Folie 1 - Институт Физики Высоких

Download Report

Transcript Folie 1 - Институт Физики Высоких

SIS300 Roadmap and
preconsortium board
SIS 100/300
SIS 18
UNILAC
Super
FRS
HESR
Sergey Kozub
Institute for High Energy
Physics
Protvino, Russia
SIS300 meeting
19 March, 2009
CR
FLAIR
RESR
NESR
SIS300
dipoles
SIS300
quadrupoles
INFN (Italy), VNIINM (Russia)
2008 – SIS 300 dipole model (6T, straight) has been produced and
successfully tested by IHEP, Russia.
Development of SIS300 dipole prototype by INFN, Italy:
2008 – TDR and engineering drawings of SIS300 dipole prototype have
been completed. Tooling for the prototype production has been
manufactured and trial half-coil has been wound.
2009 – production of cold mass and cryostat of SIS300 dipole prototype.
2010 – cold test of the cold mass, integration it in cryostat and delivery to GSI.
Possible plan of following steps:
2012 – production and test of two short and two full scale SIS300 dipole
pototypes.
2014 – manufacture and test of four magnets for pre – series .
2015 – Production, test and delivery 18 SIS300 dipoles.
2016 – Production, test and delivery 38 SIS300 dipoles.
2017 – Installation and commissioning of SIS300 dipoles.
SIS300
SIS300 quadrupoles
quadrupoles
IHEP, VNIINM (Russia)
2008 – IHEP has developed design of cold mass of SIS300 quad prototype
2009
2010
2011
2013
Engineering drawings of cold mass of SIS300 quad prototype have
been completed.
VNIINM has produced and tested 1 km length SC wire of 0.825 mm
diameter.
– Development of tooling drawings for the cold mass production, start
of the tooling manufacture and TDR preparation.
– Tooling manufacture and production of the cold mass. Design
development of quad cryomodules of four types.
Production of 5 km SC wire by VNIINM.
– Cold test of the cold mass.
Production of 20 km SC wire by VNIINM.
– Manufacture and test of quad cryomodules of four types.
Production of 470 km (2 ton) SC wire by VNIINM.
2016 – Production, test and delivery SIS300 quad cryomodules.
2017 – Installation and commissioning of SIS300 quad cryomodules.
SIS300 corrector
and steering magnets
SIS300 quadrupoles
IHEP, VNIINM (Russia)
2009 – Design development of cold mass of four types corrector and steering
2010
2011
2012
2013
magnet and TDR preparation.
– Engineering drawings of the corrector and steering magnet cold
masses and tooling development for production of these cold masses.
– Tooling manufacture and start of the cold masses production.
Production of SC wire by VNIINM (parameters of SC wire will be
determined).
– Production and test of cold mass of corrector and steering magnets.
– Manufacture and test of quad cryomodules of four types.
Production of 120 km (400 kg) SC wire by VNIINM.
2016 – Production, test and delivery SIS300 quad cryomodules.
2017 – Installation and commissioning of SIS300 quad cryomodules.
SIS300
local quadrupoles
cryogenic system
SIS300
IHEP, Russia
2009 – Optimization of SIS300 cryogenic system (in cooperation with GSI).
2010 – TDR of SIS300 cryogenic system and a cryogenic system equipment
requirements (in cooperation with GSI).
2011 – Technical Specification for the cryogenic system equipment (in
cooperation with GSI, CRYOGENMASH, GELIYMASH).
2012 – 2015 – Development, production and test of cryogenic system
equipment by CRYOGENMASH, GELIYMASH, IHEP.
2016 – 2017 – Delivery, assembling and commissioning of cryogenic system
equipment in tunnel by CRYOGENMASH, GELIYMASH and
IHEP.
Other
systems
of SIS300
SIS300
quadrupoles
1. Other SIS300 systems involve:
Power supplies – GSI (Germany), Finland.
RF systems – GSI (Germany),
Beam diagnostics – ITEP (Russia), GSI (Germany),
Vacuum – GSI, V.G.Boc, NEGch (Germany), Cracow UT
(Poland)
 Injection/Ejection – ?




2. These SIS300 systems are similar to the corresponding
systems of SIS100, which will be commissioned in 2014 year .
SIS300
preconsortium
SIS300
quadrupolestasks
Distribution and coordination of tasks on SIS300
construction between participating parties
Coordination of SIS300 systems development
Technical coordination for integration of different
systems, quality assurance requirements for
production and test of SIS300 equipment
Consultations, working meetings and information
exchange
Distribution
and quadrupoles
coordination of tasks
SIS300
Some questions for correct SIS300 planning must be
solved, for example:
 Development, production and test of dipole
cryomodule.
 Place for cold test including magnetic axis
measurements of SC magnets in cryomodules.
 Producer of superconducting wires and other
materials for SIS300 magnets.
Integration
ofquadrupoles
different systems
SIS300
Questions which delay development of SIS300 systems,
for example:
 Structure of SIS300 with a longitudinal dimension of all
elements.
 Power circuit of SIS300 magnets which define list of wires and
cables pass through SC magnets.
 Design of connections between cryomodules.
 Design of beam pipe.
 Adjustment of cryomodules in the tunnel.
ProposalSIS300
for organizational
quadrupolesstructure
of SIS300 preconsortrium Board
1.
The Board is an ultimate authority of the SIS300 preconsortium.
2. The Board consists of leaders of SIS300 systems. The leaders were
appointed by organizations, which have presented EoIs.
Leaders of SIS300 systems:
Dipoles – Pasquale Fabbricatore, INFN, Italy
Quadrupoles, Multipoles, Cryogenic system - Sergey Kozub, IHEP, Russia
Beam diagnostics – Timur Kulevoy, ITEP, Russia
Other systems and integration – Peter Spiller, GSI, Germany
Proposal
for quadrupoles
SIS300 preconsortium
SIS300
Board
3.
4.
5.
Spokesperson (SP) represents the SIS300 preconsortium and is
responsible for organizing operations, procedures, progress, policies,
planning of the preconsortium.
SP is assisted by a deputy (SPD). The Board elects SP and SPD for twoyear term that can be renewed.
Resource coordinator
Immediate tasks of SP, SPD and Board are:
Steering of R&D activity directions
Integration of different systems
Planning of SIS300 development
Preparation of SIS300 consortium Governance Rules
Preparation of SIS300 TDR
Spokesperson – S. Kozub
Deputy Spokesperson - ???
Many thanks for your attention