Transcript Slide 1
Summary of 3
rd
CDF B Mixing Workshop
Outline: 1. Reminder of Ingredients 2. Summary of Progress 3. Schedule of Tasks Joseph Kroll (Penn) & Franco Bedeschi (Pisa) Mixing Analysis Coordinators B Meeting 14 October 2004
14 October 2004 Kroll/Bedeschi B Meeting
Fort Ebey, Whidbey Island, WA, in the Puget Sound 90 miles from the Pacific
1
B
s
Mixing Ingredients
From B Meeting 9/16/04
• • • • •
Reconstruct B s signal with adequate signal to noise
– semileptonic: lepton + D s – hadronic: D s , D s also have the equivalent B 0 & B + signals
Measure B s Lifetime
calibration/check is B 0 – resolve lifetime problem in semileptonics & B + lifetimes – demonstrate lifetime measurement in SVT-biased hadronics
Identify B s Flavor at production (flavor tagging)
– challenge: estimating D for SST in B s (for limit)
Demonstrate technique with B 0 mixing (
m d )
– use this step to calibrate opposite side flavor tags for B s – require unbinned likelihood fit now
Measure (place limit on)
m s
14 October 2004 Kroll/Bedeschi B Meeting 2
14 Oct 2004 Our Priorities
Highest Priority Items
From B Meeting 9/16/04 remain the same 1. Unbinned likelihood fit for
m d exploiting fully power of flavor tags, event by event
t , S/B in different modes, etc.
to accomplish 1. we must 2. Resolve lifetime problem in semileptonic modes (l D s ) 3. Measure lifetime in SVT-biased hadronic modes (D s
, etc.) in parallel with 1, 2, 3 4. Study SSKT – determine defensible D from data and MC
14 October 2004 Kroll/Bedeschi B Meeting 3
1 st Street Ocean City, NJ, Feb. 7 2004
Summary of Progress: Signals & Data Sets
• •
Signals – source of concern
– modest progress (B s !
D s , D s !
& B !
D ) – power of tracking in 5.3.1 has not been fully exploited •
e.g.,
2 3D , event by event PV, L00 • see M.D. Shapiro @ BPAK on 8 Oct 2004 – still only data up to 13 Feb 2004 – no post COT recovery data
Data Sets – source of significant concern
– B hadronic skim • only 70% complete up to 13 Feb 2004 • no post COT recovery data available – B Sntuples • need to be remade with new OSTs and other improvements (
e.g.,
• future improvements cannot be exploited – must remake – Many other private data sets and ntuples PID) 14 October 2004 Kroll/Bedeschi B Meeting 4
Summary of Progress: Lifetimes (1)
•
Semileptonic Lifetimes
– dedicated core of people: Clark, Farrington, Tanaka, Ukegawa, Uozumi – set up list of tasks on 8 September 2004 – already covered significant fraction of those tasks – continued steady progress since the workshop –
still have not found the problem
– direct charm background appears to have been eliminated as a candidate – SVT efficiency bias? Background model? Combination of two?
14 October 2004 Kroll/Bedeschi B Meeting 5
Summary of Progress: Lifetimes (2)
• •
Hadronic Lifetimes – “Monte Carlo free” approach
– have overcome many technical obstacles to produce viable method – limited progress, however, since last presentation in July 2004 – Dedicated group of people now back in action: Azfar, Boudreau, Huffman, Rademacher, Rahaman – clearly defined tasks within this group – schedule defined –
Do we get the right answer? Is this approach viable for mixing?
Hadronic Lifetimes – SVT efficiency approach
– limited progress since last presentation in July 2004 – Dedicated group of people being assembled at FNAL to attack: DaRonco, Donega, Giagu, Giolo (Lucchesi @ Padova) – need to define a more detailed list of tasks and schedule –
Same burning issue: do we get the right answer in B + , B 0 ?
14 October 2004 Kroll/Bedeschi B Meeting 6
Summary of Progress: Flavor Tagging
• •
OSTs
– OSTs defined (SLT(e), SLT( ), JQT) – in repository –
next step clear: define combined OST & measure
D 2 in data
– no further development expected for Winter 2005
SS(K)T
– ambitious plan outlined to estimating D from combo. of data & MC – dedicated group: see list in later slides under “schedule.” – progress on several fronts & short term goals defined: • particle id around B mesons measured in data • comparison: fragmentation particles around B’s in data vs. MC • establish B ** signal – at least at PR level –
Particle id crucial – TOF calibration a concern shape , dE/dx in good
14 October 2004 Kroll/Bedeschi B Meeting 7
Summary of Progress: Likelihood Fits
•
Two groups working independently
–
MIT/Cantabria/Karlsruhe
• presented likelihood fit with SST on J/ K *0 • ambitious program to extend to
l
+ D and B !
data D • next step: add OSTs and measure combined D 2 , D (with D bins) • lifetime is necessary intermediate step –
ANL/CMU
• full likelihood fit exists for \Delta m_s (see CDFNOTE 7170) • extending to m d on l + D (sample composition, implement OSTs) • Basic functionality of fit demonstrated with toy MC • next steps: signal optimization, add OSTs, evt-by-evt vtx, L00 • lifetime is necessary intermediate step 14 October 2004 Kroll/Bedeschi B Meeting 8
Summary of Progress:
m
s
• •
One presentation specific to
m s : proposal for blinding
– preferred option: randomize B s flavor at decay with (-1) event no.
– need to follow up with written proposal that is approved at B meeting
Discussion of need for common input file for various fitters
– need to follow up with written proposal that is approved at B meeting – seems trivial, but will serve as a method of making sure we are speaking a common language 14 October 2004 Kroll/Bedeschi B Meeting 9
Schedule
• • •
We have put together a list of tasks Each task has
– list of people doing the work • these people are considered “responsible” for delivering – the venue where they report the results of their work • specify the subgroup or B group – the various near term tasks including time estimates – long term tasks have more vague time estimates
Weekly status reports
–
we want status reports at subgroups on key tasks every week
– does not have to be full presentation, can be one slide on previous week’s activities 14 October 2004 Kroll/Bedeschi B Meeting 10
Data Sets
• • •
Data set definition
– 5.3.X
– all data up to August 2004 shutdown
except
COT compromised
Good run list
– Furic & Nahn – reports at BPAK – by 4 November 2004
Skim of SVT two track data set
– Belforte, Casarsa, Delli, Fella, Lucchesi – reports at BPAK – 2 sections of the data • up to 13 February 2004 • after COT recovery •
Skim (continued)
– Status of data up to 13 Feb 2004 • B s !
D s , D s !
K*K or K S K complete • finish other 7 modes by 4 Nov 2004 • B !
+ D 0 , D0 !
K + , K + + , K + K , • B 0 !
• B 0 s !
D + , D !
D s + , D s !
K + + , – post COT recovery data • processing in parallel with above • complete by end of November 2004 – Some modes not included •
e.g.,
B !
D * & D • can be added – no time estimate 14 October 2004 Kroll/Bedeschi B Meeting 11
Data Sets (continued)
• •
B Sntuple
– Paus – reports at BPAK – based on 5.3.1
– includes all modes – will include all data to Aug 2004 – J/ K by 18 Oct 2004 – lepton + D by 26 Oct 2004 – B hadronic by 8 Nov 2004
Direct access to data (datlists)
– Furic & Paus – reports at BPAK – available 1 Dec 2004 14 October 2004 Kroll/Bedeschi B Meeting •
Comments
– must do better for Summer 05 & beyond • need to start organizing this now • volunteer (BPAK) needed – for Winter 2004 success of datlists is critical – B sntuple • no update of TOF possible • event by event PV, L00 not included in present production – 1 Oct 2004: Ch. Paus reports 30 pb -1 data bad due to CMX – use anyway?
12
Signal Optimization
• •
Hadronic modes
– Casarsa, Lucchesi, Squillacioti, Shapiro – reports at B Hadronic – complete by 4 Nov 2004
Semileptonic modes
– Gibson – reports at Semileptonics – update on 26 Oct 2004 – schedule for finalizing not established
Concern: inadequate personnel and coming too late
14 October 2004 Kroll/Bedeschi B Meeting 13
Lifetimes
•
Semileptonic
– Clark, Farrington, Tanaka, Ukegawa, Uozumi – reports at Semileptonics – near term (by 4 Nov 2004 ) • Tanaka x-check of
l
+ D + • d 0 cut on D * (D + , D 0 too?) • generate more c-cbar MC • result in 8 GeV (no SVT) – long term ( no estimate ) • have to see results of near term to decide how to proceed 14 October 2004 • •
Hadronic “MC free” approach
– Azfar, Boudreau, Huffman, Rademacher, Rahaman – reports at B hadronic – fitting test and refinement • Azfar, Rademacher • B + !
D 0 + in progress – stripping & ntuple production (data & MC) • Azfar, Rahaman • B + !
D 0 + done • B 0 , B s , & b modes in progress • complete by 4 Nov 2004 Kroll/Bedeschi B Meeting 14
Lifetimes (continued)
•
Hadronic “MC free” continued
– Systematics • alignment (Boudreau, Rahaman) • SVT eff. (Azfar, Rademacher) • background parameterization (Huffman, Rademacher) • all in progress already for B + mode – done by 4 Nov 2004 • others follow later •
Hadronic – SVT eff. method
– Da Ronco, Donega, Giagu, Giolo, Lucchesi – update SVT curves by 4 Nov 2004 – preliminary result (lifetime
okay
or
not okay
) by 22 Nov 2004 14 October 2004 Kroll/Bedeschi B Meeting 15
Opposite Side Flavor Tags
• •
Validation of blessed Summer 2004 SLT(
), SLT(e), JQT
– Kravchenko – reports at Semileptonics – means putting taggers in repository & verifying we get the same results – complete by 19 Oct 2004
Creation of simple combination of above tags
– Kravchenko – reports at Semileptonics – determine tag overlaps and combined D 2 (including binning) on J/ K • report on 19 Oct 2004 – evaluation of more sophisticated combinations (max D, diff. classes) • time scale not established 14 October 2004 Kroll/Bedeschi B Meeting 16
Same Side (Kaon) Tag
• •
Further development of SS(K)T
– Bedeschi, Catastini, Punzi, Scuri, Squillacioti – reports to Semileptonics – compare SS(K)T algorithms in data & MC using J/ • use combined dE/dx & TOF particle ID • report by 4 Nov 2004 K samples
Study particle species produced around B + , B 0 , B 0 s
– Heijboer, Jones, Kroll, Usynin – reports to Semileptonics – Measure particle species in data • initial report using private TOF calibration in July 2004 • further progress requires updated TOF calibration and B Sntuples – MC production in parallel – estimate Dec 2004 14 October 2004 Kroll/Bedeschi B Meeting 17
Same Side Kaon Tag (continued)
• •
Comparison MC & data, tuning fragmentation
– Ben-Haim, Maksimovic, Pursley – reports to Monte Carlo & Semileptonics – update on 4 Nov 2004
B **
– Ben-Haim, Maksimovic, Pursley – reports to J/ & B hadronics – signal in B + !
J/ K + (update 4 Nov 2004 ) – signal in SVT hadronic samples ( December?
) 14 October 2004 Kroll/Bedeschi B Meeting 18
Likelihood Fitting for
m
d
•
MIT/Cantabria/Karlsruhe
– Belloni, Gomez-Ceballos, Kravchenko, Leonardo, Paus, Piedra – reports to Semileptonics – likelihood fit B !
J/ K with SST exists – see last workshop – need to add OSTs – developing fits for
l
+ D & D , D3 – Fully tested with preliminary result on m d by 1 Dec 2004 14 October 2004 •
Argonne/CMU
– Giurgiu, Paulini, Tanaka – reports to Semileptonics – full likelihood for m s exists; used for ICHEP 04 projections – developing for m d w
l
+ D incorporating blessed OSTs • 1 st version fit working and tested on toy MC – see last workshop • working on including tagging & vertexing in data ntuple – report at 4 Nov 2004 • run on MC to determine add. K factors: 30 Nov 2004 • 1 st result on m d by 7 Dec 2004 Kroll/Bedeschi B Meeting 19
Result on
m
s
• Difficult to work this far ahead – we can work backwards from La Thuile & draw some conclusions: – 24 Feb 2005 last day to bless results for La Thuile – 17 Feb 2005 – 03 Feb 2005 – 20 Jan 2005 – 06 Jan 2005 unblind results on m s prebless results on m s bless results on m d for m s prebless results on m d for (Collaboration mtg.) m s • Better have full likelihood machinery for m d determination using hadronic and semileptonic samples and OSTs
before
the Winter holiday – this includes a substantial amount of documentation prepared .
14 October 2004 Kroll/Bedeschi B Meeting 20
In Preparation for
m
s
• •
Decision on blinding procedure
– Punzi – reports to B meeting – written proposal submitted to B group before 4 Nov 2004 – present at workshop on 4 Nov 2004, sign off at following B meeting
Quantities for input to likelihood fit (flat file content)
– Kravchenko & Tanaka – reports to semileptonics – written proposal submitted to B group before 4 Nov 2004 – present at workshop on 4 Nov 2004 14 October 2004 Kroll/Bedeschi B Meeting 21
Common Tools
• •
dE/dx in COT
– COT dE/dx group (Giagu) – reports to BPAK group – validation of entire data set up to Aug 2004 shutdown in progress – ready for 5.3.4 release on 29 Oct 2004
TOF
– TOF group (Snider) – reports to BPAK group – in process of revising/validating calibration schemes – hope to be ready for 5.3.4 release on 29 Oct 2004 14 October 2004 Kroll/Bedeschi B Meeting 22
Common Tools (continued)
•
Combined dE/dx & TOF PID
– Ciocci, Morello, Punzi, Squillacioti, Tonelli – reports to BPAK – available now in private version: resolution functions for each particle type separately for dE/dx & TOF – include in public code infrastructure by 18 Oct 2004 – validate – include in 5.3.4 release on 29 Oct 2004 – include combination of TOF and dE/dx for 29 Oct 2004 release – demonstrate utility with examples by 4 Nov 2004 •
Event by Event Vertexing incl. L00
– Cerri, Lucchesi, Shapiro – reports to BPAK – code available & will be in 5.3.4 rel.
– documentation by 4 Nov 2004 14 October 2004 Kroll/Bedeschi B Meeting 23
Monte Carlo Production
•
Oversight of Monte Carlo Generation/Production
– D’Auria – reports to Monte Carlo – outstanding issues • existing MC samples produced by various groups privately not registered • only aware of one collaborative effort to generate MC for semileptonics – see talk by Usynin at semileptonics subgroup on 28 Sep 2004 14 October 2004 Kroll/Bedeschi B Meeting 24
Some Concluding Remarks
• We have made progress assigning tasks and making a schedule • The schedule needs to be studied further to see if we are on target to have a result for Winter 2005 • Particular concern is Dec 2004 – how do we go from 1 st on m d to documented blessed results by early Jan 2005?
results • Two more workshops planned in 2004 – November 3 & 4 • off week – we thought it would help to spread the pain over 2 days – December 16 14 October 2004 Kroll/Bedeschi B Meeting 25
Calendar
on week
Gasp! now we are here!
proposed B mixing workshop Collaboration meeting last Thursday meeting holiday
Better get back to work
14 October 2004 Kroll/Bedeschi B Meeting
La Thuile begins here
26