Technisches Hilfswerk OV Sinzig

Download Report

Transcript Technisches Hilfswerk OV Sinzig

Indo-German Workshop „Disaster Management“
17. Nov. 2011
Frank Schulze
www.thw.de
© Technisches Hilfswerk
Technology and fun
THW Sinzig
You‘re welcome
www.thw.de
© Technisches Hilfswerk
Technisches Hilfswerk OV Sinzig
Fascination of THW
This year THW is 61 years old. But
- 81% of the more than 80.000 volunteers are not older than 40 years,
- nearly 20% of the active helpers are between 17 – 25 years old.
- 10 % of the adults are women,
- in the youth groups (10 – 17 years) 20% are girls and
- in the Mini groups (6 – 9 years) are 25% girls.
Why do people join and stay in THW?
A poll among the members in our local section would give me always
the three arguments:
1. Enjoying technics
2. Splendid feeling, when you are able to help other people
3. And most important: the camaraderie that contributes to the
fascination with THW.
Technisches Hilfswerk OV Sinzig
Organisational
structure of the local
section Sinzig
Technisches Hilfswerk OV Sinzig
Stand: 15.06.2007
Local commissioner
Frank Schulze
Staff
Command squad
Dep. Local commissioner
Rainer Deller
Platoon leader
Oliver Gansen
Training commissioner
Patrick Tarrach
Command squad leader
Daniel Gronwald
Resp.for equipment
Torsten Geis
Voice radio operator
Birgit Deutschmann
Commissioner for PR
Jochen Tarrach
Leader youthgroup
Birgit Deutschmann
Jörg Dettmers
Admanistrative helper
Sven Ockenfels
driver
Rene Deller
1. Rescue team
2. Rescue team
Special group water dangers
Admanistrative helper
Adrian Nießen
Group leader
Michael Rönn
Group leader
Hagen Hoppe
Group leader
Rene Linden
Cook
Carsten Kley
Squad leader
Bernd Link
Squad leader
Jens Fischer
Squad leader
Adrian Niessen
Driver
Jörg Dettmers
Driver Rüdiger Schäfer
Squad leader
Sven Ockenfels
Helper
Vincenzo Fregapane
Helper
Tim Paffhausen
Driver
Michael Laß
Helper
Fabian Simanzik
Helper
Julia Rabe
Helper
Sascha Alfter
Helper
Tobias Möllmann
Helper
Bernd Crecelius
Helper
Georgia Pfleiderer
Helper
Lara Snoei
Helper
Lars Schmitt
Helper
Martin Knebel
Helper
Svenja Schnitzler
Helper
Andre LInden
Helper
Patrick Loerakker
Helper
Marcel Adam
Helper
Thomas Becker
Helper
Hans-Peter Wegener
Helper
Alexander Bildhoff
Helper
Susanne Wacht
Helper
Dirk Fokken
Technisches Hilfswerk OV Sinzig
All in all in local section Sinzig:
• 53 active helpers, 11 women (20% female)
• Youth group with 25 adolescents (40 % girls)
• More than 17.000 hours of honorary work
each year in 2009 – 2010
• 2.500 hours during operations each year
• On an average: 274 hours per helper and
year
• Pupils, students, craftsmen, employees, civil
servants and self employed
Technisches Hilfswerk OV Sinzig
The kitchen
Breakfast
Technisches Hilfswerk OV Sinzig
Technisches Hilfswerk OV Sinzig
Technisches Hilfswerk OV Sinzig
Examples of
local section
Sinzig
Basic training
Technisches Hilfswerk OV Sinzig
Basic training
Technisches Hilfswerk OV Sinzig
Basic training
Technisches Hilfswerk OV Sinzig
Basic training
Technisches Hilfswerk OV Sinzig
Basic training
Technisches Hilfswerk OV Sinzig
Basic training
Technisches Hilfswerk OV Sinzig
Specialist training
Technisches Hilfswerk OV Sinzig
Breathing protection
Technisches Hilfswerk OV Sinzig
Transport of injured persons by means of a ladder
Technisches Hilfswerk OV Sinzig
Going by boat
Technisches Hilfswerk OV Sinzig
Technisches Hilfswerk OV Sinzig
Construction of a ferry
Technisches Hilfswerk OV Sinzig
Technisches Hilfswerk OV Sinzig
Training of the
motorists
Technisches Hilfswerk OV Sinzig
Technisches Hilfswerk OV Sinzig
Technisches Hilfswerk OV Sinzig
Technisches Hilfswerk OV Sinzig
Technisches Hilfswerk OV Sinzig
Contributions on own
account at
the local section
Technisches Hilfswerk OV Sinzig
Flooding of the Rhein 1993 in Remagen-Oberwinter
Technisches Hilfswerk OV Sinzig
Technisches Hilfswerk OV Sinzig
Grinding, priming and painting of a trailer
Technisches Hilfswerk OV Sinzig
Technisches Hilfswerk OV Sinzig
Grinding, priming and painting of a trailer
Technisches Hilfswerk OV Sinzig
Grinding, priming and painting of a trailer
Technisches Hilfswerk OV Sinzig
Technisches Hilfswerk OV Sinzig
Technisches Hilfswerk OV Sinzig
Technisches Hilfswerk OV Sinzig
Selfmade lighting cross-beam for a MAN crane
Technisches Hilfswerk OV Sinzig
The Youth Group
Technisches Hilfswerk OV Sinzig
Technisches Hilfswerk OV Sinzig
Technisches Hilfswerk OV Sinzig
Competitions of youth-groups in all 16 federal states of Germany
Technisches Hilfswerk OV Sinzig
In the following year the best
youth group of each federal state
takes part in the competion for
the best youth group in Germany.
Technisches Hilfswerk OV Sinzig
youth-group of Sinzig in competition 2011
Technisches Hilfswerk OV Sinzig
Technisches Hilfswerk OV Sinzig
The bench is ready
Technisches Hilfswerk OV Sinzig
Relationships with other
organisations including
professional emergency services
providers
Technisches Hilfswerk OV Sinzig
Training with firemen 15.3. 2008
Technisches Hilfswerk OV Sinzig
Technisches Hilfswerk OV Sinzig
Technisches Hilfswerk OV Sinzig
Technisches Hilfswerk OV Sinzig
Technisches Hilfswerk OV Sinzig
Presentation of THW for federal armed forces
Technisches Hilfswerk OV Sinzig
Visitors from China – presentation of THW and fire sevice
Technisches Hilfswerk OV Sinzig
Technisches Hilfswerk OV Sinzig
Desinfektion for district Ahrweiler
Construction of 2 disinfection facilities for the district, for example in case of
Foot and mouth disease.
Technisches Hilfswerk OV Sinzig
Technisches Hilfswerk OV Sinzig
Shooting for imagefilm
Technisches Hilfswerk OV Sinzig
Truck Grand Prix - Nürburgring
Technisches Hilfswerk OV Sinzig
Concert of country music with up to 30.000 spectators: Illuminating during a blackout
Technisches Hilfswerk OV Sinzig
Juli 06: construction of a 200 meter pontoon bridge in Breisach over river Rhine
Technisches Hilfswerk OV Sinzig
The operations
Technisches Hilfswerk OV Sinzig
flooding of the Rhine
Technisches Hilfswerk OV Sinzig
Technisches Hilfswerk OV Sinzig
The team during the flooding of the river Elbe 2002
Technisches Hilfswerk OV Sinzig
Accident on the motorway with 3 deadly injured in 2002
Technisches Hilfswerk OV Sinzig
Technisches Hilfswerk OV Sinzig
2003: Whirlwind in Acht / Eifel, destroyed houses, illuminating the scenery
Technisches Hilfswerk OV Sinzig
December 2003, Gas explosion in Oberzissen
Technisches Hilfswerk OV Sinzig
Burning house, 30.03. 2008, working together firefighters and THW
Technisches Hilfswerk OV Sinzig
02.07.08 –
second
operation
with fire
service in
2008
Technisches Hilfswerk OV Sinzig
Technisches Hilfswerk OV Sinzig
Catering for more than 100 firemen
Technisches Hilfswerk OV Sinzig
12.12.08 Truck accident on Autobahn
Technisches Hilfswerk OV Sinzig
Technisches Hilfswerk OV Sinzig
Technisches Hilfswerk OV Sinzig
Technisches Hilfswerk OV Sinzig
20. september 2009 – 300 burning bales of straw
Technisches Hilfswerk OV Sinzig
Technisches Hilfswerk OV Sinzig
Wheel loader in action
Technisches Hilfswerk OV Sinzig
Technisches Hilfswerk OV Sinzig
Technisches Hilfswerk OV Sinzig
Technisches Hilfswerk OV Sinzig
THW International
Our helpers were deployed during operations in:
Burkina-Faso, Cyprus, Ethiopia, France,
Latvia, Liberia, Mauretania, Mosambique,
Russia, Tunisia, Sierra Leone, USA,
Technisches Hilfswerk OV Sinzig
19.06.08 EXPO in Zaragossa, Spain
World Expo in Spain had water as its theme
Technisches Hilfswerk OV Sinzig
THW – volunteers well known as the „water people“ and as „blue angels“
Technisches Hilfswerk OV Sinzig
New Orleans 05: THW in operation
Technisches Hilfswerk OV Sinzig
Tunisia
Technisches Hilfswerk OV Sinzig
Technisches Hilfswerk OV Sinzig
Technisches Hilfswerk OV Sinzig
Technisches Hilfswerk OV Sinzig
Technisches Hilfswerk OV Sinzig
Technisches Hilfswerk OV Sinzig
Technisches Hilfswerk OV Sinzig
Technisches Hilfswerk OV Sinzig
Technisches Hilfswerk OV Sinzig
Technisches Hilfswerk OV Sinzig
Technisches Hilfswerk OV Sinzig
Arles
Flooding in December 2003.
Technisches Hilfswerk OV Sinzig
Site investigation
Technisches Hilfswerk OV Sinzig
Using the pumps
Technisches Hilfswerk OV Sinzig
Assessment Burkina Faso 05.-18.09.09
Bonn – Ouagadougou 4317 km air-line distance
103
Technisches Hilfswerk OV Sinzig
Flooding in Burkina Faso 09. 01. 2009 – more than 150,000 people left homeless
Technisches Hilfswerk OV Sinzig
Technisches Hilfswerk OV Sinzig
5 victims, Roads, bridges and dams have been badly damaged
Technisches Hilfswerk OV Sinzig
Technisches Hilfswerk OV Sinzig
Technisches Hilfswerk OV Sinzig
Technisches Hilfswerk OV Sinzig
Technisches Hilfswerk OV Sinzig
On-Site Operations Coordination Centre (OSOCC)
Technisches Hilfswerk OV Sinzig
An electrical plant was destroyed, a water plant was flooded
Technisches Hilfswerk OV Sinzig
Investigation of faults to prepare the exchange of several destroyed motor pumps
(produced in Germany).
Technisches Hilfswerk OV Sinzig
Dr. Nana, project leader of GTZ for water supply and sanitation
Technisches Hilfswerk OV Sinzig
Water supply
Technisches Hilfswerk OV Sinzig
Typical water distribution in the suburbs: water in a mobile tun is sold
Technisches Hilfswerk OV Sinzig
Thank you for
your
attention!