MPD 575 Design for Testability

Download Report

Transcript MPD 575 Design for Testability

MPD 575 Design for Testability

Jonathan Weaver

1

Development History

• This material was prepared by Cohort 3 students in the Fall of 2002: – Ron Anger – Jim Gregoire – Guillermo Jimenez – Bob Ognjanovski – Rob Spinks

2

Need for Testing

• High Complexity • Mass Production • High cost of replacement in the field • “The earlier the faulty part is rejected, the cheaper it is” • Testing is no longer viewed as a “

no value add” or “hard to justify” expense

3

Need for Testing (Cont.)

• Testing is viewed as an integral part of the manufacturing process • Customer expectations of “0” PPM • Increase in customer chargeback to recover all costs associated with “faulty” components

4

Problems with Testing

• Testing can comprise as much as 30% of the cost of building a product • Testing is difficult and time consuming due to the large number of test steps, that must be applied • Testing is boring and considered not creative • Designs are completed without testing in mind

“ Testing is painful, Not Testing is suicidal.”

5

Why Testing:

Relative cost of finding and fixing errors

Cost vs. Error Type 20 18 16 14 12 Cost ($) 10 8 6 4 2 0 Requirements Design Coding Unit Test Error Type Acceptance Maintenance 6

Design for Testability •

Introduction to DFT

• Key Principles in DFT • DFT Considerations • DFT Process • DFT in Hardware development • DFT in Software development • DFT, Reliability, and Robustness • Examples of DFT techniques • Heuristics • References

7

Related DFXs

• • • • • • • Design for Inspectability Design for Dimensional control Design for Serviceability Design for Diagnostics Design for Modularity Design for Reliability Design for Robustness

8

Testability

The IEEE Standard Glossary of Software Engineering Terminology (1990) defines testability as:

"(1) the degree to which a system or component facilitates the establishment of test criteria and the performance of tests to determine whether those criteria have been met, and (2) the degree to which a requirement is stated in terms that permit establishment of test criteria and performance of tests to determine whether those criteria have been met."

9

10

Definitions of DFT

– Ability to generate, to evaluate and to apply tests that improve quality and minimizes time-to-profit – Extent to which a design can be tested for the presence of manufacturing, base component, system, and/or field defects – Measure of how easy it is to generate test sets that have a high fault coverage

11

Design for Testability

– An initiative in the computer hardware industry in the 1980’s – Objectives: • • Lowers the cost of manufacturing Minimizes the design engineer's involvement in production set-up • Improves cross-functional communication and cooperation among design, engineering, and manufacturing

12

Design for Testability (Cont.)

• Testing is more expensive in the short-term but cheaper in the longer-term • Lowers both production and life-cycle costs • Decreases test times and virtually eliminates harrowing production delays • Guarantees more efficient diagnosis and repair in the field • Improves fault coverage

13

Design for Testability (Cont.)

• Testability must be engineered into the product at the design stage itself, such that optimal compromise is archived between system maintainability and performance.

• To maximize its impacts, DFT must be performed at all stages of the design –from schematics –to design of subsystems – to system integration

14

Test Coverage vs. DFT

A B 100% C Number of Test Steps A=Design done with testability in mind B= Design made without Testability in mind by a good fault coverage due to large effort in making test steps C=Design very difficult to test

15

Motivation, Goals, and Benefits of DFT

• Better fault coverage and fault isolation • Shorter testing time • Higher quality product • Shorter time-to-market • Lower life-cycle cost

16

Design for Testability

• Introduction to DFT

Key Principles in DFT

• DFT Considerations • DFT Process • DFT in Hardware development • DFT in Software development • DFT, Reliability, and Robustness • Examples of DFT techniques • Heuristics • References

17

Key Principles of DFT

• Interfaces that are standard, common, and simple • Accessible points • Automated • Self-test with onboard sensors • Integrated (testing multiple components at the same time) • Testing in parallel (sweep gauges at the same time) • Testing one thing verifies many (Traction control switch checks switch, MUX, cluster,…)

18

Key Principles of DFT

• Identification of opportunities • Standardization • Simplification of interfaces • Adjustable • Tunable • Diagnostics • Indicators • Procedures • Location

19

Key Principles of DFT

• Accessibility • Obstruction • Orientation • Visibility • Intuitive • Tools (not specialized) • Ergonomic • Non-destructive • Models/CAE

20

Design for Testability

• Introduction to DFT • Key Principles in DFT

DFT Considerations

• DFT Process • DFT in Hardware development • DFT in Software development • DFT, Reliability, and Robustness • Examples of DFT techniques • Heuristics • References

21

Perspective of DFT

• Keywords in Testability: – Understandability (The more information we have, the smarter we test) – Predictability – Observability and Traceability (What we see is what we test ) – Controllability (The better we can control it , the more the testing can be optimized)

22

Perspective of DFT

• Keywords in Testability: – Understandability (The more information we have, the smarter we test) – Predictability – Observability and Traceability (What we see is what we test ) – Controllability (The better we can control it , the more the testing can be optimized)

23

Perspective of DFT (Cont.)

• DFT involves modifying the design in such way that maximum controllability and observability are attained.

• DFT is an approach in which the component (SW or HW) is designed from the start such that testing problems do not arise during the product life-cycle

24

Evaluation of Component Testing Capability

Four Levels of testing • Level 1: Initial – Constructed with ad-hoc testing mechanism, testing format, and testing functions – More time in understanding behaviors, debugging, and testing

25

Evaluation of Component Testing Capability

(Cont.) • Level 2: Standardize – Built to support pre-defined testing mechanism & testing format – Reduces cost of debugging and testing – Extra programming overhead

26

Evaluation of Component Testing Capability

(Cont.) • Level 3: Systematic – Design with a set of systematic testing mechanics – Easy to monitor and to test the components – Reduce programming overhead

27

Evaluation of Component Testing Capability

(Cont.) • Level 4: Customizable – Design to facilitate the support of the testing functions & customization – Help to set-up testing for components based software

28

Mechanisms to Increase Component Testability

Framework-based Testing facility – Well-defined framework (such as class library) to add test code – Simple and flexible to use – Need component source code

29

Mechanisms to Increase Component Testability

(Cont.) Built-in testing – Need well-defined built-in mechanisms to add test code – High programming overhead during component development – No external support needed

30

Mechanisms to Increase Component Testability

(Cont.) Automatic component wrapping for testing – Component wrapped inside program for testing – Low programming overhead – Well-defined testing framework to interact with testing tools

31

Design for Testability

• Introduction to DFT • Key Principles in DFT • DFT Considerations

DFT Process

• DFT in Hardware development • DFT in Software development • DFT, Reliability, and Robustness • Examples • Heuristics • References

32

DFT Process

1. Evaluate testability of system architecture 2. Define testability requirements and targets 3. Describe testability context 4. Perform testability reviews 5. Define required design changes

33

DFT Process (cont.)

6. Collect experience 7. Define General testing strategy and standards 8. The design is not finished until final testing requirements are defined and accounted for

34

35

Design for Testability

• Introduction to DFT • Key Principles in DFT • DFT Considerations • DFT Process

DFT in Hardware development

• DFT in Software development • DFT, Reliability, and Robustness • Examples • Heuristics • References

36

DFT in Hardware Development

• Test generation for large circuits is very time consuming. One way to get around this problem is to constrain or to modify the design in order to make test generation easier.

37

DFT in Hardware Development

• Most DFT techniques are targeted to sequential circuits where test generation is usually a difficult problem

38

DFT in Hardware Development

• If testing is not considered during the design phase, then very low fault coverage and high test generation times can result.

39

DFT in Hardware Development

• The objective of DFT is to improve the controllability and observability of internal circuit nodes so that the circuit can be tested more efficiently and effectively

40

DFT in Hardware Development

Controllability: • Ability to set or to reset internal nodes from the primary inputs Observability: • Ability to observe the value of an internal node at the primary outputs

41

DFT in Hardware Development

• DFT attempts to improve circuit testability by making the internal nodes more controllable and observable

42

DFT in Hardware Development

• Benefits in implementing DFT in HW development: – Shorter time-to-market – Reduced test time – Less expensive testing equipment – Yield learning, which is often overlooked

43

DFT in Hardware Development

• Sacrifices in implementing DFT in HW development: – Increased area of components – More pins on printed circuit boards(PCB) – Increased PCB area – Degraded performance on the circuits

44

Design for Testability

• Introduction to DFT • Key Principles in DFT • DFT Considerations • DFT Process • DFT in Hardware development

DFT in Software development

• DFT, Reliability, and Robustness • Examples of DFT techniques • Heuristics • References

45

DFT in Software development

• • Most complex modern systems are a blend of Software and Hardware Testability analysis of a system is incomplete without adequately accounting for the effect of software

46

Challenging Problems in Software Testing

– Software is usually much more complicated than hardware – Typically, about 40 to 50% of the overall development budget is spent on testing – Absence of “Known good” response – Lack of testing models, adequate testing criteria, and testing methods – Software flaws are design flaws

47

Software Verification

The IEEE Standard Glossary of Software Engineering Terminology (1990) defines software verification to be the “

Process of evaluating a system or component to determine whether the products of a given development phase satisfy the conditions imposed at the start of that phase

."

48

Software Testability

Software testability can be defined as “the probability that a piece of software will fail on its next execution during testing (with a particular assumed input distribution) if the software includes a fault.”

49

True Reliability

Software Code Software Testing Software Testability Formal Verification 50

Design for Testability

• Introduction to DFT • Key Principles in DFT • DFT Considerations • DFT Process • DFT in Hardware development • DFT in Software development

DFT, Reliability

• Examples of DFT Techniques • Heuristics • References

,

and Robustness 51

52

53

DFT, Reliability, and Robustness

Testability

: “

A design characteristic allowing the following to be determined with a given confidence, in specified time and condition (noise): location of any faults, whether an item is inoperable, is operable but degraded, and/or is operable”.

54

• •

DFT, Reliability, and Robustness

Reliability -

the probability that the System will perform its intended function over time under specific operating conditions

Reliability -

Targets may be set on the commodity or by specific tests used to age the commodity and account for the noise factors.

55

• •

DFT, Reliability, and Robustness

Key Life Testing –

A method to demonstrate Reliability and Robustness by combining the primary stresses into one test or a series of tests on the same System.

Noise Factors

– All noise factors should be accounted for in the appropriate testing (ex. DVP)

56

• • •

DFT, Reliability, and Robustness

The component/subsystem/system MUST consistently perform its ideal function in the presence of uncontrollable influences (NOISE FACTORS).

Noise factors MUST be included in testing plans used to demonstrate testability and reliability Noise Factors must be identified and linked to Potential Failure Modes and Design Verification Testing Plans to achieve an appropriate robustness using reliability metric(s) to assess the consistent performance of the System design.

57

• •

DFT, Reliability, and Robustness

Functional performance targets should be established during the development of program-specific System Design Specification, P-diagrams, and FMEAs Where individual component targets are not available or appropriate, the subsystem or system target will be referenced

58

DFT, Reliability

,

and Robustness

Design Validation Targets for both the SOFT and the HARD reliability failures are to be established and to be documented in the component Design Verification Plan (DVP). These testing targets and criteria are to reflect customer expectations for the useful life of the component/subsystem/ system ideal function(s). Use of generic “failure levels” are not acceptable, as they may not sufficiently represent the customer expectations for product reliability

SOFT

(degraded performance to an unacceptable level)

HARD

(product function ceases)

59

DFT, Reliability, and Robustness

Design Validation  Any product testing plan MUST include: The range of critical Noise Factors that the component/subsystem/system will be exposed to during the System Useful Life  Compounded noise factors to create worst-case noise scenarios (i.e. min/max levels of part tolerance (dimension, strength, smoothness) against an extreme set of external noises (i.e. temperature, humidity, user conditions).

60

DFT, Reliability, and Robustness

Testing Matrix    Testing metrics must include component, subsystem, and system test samples in either: Key Life Testing (KLT) Test-to-failure (Weibull analysis) Signal-to-Noise Ratio (Taguchi methods for robustness)  Comparative testing (testing against either a competitors’ or surrogate component)  Component, subsystem, and system level testing (a weak test)

61

Design for Testability

• Introduction to DFT • Key Principles in DFT • DFT Considerations • DFT Process • DFT in Hardware development • DFT in Software development • DFT, Reliability, and Robustness and Robustness •

Examples of DFT Techniques

• Heuristics • References

62

Example of DFT Technique:

In-circuit Test • Highly cost-effective test approach • Testing access made with bed-of-nail-fixture • Highly automated • Total nodal access (Test Points) through devices (i.e. pins, test pads, connectors or vias) • Verifies the electrical characteristics of each component

63

Example of DFT Technique:

Built-In Self-Test (BIST) • Implementation of a different kind of logic in the design so it can test itself • BIST can be categorized in: – Online BIST: Testing is done while the system is in normal operation or during idle mode – Offline BIST: System is brought into a testing mode at predetermined regular intervals

64

Example of DFT Technique:

Logical Built-In Self-Test (LBIST) • Used to test standard cell logic • A State machine is used to drive pseudo-random vectors into scan chains and then the output of the chain is compressed into a signature value to be scanned out at the end of test

65

Example of DFT Technique:

Boundary-Scan • New practical testability tool.

• Initiated by Joint European Test Action Group • Provides the ability to develop a test to exercise all devices pins with a limited amount of effort • Extra control lines must be added to the device to support the boundary-scan function • It is intended to check for shorts or open connections between ICs mounted on a circuit board

66

Example of DFT Technique:

Automatic Test Pattern Generation (ATPG) • Reduce the volume of data needed to test each device to the highest possible coverage • Unlike functional test vector, ATPG specifically targets structural defects or faults • Includes Advance Pattern Compression and optimization techniques

67

Example of DFT Technique:

ATPG (Cont.) • Advance Pattern Compression: 1)

Static Compression Technique

(eliminate redundant test from a given pattern-it does not detect new faults) and 2)

Dynamic Compression Technique

(multiple faults are targeted during test pattern generation itself) • Pattern Optimization Capability: Order pattern sets from the most effective (highest test coverage) to least effective pattern

68

Example of DFT Technique:

Full-Scan Design • All circuits are placed in a

Scan chain

, and values are scanned before and after each test vector • Straightforward ATPG problems • Guarantee high coverage • High-speed testing

69

Example of DFT Technique:

Full-Scan Design (Cont.) • Disadvantages: – Some designs are not able to abide by design rules in all cases – Area overhead (10-20% additional area dedicated to testing), routing difficulties – Timing impact – Many testing cycles required on testers

70

Example of DFT Technique:

Static Fault Analysis • Used as a rapid means to assess the inherent testability of a system • Identifies undetectable faults, ambiguity groups, and redundant tests • Identifies the topological testability limitations of the system, and makes DFT recommendations to overcome them

71

Example of DFT Technique:

Testability Engineering and Maintenance System (TEAMS) • Graphical software tools for diagnostic model development and analysis • Integrates a unique multi-signal flow graph modeling methodology • Integrate various analysis techniques for performing testability analysis and design for testability

72

Example of DFT Technique:

TEAMS (Cont.) • Examples of problems that TEAMS can solve: – With a given set of tests, can all failures be detected?

– What testing should be used and where should they be located, so all the faults can be isolated in minimal time and/or cost?

73

Example of DFT Technique:

TEAMS (Cont.) • Examples of problems that TEAMS can solve (Cont.): – What is the most efficient sequence of testing that will isolate all the failures?

– What percent of modules, pulled as “faulty”, are actually OK?

– Are all the components within the system reliable enough to survive the entire mission?

74

Design for Testability

• Introduction to DFT • Key Principles in DFT • DFT Considerations • DFT Process • DFT in Hardware development • DFT in Software development • DFT, Reliability, and Robustness and Robustness • Examples of DFT Techniques •

Heuristics

• References

75

Heuristics

• Prototype designs work, the problems show up later.

• Diagnostics are highly efficient in finding solved problems.

• Murphy’s law applies 95% of the time. The other 5% we are on coffee breaks.

• When all but one wire, in a group, switches, the one will switch too.

76

Heuristics

• Worst Case tolerances never add – but when they do they are in our best customer’s machine • Map your testing strategy and your design approach with respect to inheritance hierarchies • Make control structures explicit • Don’t squeeze the code

77

Heuristics

• The percent of errors (bugs) left after software validation is proportional to the percent of errors found during validation

78

Testability Challenges... the Management Issue

• Because DFT is essentially a management issue and not a technology issue, any testability effort must have management's full commitment and support if it is to succeed

79

The Testability Challenge

• Regardless of the trends in system testing capability, the basic challenge for test engineers is not to change the design, but rather to make the designer a believer in testability.

80

Design for Testability

• • Introduction to DFT • Key Principles in DFT • DFT Considerations • DFT Process • DFT in Hardware development • DFT in Software development • DFT, Reliability, and Robustness and Robustness • Examples of DFT Techniques • Heuristics

References 81

References

http://www.teamqsi.com/ : Qualtech System Inc WEB Page.

Electronic News: Decreasing the Cost of Testing with Automatic Test Pattern Generation Integrated Diagnostics Toolset. IEEE Autotest Conference (1997).

Integrated Process for Fault Diagnosis. IEEE Aerospace Conference (1999).

82

References

S. Deb, K.R. Pattipati, V. Raghavan, M. Shakeri, and R. Shrestha, “Multi signal Flow Graphs: A Novel Approach for System Testability Analysis and Fault Diagnosis,” 1994

IEEE Aerospace and Electronics Magazine IEEE AUTOTEST Conference,

, May 1995, pp. 14-25. (Winner of the Best Technical Paper Award at the Anaheim, CA, September 1994).

IEEE Standard Glossary of Software Engineering Terminology

(1990) http://www.cigitallabs.com/resources/definitions/testability.html

http://www.ate.agilent.com/emt/industry/testabilityguidelines/index.shtml

83

References

Phillips, Jeffery C., “Essential Testability Guidelines for current Technology.” IEEE computer society press reprint, Los Alamitos, CA 90720 1993 Pettichord, Bret., “Design for Testability”, http://www.io.com/~wazmo/papers/design_for_testability_PNSQC.pdf

2002 Illlman, Richard., “Design for testability: separating the myths from reality.

http://www.eetimes.com/in_focus/silicon_engineering/OEG20020718S002 18-July-2002 Olausson, Mikeal, and Wiklund, Daniel. “Introduction to Design for Testability.” http://www.ida.liu.se/~zebpe/teaching/test/lec6.pdf

2001 5

84

References

Gao, Jerry. “Component Testability and Component Testing Challenges”, Technical Report http://www.sei.cmu.edu/pacc/cbse2000/papers/18/18.pdf

State University, in 2000. in San Jose Neal, Bob. “Test for Designability.” Technical Report Agilent Technology 15 February 2003 http://www.home.agilent.com/upload/cmc_upload/All/Bneal_dft_dfd.pdf

85