS 6 1997 N. Urengoyskoe GBS 2 2004 GBS Yagelnoe 3 1999 GBS Priozernoe 3 2000 Long-Yuganskkoe GBS 3 2000 Pravokhettinskoe GBS 3 2000 Nalymskoe GBS 3 2001 Sorumskoe GBS 4 1997 Sosnovskoe GBS 4 1999 Kazymskoe GBS 5 1997 Bobrovskoe GBS 3 1998 Verhnekazymskoe GBS 4 1998 Oktyabrskoe GBS 4 1996 Peregrebnenskoe GBS 4 1996 Uralskoe GBS 8 1996 Sosvinskoe GBS 6 2005 Puntinskoe GBS 3 1999 Komsomolskoe GBS 1 2001 Krasnoturyinsk 1 in reserve GBS Pangody 4 2007 ООО “Burenergo" Noviy Urengoy 5 2000 ООО " Gazprom Transgaz Ukhta" Urdomskoe GBS 4 2000 Yamsoveyskiy GBS 7 2002 GBS Yubileynaya 6 2004 Kharasaveyskaya GBS 4 balancing and commissioning Yamalskoe GBS 5 balancing and commissioning Novozapolyarniy 8 2001 ОАО «Kompania YUG» ООО “Gazprom Transgaz Yugorsk" Perm Motors JSC ООО " Gazprom Dobycha Nadym" ООО " Gazprom Transgaz Yamburg" Total GT in operation Overall operating time, h Location 126 2 469 744 Gas Turbines 2,5 MW output Reference УПРАВЛЯЮЩАЯ КОМПАНИЯ GT Manufacturer Customer NPO "Saturn" JSC, ООО “Gazrom Transgaz Stavropol" ООО “Gazprom UGS" ООО “Gazprom Dobycha Urengoy" ООО “Gazprom Transgaz Nizhniy Novgorod" ООО “Gazprom Dobycha Yamburg" Saturn - Gas Turbines JSC ООО “Gazprom Transgaz Ukhta" JSC NPO «Saturn» ZAO «Volgograd Bearing Factory» OOO NOVATEKYurkharovneftegas ОАО Oil and Gas Company «RussNeft» Total GT in operation Overall operating time, h Location Amount Commercial Operation GBS Salskaya 2 2003 Kasinovskoe UGS 3 2 units in 2006 1 unit in 2007 GBS Pestsovoe 6 2006 GBS Yavasskaya 2 2007 GBS Kharvutinskoe 4 2007 GBS Yubileynaya GBS Nyuksenica Rybinsk 3 3 1 Vologda 2 delivered in 2001 Nadym, (Yurkharovskoye field) 1 2006 Batovo, (NizhneShapshinskoe field) 1 2007 delivered in 2008 1999 28 159 554 Gas Turbines 4 MW output УПРАВЛЯЮЩАЯ КОМПАНИЯ GTU-4P Manufacturer GT Type Power Output, (MWe) LHV Efficiency, % 24 Exhaust heat , Гкал/ч 8,3 Heat Effisiency Rate, % 80,2 Total GT in operation 35* Overall operating time, h * Including GT in reserve and under repair Perm Motors JSC GTU-4P 4,13 962 180 ISO Conditions Fuel - Natural Gas Gas Turbines 4 MW output applications УПРАВЛЯЮЩАЯ КОМПАНИЯ Perm Motors JSC SCPP «Ural-4000», SSHPP «Shigili», ОАО «Bashkirenergo» (1997) Perm Motors JSC SCPP «Ural-4000» SCHPP «Agidel» ООО «Bashkirskaya Generiruyuschaya kompaniya» (1997) Perm Motors JSC SCPP «Ural-4000» Gastello vill., Sakhalin-Energy (commissioning) Gas Turbines 4 MW output Reference УПРАВЛЯЮЩАЯ КОМПАНИЯ GT Manufacturer Customer Location Amount Commercial Operation Surgutneftegas OJSC ООО «Lukoil – Zapadnaya Sibir» Konitlor 6 2001 S.-Gubkinskoe field 2 2001 Sysert 1 1999 Aramil 1 2006 Storage base 1 in reserve Bolsheustikinskoe 1 2000 Agidel 2 2002 Electronic Solar S.R.L. Adria (Italy) 2 balancing and commissioning ООО Gazprom Transgaz Ukhta Vuktyl 3 balancing and commissioning Perm 1 1997 Perm (Osentsy vill.) 1 1999 Neftyugansk 6 2002 Neftyugansk 1 Gastello (Sakhalin-2) 3 ООО «Gazprom Transgaz Ekaterinburg» ООО «Bashkirskaya Generiruyuschaya kompaniya» Perm Motors JSC Perm Motors JSC PGPZ JSC, ZAO SiburKhimprom ООО «YungEnergoneft» NPO «Iskra» Sakhalin-Energy Total GT in operation Overall operating time, h 2003 balancing and commissioning 31 962 180 Gas Turbines 6 MW output УПРАВЛЯЮЩАЯ КОМПАНИЯ GTU – 6P Manufacturer GTD – 6RM Perm Motors JSC NPO "Saturn" JSC, Saturn - Gas Turbines JSC GT Type GTU – 6P GTD – 6RM Power Output, (MWe) 6,14 6,5 LHV Efficiency, % 26,19 25 Exhaust heat , Гкал/ч 11,44 12,4 Heat Effisiency Rate, % 82,9 80,5 Total GT in operation 19 38 Overall operating time, h 99 480 548 524 ISO Conditions Fuel - Natural Gas Gas Turbines 6 MW output applications УПРАВЛЯЮЩАЯ КОМПАНИЯ Perm Motors JSC SCPP «Ural-6000» SCHPP Ivanovo JSC «TGC-6» Ivanovsky Branch (2004) NPO «Saturn» JSC GTA-6RM DHS Peredelkino Moscow Moscow energy efficiency agency (2005) Perm Motors JSC SCPP «Ural-6000» SCHPP Severo-Gubkinskoe field ООО «Lukoil – Zapadnaya Sibir» (2006) NPO «Saturn» JSC GTA-6RM DHS Kuryanova Moscow Moscow energy efficiency agency (2005) Perm Motors JSC SCPP «Ural-6000» SCHPP Solikamsk для JSC Silvinit (2007) NPO «Saturn» JSC GTA-6RM DHS Penyagino Moscow Moscow energy efficiency agency (2006г.) Gas Turbines 6 MW output Reference УПРАВЛЯЮЩАЯ КОМПАНИЯ GT Manufacturer Perm Motors JSC Customer Perm Motors JSC TGC-6 JSC Ivanovsky Branch OOO “Lukoil – Zapadnaya Sibir" Zvenigorod maintenance and utilities board Silvinit JSC OOO “Lukoil – Zapadnaya Sibir" OOO "Burgas" Total GT in operation Overall operating time, h Location Amount 1 Commercial Operation 2002 Ivanovo 2 2004 Severo-Gubkinskoe field 1 2007 Zvenigorod 3 assembling Solikamsk 2 2007 Pyakyakhinskoe field 4 shipping Bovanenkovskoe field 6 shipping Perm 19 99 480 Gas Turbines 6 MW output Reference УПРАВЛЯЮЩАЯ КОМПАНИЯ GT Manufacturer Customer NPO "Saturn" JSC ZAO Khimtrast ГУП «Централизованный стройзаказчик администрации Ненецкого автономного округа» «Sever-TEK» CJSC Location Rybinsk Omsk Haryan-Mar 2 2 2 2002 2003 2003 3 delivered in 2008 (assembling) 4 Mikhaylovka, Volgograd region Rodniki Moscow (DHS Kuryanovo) Moscow Moscow energy efficiency agency (DHS Penyagino) Moscow (DHS Peredelkino) Zelenograd Smolenskenergo JSC Dorogobuzh Surgut (Tromyeganskoe field) Surgut Surgutneftegas OJSC (Zapadno-Chigorinskoe field) Surgut (Verkhne-Nadymskoe field) 2 2 2 2005 2 2006 2 2005 2 2 2006 2005 2 2007 2 2008 4 2008 Tomskneft OJSC 2 delivered in 2009 (assembling) Usinsk (Yuzhno-Shapkino field) Mikhaylovka Administration Cotton concern «Rodniki Textil» - Gas Turbines JSC Commercial Operation 2003 2008 balancing and commissioning delivered in 2003 delivered in 2007 ООО «Lukoil-Komi» NPO "Saturn" JSC, Saturn Amount Total GT in operation Overall operating time, h Igolsko-Talovoe field 1 38 548 524 Gas Turbines 8 MW output УПРАВЛЯЮЩАЯ КОМПАНИЯ GTP-10/953 Manufacturer GTD-8RM MPP «Motor», Ufa Engine Industrial Association JSC NPO "Saturn" JSC, Saturn - Gas Turbines JSC GTP-10/953 GTD-8RM GT Type Power Output, (MWe) 8,2 8,56 LHV Efficiency, % 26 25,8 Exhaust heat , Гкал/ч 15,6 16,6 Heat Effisiency Rate, % 83,5 84 Total GT in operation 5 0 Overall operating time, h 41 200 0 ISO Conditions Fuel - Natural Gas УПРАВЛЯЮЩАЯ КОМПАНИЯ MPP «Motor», Ufa Engine Industrial Association JSC GTP-10/953 boiler department №4 Ishimbay, JSC Bashkirenergo (2002г.) Gas Turbines 8 MW output applications MPP «Motor», Ufa Engine Industrial Association JSC GTP-10/953 boiler department №4 Ufa, JSC Bashkirenergo (2005) MPP «Motor», Ufa Engine Industrial Association JSC GTP-10/953, SUAE farm Alekseevskiy, Ufa region Minstroy RB, (2008) Gas Turbines 8 MW output Reference УПРАВЛЯЮЩАЯ КОМПАНИЯ GT Manufacturer Customer Location Amount Commercial Operation JSC Bashkirenergo boiler department №5 Ishimbay 1 2002 JSC Bashkirenergo boiler department №4 Ufa 1 2005 Minstroy RB SUAE farm Alekseevskiy, Ufa region 1 2008 Mosenergo Pavlovskiy Posad, Moscow region 2 balancing and commissioning finished in 2008 MPP «Motor», Ufa Engine Industrial Association JSC Total GT in operation Overall operating time, h 5 41 200 Gas Turbines 10 MW output УПРАВЛЯЮЩАЯ КОМПАНИЯ NK-14EBR GTD-10RM Kuznetsov JSC, N.D Kuznetsov STCS NPO "Saturn“ JSC, Saturn - Gas Turbines JSC NK-14EBR GTD-10RM Power Output, (MWe) 10,5 10,5 LHV Efficiency, % 33,0 27 Exhaust heat , Гкал/ч 11,2 16,9 Heat Effisiency Rate, % 74 77,5 Total GT in operation 2 0 Overall operating time, h 355 0 Manufacturer GT Type ISO Conditions Fuel - Natural Gas Gas Turbines 10 MW output applications УПРАВЛЯЮЩАЯ КОМПАНИЯ Kuznetsov JSC, N.D Kuznetsov STCS NK-14 EBR, Mednogorsk JSC Orenburgenergo (balancing and commissioning) Gas Turbines 10 MW output Reference УПРАВЛЯЮЩАЯ КОМПАНИЯ GT Manufacturer Kuznetsov JSC, N.D Kuznetsov STCS Customer Location Amount Commercial Operation Orenburgenergo JSC Mednogorsk 1 balancing and commissioning Gazprom JSC Samara 1 balancing and commissioning Total GT in operation Overall operating time, h 2 355 Gas Turbines 12 MW output УПРАВЛЯЮЩАЯ КОМПАНИЯ GTU-12PG-2 Manufacturer GT Type Power Output, (MWe) 12,3 LHV Efficiency, % 32,6 Exhaust heat , Гкал/ч 16,6 Heat Effisiency Rate, % 83,7 Total GT in operation 34* Overall operating time, h * Including GT in reserve and under repair Perm Motors JSC GTU-12PG-2 549 034 ISO Conditions Fuel - Natural Gas Gas Turbines 12 MW output applications УПРАВЛЯЮЩАЯ КОМПАНИЯ Perm Motors JSC SCPP EGES-12S Lukyavinskoe field, OJSC Surgutneftegas (2004) Perm Motors JSC SCPP EGES-12S Bittemskoe field, OJSC Surgutneftegas (2004) Perm Motors JSC SCPP EGES-12S на Vatyeganskoe field, ООО «Lukoil – Zapadnaya Sibir» (2008) Gas Turbines 12 MW output Reference УПРАВЛЯЮЩАЯ КОМПАНИЯ GT Manufacturer Customer Surgutneftegas OJSC Perm Motors JSC ООО «Lukoil – Zapadnaya Sibir» ООО «Gazpromneft Khantos» Total GT in operation Overall operating time, h Amount Commercial Operation Lukyavinskaya SCPP-36 3 2004 Russinskaya SCPP-24 2 2004 Bittemskaya SCPP-36 3 2004 Lyantorskaya SCPP-24 2 2004 Lyanrorckaya SCPP-36 3 2004 Vatyeganskoe fied 6 2008 Tevlinsko-Rusinskoe field 4 2009 TMP «Pokachevneftegas» 4 shipping Yuzhno-Priobskoe fied 4 shipping Location 31 549 034 Gas Turbines 16-18 MW output УПРАВЛЯЮЩАЯ КОМПАНИЯ GTE-16PA Manufacturer AL-31CTE Perm Motors JSC MPP «Motor», Ufa Engine Industrial Association JSC GT Type GTE-16PA AL-31STE Power Output, (MWe) 16,3 18 LHV Efficiency, % 35,5 36 Exhaust heat , Гкал/ч 19,35 20,6 Heat Effisiency Rate, % 84,4 83,9 Total GT in operation 2 2* Overall operating time, h 0 0 * Including GT in reserve ISO Conditions Fuel - Natural Gas Gas Turbines 16-18 MW output applications УПРАВЛЯЮЩАЯ КОМПАНИЯ Perm Motors JSC SCPP GTES-16PA, HPS-13 Perm CJSC «Ies-Holdingг» (balancing and commissioning) MPP «Motor», Ufa Engine Industrial Association JSC GTE-18 «Ufa», Ufa Ufa Engine Industrial Association JSC (balancing and commissioning) Gas Turbines 16-18 MW output Reference УПРАВЛЯЮЩАЯ КОМПАНИЯ GT Manufacturer Perm Motors JSC MPP «Motor», Ufa Engine Industrial Association JSC Customer Location Amount Commercial Operation JSC TGC-9 HPS-13, Perm 1 balancing and commissioning ООО «Bashkirskaya Generiruyuschaya kompaniya» JSC Bashkirenego 1 shipping Total GT in operation 2 Overall operating time, h 0 Ufa Engine Industrial Association JSC Ufa 1 balancing and commissioning Total GT in operation 1 Overall operating time, h 0 Gas Turbines 20-25 MW output УПРАВЛЯЮЩАЯ КОМПАНИЯ GTP-55ST-20 Manufacturer GT Type Power Output, (MWe) LHV Efficiency, % Exhaust heat , Гкал/ч Heat Effisiency Rate, % Total GT in operation Overall operating time, h GTE 25P NK-37ST Chernyshev MMBE JSC Perm Motors JSC Kuznetsov JSC, N.D Kuznetsov STCS GTP-55SТ-20 GTE-25P NK-37ST 20 23,0 26,5 30,7 36,65 36,4 30 26,10 28,5 84,2 85 82,0 4 1 4 99 530 0 67 372 ISO Conditions Fuel - Natural Gas Gas Turbines 20-25 MW output applications УПРАВЛЯЮЩАЯ КОМПАНИЯ Chernyshev MMBE JSC GTP-55ST-20, Novopolotsk, Belarus JSC Naftan (1999) Kuznetsov JSC, N.D Kuznetsov STCS SCPP NK-900E, Samara JSC Samaraenergo (1999) Kuznetsov JSC, N.D Kuznetsov STCS SCPP NK-900E, Kazan JSC Tatenergo (2006) Perm Motors JSC SCPP GTES-25P, Ufa ООО «Bashkirskaya Generiruyuschaya kompaniya» (2009) Gas Turbines 20-25 MW output Reference УПРАВЛЯЮЩАЯ КОМПАНИЯ GT Manufacturer Chernyshev MMBE JSC Customer Location Amount Commercial Operation JSC Naftan Novopolotsk, Belarus 2 1999 Chernishev Moscow 2 Predicted startup in 2009 Total GT in operation 4 Overall operating time, h JSC Bashkirenergo Perm Motors JSC Ufa ТЭЦ-1 1 assembling Total GT in operation 1 Overall operating time, h 0 JSC Samaraenergo JSC Tatenergo Kuznetsov JSC, N.D Kuznetsov STCS 99530 JSC Grodnoenergo Total GT in operation Overall operating time, h Samara 1 1999 Kazan 2 2006 Lida 1 2008 4 67 372 Gas Turbines 110 MW output УПРАВЛЯЮЩАЯ КОМПАНИЯ GTD-110 NPO "Saturn"JSC, Saturn - Gas Turbines JSC Manufacturer GT Type Power Output, (MWe) 110 LHV Efficiency, % 35 Exhaust heat , Гкал/ч 118,7 Heat Effisiency Rate, % 78,9 Total GT in operation 53 Overall operating time, h 7 Manufacturer GTD-110 50 138 ISO Conditions Fuel - Natural Gas Gas Turbines 110 MW output applications УПРАВЛЯЮЩАЯ КОМПАНИЯ NPO "Saturn"JSC GTE-110 № 2, Komsomolsk, Ivanovo Region Testing unit for RAO UEC of Russia JSC (2001) NPO "Saturn"JSC GTE-110 № 3 и №4, Komsomolsk, Ivanovo region unit №1 Ivanovo CCPP Technopromexport JSC (2007) NPO "Saturn"JSC GTE-110 №6 и №7, Komsomolsk, Ivanovo region unit №2 Ivanovo CCPP Tecnopromexport JSC (building) Gas Turbines 110 MW output Reference УПРАВЛЯЮЩАЯ КОМПАНИЯ GT Manufacturer NPO "Saturn" JSC, Saturn - Gas Turbines JSC Customer Location Amount Commercial Operation RAO UEC of Russia JSC Kaborga, Nikolaev region, Ukraine 1 1998 RAO UEC of Russia JSC Komsomolsk, Ivanovoregion Testing unit 1 2001 Technopromexport JSC Komsomolsk, Ivanovoregion unit №1 Ivanovo CCPP 2 2007 WGS-6 JSC SDPP-24 unit №7 Novomichurinsk, Ryazan region 1 building Inter RAO UEC JSC, Ivanovskie CCPP branch Komsomolsk, Ivanovoregion unit №2 Ivanovo CCPP 2 building Total GT in operation Overall operating time, h 7 50 138 Service and support УПРАВЛЯЮЩАЯ КОМПАНИЯ А. Standard product support: • GT maintenance guidelines and advises; • GT maintenance according operation guide. B. GT power stations maintenance: • • • • GT maintenance guidelines and advises; GT maintenance according operation guide; Performance of casual works on site (on customer call): troubleshooting, unit replacement etc.; Permanent expert presence for operating stuff consultation and operating issues prompt decision . C. Long-Term full technical support: • • • • • • • GT maintenance guidelines and advises by phone 24 hours a day; Expert provision for troubleshooting, unit replacement etc.; GT maintenance according operation guide; Provision of spare parts kit for GT maintenance; GT and other machinery general maintenance; Permanent expert presence for operating stuff consultation and operating issues prompt decision ; Spare engine lease during main engine repair works.