Transcript Slide 1
S.Montebgnoli IRA -INAFBologna –Italy4th SKADS Workshop, Lisbon, 2-3 October 2008 4th SKADS Workshop, Lisbon, 2-3 October 2008 BEST Stelio Montebugnoli DS-6 T1 Deliverables: 1- Analogue (T0+12mo) and/or digital optical links (T0+21mo). 2- Architecture and technology for immediate application on the BEST - x demonstrator construction (T0+10mo). Year 1 Project DS6 - T1: Design Develop and Demonstrate Sub - Systems Qtr 1 Qtr 2 Qtr 3 Year 2 Qtr 4 Qtr 1 Qtr 2 Qtr 3 Year 3 Qtr 4 Qtr 1 Qtr 2 Qtr 3 Year 4 Qtr 4 Qtr 1 Qtr 2 Qtr 3 Qtr 4 End Best - 1 Construction Best - 2 Construction Best - 3 Construction Analog and / or digital optical links Architecture and technology for immediate application on the BEST - x demonstrator construction 4th SKADS Workshop, Lisbon, 2-3 October 2008 BEST Stelio Montebugnoli 1- Analogue (T0+12mo) and/or digital optical links (T0+21mo). (Done) Analog Link Optical RX BEST-2 IF Optical Tx 4th SKADS Workshop, Lisbon, 2-3 October 2008 BEST Stelio Montebugnoli 2- Architecture and technology for immediate application on the BEST - x demonstrator construction (T0+10mo). (Done) Low Noise balanced Amplifier Optical link Front End IF Amplifier A/D 4th SKADS Workshop, Lisbon, 2-3 October 2008 BEST Stelio Montebugnoli DS-6 T2 Deliverables: 1. front ends to the receiver room (T0+12mo). 2. Immediately ready and easily replicable electronic (T0+12mo). 3. Local oscillator and sync. distribution in large infrastructures/arrays (T+38mo). 4. Wide band and high dynamic range Data Acquisition System (T+39mo). 5. 2 GHz analogue optical link (already used in BEST-1 and planned for BEST-2, -3 6.Tested adaptive beamforming and RFI Mitigation algorithms (T0+39mo). Year 1 Project DS6 - T2: Develop and Demonstrate BEST Qtr 1 Qtr 2 Qtr 3 Year 2 Qtr 4 Qtr 1 Qtr 2 Qtr 3 Year 3 Qtr 4 Qtr 1 Qtr 2 Qtr 3 Year 4 Qtr 4 Qtr 1 Qtr 2 Qtr 3 Qtr 4 End Best - 1 Construction Best - 2 Construction Best - 3 Construction IRA - TEKMAR 2GHz analog optical link (already used in BEST-1 and planned for BEST-2, -3 from the front-ends to the receivers room) and digital link Immediately ready and easily replicable electronic Local oscillator and sync distribution in large infrastructure / arrays Wide band high dynamic range Data Acquisition System Software Beamforming Tested adaptive beamforming and RFI mitigation algorithms 4th SKADS Workshop, Lisbon, 2-3 October 2008 BEST Stelio Montebugnoli DS-6 T2 Deliverables:.. 1,2,3,4,5, .in practice. LNA Front end FX correlator 4th SKADS Workshop, Lisbon, 2-3 October 2008 Easily replicable electronic Optical Fiber BEST Sync distribution LO distribution Stelio Montebugnoli 6.Tested adaptive beamforming and RFI Mitigation algorithms (T0+39mo) (Not completely Done). 1 2 N Simulation level. Not jet implemented . It will be the next step pf the Bee2 programming. A/D w1 A/D w2 A/D w N Rˆ 1 t T Rˆ X= Rx n° samples per Rx using Cholesky Decomp. dˆ0 Dim. NxT Rˆ 1dˆ0 w = ˆ H ˆ 1 ˆ d R d 0 0 Final version will be programmed on the Bee 2 engine 4th SKADS Workshop, Lisbon, 2-3 October 2008 BEST Stelio Montebugnoli DS-6 T3 Deliverables: 1.Simulation Software for sensor array (T0 + 36 months) 2.Methodology to compare expected results with the simulated ones (T0 + 39 months) Year 1 Project DS6 - T3: Assessment of performances Year 2 Year 3 Year 4 Qtr 1 Qtr 2 Qtr 3 Qtr 4 Qtr 1 Qtr 2 Qtr 3 Qtr 4 Qtr 1 Qtr 2 Qtr 3 Qtr 4 Qtr 1 Qtr 2 Qtr 3 Qtr 4 End Best - 1 Construction Best - 2 Construction Best - 3 Construction Simulation software for sensor array Methodology to compare expected results with the simulated ones Comparison of performances with the SKAMP demonstrator 4th SKADS Workshop, Lisbon, 2-3 October 2008 BEST Stelio Montebugnoli 1. Simulation Software for sensor array (T0 + 36 months) (Partially done) UV-plane coverage analysis for the BEST project (SKA-DS) INAF-IRA Technical Report #417/08 E. Carretti1, D. Dallacasa1, 2 1-INAF–IRA, Via Gobetti 101, I-40129 Bologna, Italy 2-Università di Bologna, Astronomy Dep., Via Ranzani 1, I-40126 Bologna, Italy 4th SKADS Workshop, Lisbon, 2-3 October 2008 BEST Stelio Montebugnoli 2. Methodology to compare expected results with the simulated ones (T0 + 39 months) (Partially done) P ; , T ; , sin d d DS6-T3: Assessment of T ; , , Performace P ; , sin d d n b 0, 0,2 ant 0 0 0 n = 86.3 K 0, 0,2 Computed TSYS BEST-1: Pn obtained with . GRASP GBEST 1 Computed TSYS F=408 MHz K 1 Ag 26 K 10 0.045 2 k Jy Jy Tsys GBEST 1 Fluxeq 0.045 K Jy 2100 Jy 94.5 K Measured TSYS 4th SKADS Workshop, Lisbon, 2-3 October 2008 BEST Stelio Montebugnoli DS-4 Deliverables: (to be focused with J.G. Bij de Vaate and Laurens Bakker) Kick off meeting in Medicina (Bologna) on April 2008 (BdeV) 4th SKADS Workshop, Lisbon, 2-3 October 2008 BEST Stelio Montebugnoli Rxi A Calibration, Direct Pixeling, FX Correlation Calibration, Digital Adaptive beamforming (linked with DS3-T2 & DS 4 T3 and T5) D Coarse Time Delay DDC FIFO FX corelator Rxi spectrum F X . Resc PFB Fringes (f) 4 (bits) Delay CTRL Intellig. RFI I FFT-1 Handling Adapt. Beamf. RX 1 1 Beam 1 Beam i Beam k m I Delay & RFI control Calibration/FFT Phase LUT Adaptive Beamf. Control i m Rxi Calibration RX i k RX m Adaptive/multibeaming Block diagram (Deliverables) 4th SKADS Workshop, Lisbon, 2-3 October 2008 BEST Stelio Montebugnoli 4th SKADS Workshop, Lisbon, 2-3 October 2008 BEST Stelio Montebugnoli