Transcript No Slide Title
Amphibious Construction Battalion Two
The Final Link in the Sealift Chain
Maritime Prepositioning Force Joint Logistics Over The Shore (JLOTS)
BENIGN
CMPF
Chain of Command
CINCLANTFLT COMNAVSURFLANT COMPHIBGRUTWO ACB-2 COMNAVBCHGRUTWO BMU-2 ACU-2 ACU-4
Mission Areas • Causeway Ferry • Roll On/Roll Off Discharge Facility (RRDF) • Amphibious Assault Bulk Fuel/Water System (AABFS/AABWS) • Offshore Petroleum Discharge System (OPDS) • Elevated Causeway, Modular (ELCAS-M) • Defensive Military Operations • Camp Support
Barge Ferry System • • •
Side Loadable Warping Tug (SLWT) Causeway Section Powered (CSP) Causeway Section Non Powered (CNSP)
MPS-1 Lighterage • 4 SLWTs • 16 CSPs • 14 Intermediates • 16 Beach Ends • 8 LCM-8s • For Dynamic Mix: Instream: 8 rolling stock/hour Pierside: 20/hour.
Roll On/Roll Off Discharge Facility (RRDF)
Amphibious Assault Bulk Fuel/Water System • 5,000 ft of 6” conduit (Fuel) • 10,000 ft of 4” conduit (Water) • Deploy from Barge Ferry or LCU • Install in 8 hours • 700Kgal/day
Offshore Petroleum Discharge System (OPDS) • Single Product 4 NM • Dual Product 2 NM • 1.2 Mgal/day • First Fuel in 48 hrs.
• Total install in 7 days • Water Depth 35-200 ft.
• Service Life 2 yrs.
Lighterage support w/ OPDS • SLWT Lighterage support: • 3 tow tugs • Converted lay repair barge 1 SLWT • Dive boat - LCM 8 • OUB Lighterage support: • 3 tow tugs - OUBs • Converted lay repair barge 1 OUB • Dive boat - OUB
Elevated Causeway-Modular
- Up to 3000 ft length - 20 FSW at MLW - 7 Days to Erect - UCT Site Survey
Defensive Military Operations
Camp Support • Berthing Tents • Galley/Scullery • Laundry • Showers/Heads • Transportation • Beach Salvage • Water Purification • Medical/Admin