Transcript Document
USJFCOM JNTC Joint Management Office Briefing to Industry Technical Management Mr. Ken Goad – Technical Director UNCLASSIFIED 10 July 2003 1 USJFCOM Technical Focus Areas Advanced Training Technology Technical Certification Global Joint Training Infrastructure Configuration Management Joint Standards and Arch Opposing Forces Technology Joint C4I Tech Development and Integration Joint Live Joint Info / Knowledge Instrumentation Virtual Mgmt Data Collection Constructive AAR Environment Existing & Planned Service, COCOM & JFCOM Capabilities UNCLASSIFIED 10 July 2003 2 USJFCOM Think Big, Start Small, Evolve Begin with the end in mind… Build a strong foundation… Move fast and smart. 1 Event and Enhancement Focused 3 Evolve Think Big JNTC 2B Training Systems Architecture Spiral Development Interoperability and Re-use 2 Start Small JNTC Prototype Time UNCLASSIFIED 10 July 2003 3 USJFCOM JNTC Common Architecture Requirements Plan Execute Organizational Relationships Assess Node-to-Node OV-4 OV-2 OV-3 Activity Model OV-5 OV-1 Information Exchange Requirements System View Technical View Operational Concept SV-2 Systems Communications System Interface Diagram SV-1 SV-5 Operational Activity/ System Function Matrix SV-3 SV-4 System FunctionOperational Activity Implementation View • Planning Tools • Collaborative Info Env • Scenarios • Scenario Generation UNCLASSIFIED • Comms/Networks • Models • Terrain DB • Scenario Database • AAR • Data Collection • Analysis • Info/KM Systems Matrix; Report: System - System • Interfaces • Object Model • FOMs/RTI • Tool Sets/Aids Joint Training Environment 10 July 2003 4 USJFCOM Neighbor Architectures, Guidance, & Processes JNTC Program Execution Plan JNTC Implementation Plan Service & Coalition Training Architectures JDEP DCEE PLAN ~ EXECUTE ~ ASSESS ~READINESS MANAGEMENT Live Assets & Interagency Ranges Joint Training And Assessment Capability ITDC Architectures DoD Transformation Planning Guidance UNCLASSIFIED Training Transformation (T2) Implementation Plan USJFCOM Unified Command Plan 02 Improved Combatant Commander Readiness Defense Planning Guidance FY04-09 10 July 2003 5 USJFCOM Joint C4I C4 Concept of Operations Network Security Plan JC4I Standards Persistent WAN Roadmap For JNTC Network Connectivity Site JC4I Enhancements Existing DoD WANS Global Information Grid – Bandwidth Exp Network Requirements Document Identify and Implement JC4I Capabilities that will Enable Joint, Distributed Training Across DoD Sites, Simulation Centers, Service and Combatant Command Training Events UNCLASSIFIED 10 July 2003 6 USJFCOM LVC Development Strategy Discussion: Need is for a cost effective and realistic LVC that supports current / future forces and doctrine from tactical to strategic. Seamless environment across LVC. Current Service / Joint LVC capabilities and initiatives (e.g., USN/USAF DMT, JSB/DMO). Current DoD, Service and Joint M&S standards. Operational requirements and exercise design are primary drivers in deriving technical requirements and solutions. Development of Joint synthetic environment (LVC) in support of training and experimentation Way Ahead: • Capture Joint Op Requirements. – Training Exercise Design (LVC interaction matrix). – JTT Operational Architectures. – Experimentation requirements. • Capture existing / planned capabilities. • Map capabilities to operational requirements. UNCLASSIFIED • Gap analysis -> new developments. • Define / deploy Joint Standards & Architectures. • Certification criteria. • Refine prototyping insertion/experimentation into training and exercises • Develop overall LVC roadmap based on Joint / Service M&S strategies. • Develop interoperable building blocks. 10 July 2003 7 USJFCOM Joint Instrumentation, Data Collection & AAR Relocatable, Interoperable, and Integrated Instrumentation To Support Joint Training Objectives Mechanism to bring Live to an Integrated L-V-C Environment Enable Data Collection and Assessment of Joint Tactical Task Execution Provide Training Audience Feedback for Lessons Learned Provide Live Range Ground Truth For Exercise Control Capabilities Provided Instrumentation UNCLASSIFIED Data Collection Analysis 10 July 2003 8 USJFCOM Technology Highlights 1. Communications requirements completed. 2. Developed and evaluated west coast site plans, including analysis of cost alternatives. 3. Purchased ($1.5M) and configured initial network equipment. 4. Developed M&S Interface Architecture to Service component C4I systems, e.g. TBMCS, Army Battle Command Systems (ABCS, GCCS-A, etc.), USMC IOS, etc. 5. Provided plan for implementation of Global Command and Control Center (GCCC) monitoring and control of JNTC C4 networks. 6. Successfully integrated the MC 02 federation at current software levels for use Thrust 1 event. 7. Completed West Coast Range terrain refinement for Ft. Irwin and 29 Palms area (DTED 2 vice DTED 0). 8. Conducted preliminary planning to integrate Virtual Flag / TACCSF into simulation federation. 9. Collaborative Information Environment requirements survey completed. UNCLASSIFIED 10 July 2003 9