Transcript PROJECT DESIGN DOCUMENT FORM (CDM‑SSC

Carbon Markets – CDM project development, 8. August 2011
Jørgen Fenhann
PDD Development
Small-scale CDM
PROJECT DESIGN DOCUMENT FORM (CDM-SSC-PDD)
VERSION 03 - IN EFFECT AS OF: 22 DECEMBER 2006
CONTENTS
A.
General description of the small scale project activity
B.
Application of a baseline and monitoring methodology
C.
Duration of the project activity / crediting period
D.
Environmental impacts
E.
Stakeholders’ comments
Annexes
Annex 1: Contact information on participants in the proposed
small scale project activity
Annex 2: Information regarding public funding
Annex 3: Baseline information
Annex 4: Monitoring Information
SECTION A. General description of small-scale project activity
A.1.
A.2.
Title of the small-scale project activity:
Chilinga Mini Hydro Project
Description of the small-scale project activity:
- Background, Purpose (tco2 eq displaced over project life time i.e.
generating CERs, General description (installed capacity, projected annual
average eneration(GWh), main component of h.e.p. plant etc) & SD
A.3.
A.4.
Project participants: (Project developer - Chilinga Mini Hydro Co.)
Technical description of the small-scale project activity:
Luangwa River
Chilinga catchment area
Canal
Dam wall
Penstock
Power
House
Chilinga River
A.4.1.4.Details of physical location, including information allowing
the unique identification of this small-scale project activity
A.4.3.Estimated amount of emission reductions over
the chosen crediting period:
•
•
•
A.4.2. Type and category(ies) and
technology/measure of the smallscale project activity:
Type I – Renewable Energy
Projects
Category I.D. – Grid
connected renewable electricity
generation
A.4.3. Estimated amount of
emission reductions over the
chosen crediting period:
No
Yrs
Electricity Estimation of annual
generated emission reductions in
(KWh)
tonnes of CO2e
1
2012
1,439,880 1152
2
2013 2,167,665 1734
3
2014 2,900,791 2321
4
2015 3,063,168 2451
5
2016 ……
…..
6
2017 …….
…..
7
2018 ……
…..
8
2019 ……
……
9
2020 …….
….
10
2021 4,277,477 3422
Total
25587
Further required details – ”to mesmerise you”
•
•
A.4.4. Public funding of the small-scale project activity: (No FDI funding)
A.4.5. Confirmation that the small-scale project activity is not a debundled
component of a large scale project activity:
•
SECTION B.
Application of a baseline and monitoring methodology
- B.1.Title and reference of the approved baseline and monitoring methodology
applied to the small-scale project activity:
- TYPE I – Renewable Energy Project. AMS-I.D. – Grid connected renewable
electricity generation (V. 13), EB 36 (December 2007).
- The AMS-I.D. methodology also refers to the "Tool to calculate the emission
factor for an electricity system" (version 01.1) for the calculation of the baseline
emissions.
- B.5. Description of how the anthropogenic emissions of GHG by sources are
reduced below those that would have occurred in the absence of the registered
small-scale CDM project activity: (Additionality – investment, technical barriers;
financial analysis etc)
- B.6.
Emission reductions: B.6.1. Explanation of methodological choices:
The emission reduction ERy by the project activity during a given year y is the difference
between baseline emissions (BEy), project emissions (PEy) and emissions due to leakage
(Ly).
ERy = BEy – PEy – Ly
B.2.
Justification of the choice of the project category:
• The Project’s nominal installed capacity is 1.0 MW, which will not
increase beyond 15 MW over time. Therefore, the Project will comply
with CDM rules for small-scale project activities every year over its
10-year crediting period.
B.3. Description of the project boundary:
The project boundary, defined in Appendix B of the Simplified
Modalities and Procedures, encompasses the physical, geographical
site of the renewable generation source.
B.4.Description of baseline and its development:
The Project will generate electricity without emitting GHGs and
supply it to a regional isolated grid, displacing fossil fuel based
electricity generation that would otherwise be supplied to this region.
B.6.2.
Data and parameters that are available at validation:
• Data / Parameter EFgrid,y: (Tonne of CO2e/MWh ): The emission factor for
the diesel generator system providing electricity within the baseline project
boundary
• Data / Parameter:EGy (MWh) - Net electricity supplied to the grid by
•
•
•
•
the project
B.6.3. Ex-ante calculation of emission reductions:
B.6.4. Summary of the ex-ante estimation of emission reductions:
B.7. Application of a monitoring methodology and description of the
monitoring plan: - B.7.1.Data and parameters monitored:
B.7.2. Description of the monitoring plan:
B.8. Date of completion of the application of the baseline and monitoring
methodology and the name of the responsible person(s)/entity(ies)
SECTION C: Duration of the project activity / crediting period:
Starting date, Expected operational lifetime (30yrs); Choice of the crediting period
and related information; etc etc
SECTION D:
Environmental impacts:
SECTION E:
Stakeholders’ comments: