Transcript Slide 1
DS3 Programme Status Update JGCRP 12/11/2014 Robbie Aherne DS3 – Shaping the System of the Future Grid Code Performance Monitoring DSM System Services Frequency Voltage Renewable Data ROCOF WSAT Control Centre Tools Model Dev. & Studies DS3 - Changing DS3 Areas System Performance System Policies System Tools 2011 2013 2015 2017 2019 DS3 - Changing DS3 Areas System Performance System Policies System Tools 2011 2013 2015 2017 2019 System Performance Grid Code Performance Monitoring DSM System Services ROCOF RoCoF • CER decision paper April 2014 • UR decision paper May 2014 Generator Studies Project TSO-DSO Implementation Project Alternative Solutions Project Generator Categorisation Category 1- High Priority Run hours (existing/forecast) Constrained-on Priority dispatch Ireland Units Station Unit ID Capacity Owner (MW) Station Unit ID Capacity Owner (MW) Kilroot K1 K2 B10 B31 B32 C30 Turlough Hill TH1 TH2 TH3 TH4 MP1 MP2 MP3 SK3 SK4 PBC AD2 WG1 ED1 IW1 73 73 73 73 285 285 285 81 81 463 431 444 118 15 ESB ESB ESB ESB ESB ESB ESB AAL AAL ESB ESB Centrica EPL Indaver HNC HN2 DB1 TYC AD1 337 395 399 384 258 Viridian Viridian SynerGen TPL ESB 18 mths Ballylumford • TSOs’ assessment of prioritisation based on: – – – Northern Ireland Units Coolkeeragh 194 194 97 245 245 402 AES AES AES AES AES ESB Moneypoint Sealrock Poolbeg CCGT Aghada CCGT Whitegate CCGT Edenderry Meath W2E 2- Mid Priority (UR decision does not reference a 24 month period) Huntstown 24 mths • Generator Capability studies to begin shortly Dublin Bay Tynagh Aghada 3 - Low Priority 36 mths 4 - Exempted Ballylumford AES AES AES AES AES Kilroot AES AES AES AES Coolkeeragh ESB AGU* Contour Global AGU* iPower AGU* EmPower *Further consideration required for AGUs connected at and below 33kV. Edenderry OCGTs ED3 ED5 Tawnaghmore TP1 TP3 Rhode RP1 RP2 Aghada OCGTs AT1 AT2 AT4 Tarbert TB1 TB2 TB3 TB4 Lough Ree LR4 West Offaly WO4 Ardnacrusha AA1-4 Erne ER1-4 Lee LE1-3 Liffey LI1,2,4,5 Marina MRC North Wall NW5 58 58 52 52 52 52 90 90 90 54 54 241 243 91 137 86 65 27 38 88 104 EPL EPL SSE SSE SSE SSE ESB ESB ESB SSE SSE SSE SSE ESB ESB ESB ESB ESB ESB ESB ESB (None) Great Island GI1 GI2 GI3 54 49 109 SSE SSE SSE (None) Great Island CCGT GI4 431 (Closing) 5 - New (Currently undergoing compliance assessment) BST4 BST5 BST6 BGT1 BGT2 KTG1 KTG2 KTG3 KTG4 CTG8 170 170 170 58 58 29 29 42 42 53 12 74 7 SSE Alternative Solutions Project • Joint project by TSOs • Communication with industry via DS3 Advisory Council and website Phase 1 (5 months) • Range of theoretical options assessed at a high level via weighted scoring matrix approach • Subset of viable options (2 to 3) selected for Phase 2 analysis Phase 2 (13 months) • More detailed review of the viable options from Phase 1 • Analysis focused on technical and financial aspects of each option 8 System Services • DS3 System Services Procurement Design – Competitive Multi Bid Auction and Regulated Tariff • Decision paper by end of 2014 Demand Side Management DSU 150 MW • DSU Grid Code Working Group – 4 modification approved by the Ireland GCRP – Further consultation on frequency requirements and performance monitoring – SONI consultation on Grid Code modifications • ESBN and NIE expressed concerns about impact of DSUs on their system security • Work on identifying and removing barriers to service provision close to completion AGU 85 MW Powersave 10 MW STAR 45 MW Economy 7 Night Saver DS3 – Shaping the System of the Future Frequency Voltage Renewable Data Realising Potential of DSO Generation Transmission 110kV TSO-DSO Engagement Distribution 33kV Voltage Control • ESBN implemented TSO-DSO agreed changes at Cauteen wind farm cluster • Interim measure to improve voltage stability in the area • Wider reactive compensation studies underway – Value of DSO windfarms: significant off setting of transmission reactive compensation requirements 2025 Power Factor of TYPE B Wind Farms @ CAUTEEN MVAr Required @ CAUTEEN WP 0.95 Leading 145 WP 0.98 Leading 105 WP Unity Power Factor 55 WP Voltage control ± 0.95 15 Operational Studies • Voltage Dip Induced Frequency Dip (VDIFD) studies – due mid Nov • Ramping policy study and tool – due end 2014 • Minimum no. of conventional generation – complete * • High SNSP Report – H1 2014 complete * • High wind speed shut down report – complete * DS3 Programme Operational Policy Review Control Centre • Automated approach to large scale dynamic studies using Plexos – pilot complete Policy Policy Policy Review Period Unforeseen Outcome Analysis, Policy, Tools. Not accepted. Improve. Not accepted. Improve. Analysis, Policy, Tools. DS3 – Shaping the System of the Future WSAT Control Centre Tools Model Dev. & Studies CCT and WSAT CCT • Wind dispatch tool went live in Belfast on 24/07/2014 – DCC Constraint – Developer Outage – High Frequency/Min Gen – RoCoF/Inertia – SNSP Issue – Test – Developer – Test – TSO – Transmission Constraint WSAT • Validation of dynamic model performance underway – (1) tuning and (2) cross validation using real events