Operational deficit
Preservation and Maintenance
Capital needs
Key Facts About DOT
1,605 permanent employees (FY14) – 22% steady decrease since 1992
Responsible for:
• 2,143 State Bridges
• State Red List – 140 (7%)
• State Near Red List – 261
• 1,685 Municipal Bridges
• Municipal Red List – 353 (21%)
• All bridges are inspected at least once every two years
• State red list bridges are inspected twice every year
• Municipal red list bridges are inspected once every year
• 4,559 centerline miles of roadway maintained (additional 290 town
maintained)
• 8,868 lane-miles of roadway maintained
• Annual paving totals 200-300 miles per year (40,000 tons asphalt)
• Maintain 100,000 highway signs
51
DOT FUNDING SOURCES
• Highway Fund (road toll tax a.k.a. gas tax, motor
vehicle fees, court fees, misc.) $260 m/ year)
• -$48 m deficit FY16, -$105 m FY17
Operating Budget
• Federal Aid ($143 m/year) – Capital Budget
• General Funds: Aeronautics, Rail, Transit
($900,000/year)
• Turnpike Fund: Turnpikes only (subject to
covenants to bondholders): $117m/year tolls
One-time Non-Sustainable Operating
Funding
• FY 06-07
Surplus from Highway Fund
• FY 08-09
Bonding $60m
• FY 10-11
Registration Surcharge $90m
I-95 Transfer $50m
• FY 12-13
I-95 Transfer $52m
• FY 14 -15
I-95 Transfer $ 30m
• FY 16 -17
Deficit -$48m & - $105m
15
NHDOT Positions VS DVMT & Lane Miles
30000
1950
25000
20000
1850
1800
15000
1750
10000
1700
5000
1650
20
12
20
10
20
08
20
06
20
04
20
02
20
00
19
98
19
96
0
19
94
1600
19
92
# of Positions
1900
Years
57% of Staff eligible for retirement in next 5 years
Daily Vehicle Miles Travel (DVMT) &
Lane Miles
2000
VMT 29% increase
11% increase lane miles
20% less # positions
# of Positions
Lane Miles
DVMT
Linear (DVMT)
Economic Impact of Maintenance
• 40% expenditures Highway Maintenance are expended
solely for Snow & Ice control yearly
$32-$42 million/year FY 2012 = $32 million
• Studies have shown that if a state was to “shut down”
due to a Snow and & Ice event, economic impacts could
be between $64 million (UT) and $700 million (NY)
DAILY. Massachusetts had an estimated daily loss of
$265 million
(2011 American Highway Users Alliance study)
Average Price of Asphalt Cement
1992 to 2012
 The cost of asphalt cement increased 460% over this
period
 Diesel, gasoline, road salt increases…..
Statewide Pavement Condition
(4,559 total centerline miles 299 unrated)






19 % good condition - 828 miles
44 % fair condition - 1,867 miles
37 % poor condition - 1,565 miles
$615 million would be needed to bring all poor
condition pavements to good condition (not
including drainage, guard rail & bridges)
$3.7 billion is the estimated total value of the
state-owned pavements
Pavements are the State’s most valuable asset
other than land and bridges
Pavement Conditions
2000
2010
Red = Poor Condition
Limited Resources
Must Manage & Prioritize
1st priority – NH National Highway System (includes all
high volume and primary routes); needed for healthy
economy and mobility
2nd priority – Remaining US Routes and State
Numbered Routes; maintained at a less than desirable
level
3rd priority - State Unnumbered Routes; not being
properly maintained due to lack of funding
Capital Needs
• Many More needs than resources
– Ten Year Plan Feedback
• Prioritization and Balance
• Alternative modes of transportation
• Municipal Needs
Capital Needs
• Regional Priorities to fund:
– New Hampton/Meredith – NH 104
– Bristol – NH 104
– Meredith – NH 25
– I-93 Exit 19
– Alton-Gilford NH 11