Transcript Slide 1
Welcome to Timberlake Presented by Charles (Charley) F. Hurt, P.E. Charles (Chuck) K. Hurt, P.E. April 19, 2004 The Headforemost Co. Acknowledgements & Thanks Consultant Engineers 408 St. Andrews Circle Lynchburg, VA 24503 (434) 384-0710 Charles Falwell, Falwell Well Corp. The News & Daily Advance Hurt & Proffitt, Inc. Designed by: Betty Anne Hurt History • • • • Timberlake “the gem of the Piedmont” 70 acres of lake and golf course Developed in the fall of 1926 Developers – The Timberlake Corp. – Edley Craighill, Engineer – F. L. Showalter, Contractor • • • • • The Dam was designed for the 100-year flood The Timberlake Corp. took bankruptcy in 1930 The Peaksview Corp. bought the property in 1945 The water system was given to CCUSA in 1970 The Homeowners Assn. (HOA) was set up in 1986 and continued until 1990 TIMBERLAKE As it was… Sailing Across the Water June 22, 1995 • Century’s hardest recorded Rainfall • 9” in 4 to 5 hours DAM FAILURE Break in Dam Break in Dam Southside of Road Over Dam Lake Bed After Dam Break Principle Spillway Boat Caught in Principle Spillway Looking Downstream Thru the Dam Break Reconstruction of Timberlake • An emergency meeting of the Board of Directors of the HOA was called – Reconstruction Committee Charlie Falwell, Chair – Restoration Fund Bud Colbert, Chair – Licensing and Permits George Shrader, Chair – Land Assessments Shaeffer Oglesby Rebuild Dam • HOA hired Hurt & Proffitt on July11,1995, to design the reconstruction of Timberlake • Bid opening for Dam repairs - May 23, 1996 • Construction by Counts & Dobyns began on June 2, 1996 • Clay core material was found on adjoining property of Bobby Montgomery • Hurricane Fran brought heavy rains half-way through the construction • Dam completed November 1, 1996 • Refilling of Lake on February 17, 1997 • Easter Sunday 1997, after 40 days and 40 nights FULL LAKE water flowed thru the primary spillway Creek thru Timberlake Lake Bed a Year Later 1996 Dredging Silt From Lake Bottom 1996 Construction of New Dam June 1996 Cutting a Keyway to the Dam Installation of Lake Drain Valve Inspection of Drain Outlet by Hurt & Proffitt Dam 50% Complete Cut in Dam Prior to Storm Fran’s Rains Fran Fills the Lake Beginning of Repairs Due to Fran Repairs to Cut Made for Fran Construction of Emergency Spillway • 200 ft. wide by 4.5 ft. deep Dam Completion November 1, 1996 Dedication of Dam June 21, 1997 Memorial Timberlake Again Good Bye from Timberlake Presented by Charles (Charley) F. Hurt, P.E. Charles (Chuck) K. Hurt, P.E. The Headforemost Co. Acknowledgements & Thanks Consultant Engineers 408 St. Andrews Circle Lynchburg, VA 24503 (434) 384-0710 Charles Falwell, Falwell Well Corp. The News & Daily Advance Hurt & Proffitt, Inc. Designed by: Betty Anne Hurt