Transcript BEB-Layout

3P Services, Germany
Basil Hostage
The missing link – inspecting the final critical section
of a large crude transmission and export system
DGMK-Vortrag 30.04.1999
• In-line inspection
• since 1992
• MFL
• world wide
• initially specialized on small diameter tools (4“ to 10“)
• today 3“ to 42“ …
Ocensa‘s offshore pipeline
Ocensa‘s offshore pipeline
Integrity assessment selected by Ocensa
Internal inspection tool capable of
Detecting corrosion and deformation
Anomalies including dents, gouges
and grooves
Necessary considerations
•
Cleaning
 Remove internally for old deposits of sands, wax and sediments.
•
Restrictions identifications
 No impacts to crude oil transport program
 No receiver trap installed
 No environmental impacts
•
Inspection metal loss with a High Resolution Tool
 Sizing and location accuracy. GPS location. Detection of anomalies
on welds
Necessary considerations
•
Identification and location of mechanical anomalies
 Identify, locate and size dents,ovality, wrinkles, deformations.
 Identify possible defects in the pipe were the intelligent tool could
be stuck.
•
Processing and analyze data
 Review the data, identify defects, prioritize and define plan to go
forward.
 Anomalies assessment according B31G and R Streng
•
Finding’s repairs .
 Data validation and repairs according with the report and priority
Inspection and cleaning technology
•
Cleaning
– Gel
– Conventional
– BiDi
•
Inspection
– Umbilical
– Conventional
– BiDi
ILI Background
•
•
•
•
•
Contacts with operators with Offshore In Line Inspection
experience
In Line inspection vendors
Risk Assessment In Line Inspection Technologies
 Technologies Assessment
Risk Assessment for Receiver Trap installation
 Facilities required, trap mobilization and installation,
environmental impacts
Risk Assessment for Operation
 Submarine valves, flow backward, use tanker storage
ILI Background
•
•
•
Risk Assessment Pigging
 Quality of cleaning, pigging alternatives evaluation,
pigging program design
Discussion about procedures, logistics and equipments
required
 Operation, transport, control center, maintenance,
environmental, Terminal and integrity.
Final Risk Assessment to define best ILI and pigging
alternative with all areas.
Selected ILI technology
•
•
•
•
•
•
Bidirectional Tool.
No required receiver trap installation.
High Resolution Tool.
High number and density of sensors, accuracy.
Classification ID/OD discrimination.
Boxing,clustering and interaction analysis.
Selected ILI technology
•
•
•
•
•
•
Metal loss correlation with mechanical anomalies.
Excellent accuracy and probability of detection.
Sizing Accuracy( Manual and Auto)
Anomalies location with (GPS)
Inspection coverage (100%)
Interpretation and assessment of data
Ocensa‘s work scope
•
•
•
•
Max preparation for cleaning
MFL, GEO and XYZ
Complete tracking and markering
Safe navigation near the PLEM
• = the full program
Project conclusion
• Issues to be covered
•
•
•
•
•
•
•
Contract
Technical planning
Logistics
Job execution
Data analysis & reporting
Verification
Very ambitious time schedule
Project conclusion
• How could this work?
– OCENSA: large pipeline operator
– 3P Services: small contractor, far away
Answers
• Careful technology analysis and decision by
OCENSA
• Contract: OCENSA respected 3P‘s specific needs
• High flexibility of 3P Services, since small
• OCENSA made systematic use of 3P‘s experience
• High professional skills of the individuals involved
Markers and antennae
Pig launcher Coveñas
BiDi cleaning pig
Launching the GEO tool
42“ MFL tool
Vertical profile of land section
Pig speed profile
Pig recorded pressure profile
• Bi-directional MFL applications
tanker
mooring
bouy
pipeline end
manifold
–Thanks for your attention