Transcript Slide 1
Clarification Meeting National Integrated Vegetation Management 08 March 2013 Programme 09:30 - 10:00 Registration, Coffee & Tea ---------------------------------All 10:00 - 10:10 Welcome & Objectives---------------------------------------Programme Director 10:10 - 10:15 Safety Procedure ---------------------------------------------Facilities 10:15 – 10:45 Technical Representation ----------------------------------Koos/Rudi/Richard 10:45 – 11:00 SHEQ Representation ------------------------------------- Meisie Sindane 11:00 - 11:15 PQA Presentation ---------------------------------------------Cara James 11:15 – 11:30 Eskom Group Commercial :Process ------------------- Singathwa Shweni 11:30 – 11:45 Supplier Development and Localisation --------------- Kwanele/Ishmael 11:45- 12h10 Risk and Governance Rep--------------------------------12:10 – 12:25 Clarification Q and A session------------------------------ All 12:25 - 12:30 Summary and Closure ------------------------------------- Programme Director Technical Presentation Koos/Rudi/Richard Background Vegetation management is a Technical (Electrical Supply Security and Safety) and Social (Environmental Preservation) imperative Vegetation Management activities are highly regulated (National and Eskom Specification – See Section 2 of Contract Specification) Vegetation management activities are biome based (See Annex ‘B’ of the specification – Typical Biome) Vegetation management activities will comply with all requirements of the OHSA, specific reference to construction regulations (See Section 4.7 and Annex ‘C’) Successive maintenance interventions for a line segment will be a progression from Cycle 1 to Cycle 3 with the latter repeated for the follow-on years (See also Annex ‘B’) Vegetation clearance area’s will be done in accordance with corridor specification for different line types (See section 4.3 – See Table) 4 PROGRAMME SCOPE Renders Vegetation Management Services in accordance with Eskom Documentation 240-52456757 for the Generation, Transmission and Distribution Divisions. This includes: Management of permits from state institutions by Eskom and land owner permission to perform vegetation management activities by the Contractor (See Section 4.5): and Harvesting of trees and brushes in power line corridors and waste management as specified and agreed with the land owner: and/or Cutting of grass/reeds in power line servitudes/way-leaves and on Eskom Engineering property as required and/or Establishment of fire breaks and biomass reduction employing fire management practices and/or Application of prescribed chemicals to control vegetation growth NOTE: Above activities may be performed by contractors specifically licenced by Eskom to do so. No contractor may act outside the scope of their Authorisation Category and/or Level. 5 Summary of the Scope of Work The provision of tools, equipment, consumables and human resources as specified to perform vegetation management services for Eskom as directed in the references listed below. This includes administrative tasks to obtain permission, provide feedback and report any nonconformance to specification anticipated with above services . - 240_53456757_R1: Contractor Specification for Vegetation Management - Services on Eskom Networks 15_2_2013: General Manpower and equipment requirements for various levels of vegetation management contractors - DSP_240_53456757 Addendum 1: Vegetation management price list - Vegetation Service Provider Contractor Technical Assessment 6 Gate Keeper One & Two TECHNICAL Gate Keeper One: OHSA Statutory and Regulatory Compliance Gate Keeper Two: Organisational Competence to Manage Vegetation as specified (See Annex ‘D’) 7 Technical Requirements Applicable gate keepers must be achieved, to be evaluated further Technical weighting in RFP is 30% Technical questionnaire is part of the Tender Returnables (section 2) Technical evaluation will mostly be based on information stated in the Technical questionnaire CV’s (Name List and Competence profile match/gap) of team dedicated to Eskom must be included The technical Threshold is set at 60% 8 2015/07/16 32-726 / 32-136 Eskom Safety Process 9 Background Information Eskom has embarked on a drive to create and sustain a world-class culture and standardisation within Eskom Commercial Process regarding Safety, Health and the Environment . As part of Eskom’s Supplier Management System, it is now a requirement for all suppliers who wish to undertake work for Eskom to undergo an occupational safety, health and environment (SHE) evaluation process. This process assists Eskom to determine whether suppliers take reasonably practicable steps to apply safe systems of work; comply with the legislative and Eskom-specific requirements and addresses SHE adequately. 10 2015/07/16 ZERO HARM VALUE Eskom will strive to ensure that zero harm befalls its employees, contractors, the public and the natural environment. 11 2015/07/16 SHE Tender Returnable 32-726/32136 ANNEXURE B The acknowledgement form for Eskom rules and requirements Occupational Health & Safety – OHS Act no85 National Environmental Management Act, 1998 (Act No. 107 of 1998) NEMA 32 - 727 Eskom Safety, Health, Environmental and Quality Policy 32 - 421 Eskom Cardinal Rules32-95 Eskom Incident Management Procedure 32-36 Eskom procedure on Smoking 32-345 Eskom Vehicle Safety Specification 32-93 Vehicle Safety Procedure 34-323: Personal Protective Equipment Specification National forestry Act and other applicable legislation. 34-190: Access to farms (includes strategy on dealing with game farms) 34-350 : Compliance to the incident management procedure 34-146: Compliance to the operating regulations for high voltage systems/ authorizations standard 34-227: Pre-task planning and feedback process DMN 34-100: Work with petrol driven pruners - on ground level and from a bucket attached to a vehicle mounted crane/aerial device 32-815: Eskom Land and Biodiversity32-736: Eskom Land and Biodiversity Policy Standard Commercial Timber Growers Guideline for: Maintenance and management agreement in forest plantation areas and servitude areas 12 ANNEXURE C Vegetation Management Plan- Minimum requirements for vegetation management contractors To assess whether the supplier has the capability and capacity to manage SHE adequately for the scope of the work being tendered for. Aim to see if the supplier has any management system in place and capable of providing SHE plan and file to stations as required. Safety Specification (as per the Occupational Health and Safety Act, Act 85 of 1993) 1. COID registration (letter of Good Standing) 2. SHEQ Policy • Signed by the CEO 3. Approved SHE Plan • Sub-contractors appointed (ensure compliance) • Fall protection, scaffolding plan etc. • If there’s modification in a contract new plan to be submitted 13 Vegetation Management Plan- Minimum requirements for vegetation management contractors ANNEXURE C Safety Specification (as per the Occupational Health and Safety Act, Act 85 of 1993) 4. Legal Appointments according to OHS Act and Environmental Management Act (e.g. • 6(1) & 16(2) • ORHVS responsible person • Risk assessor, • Fire officer, environmental officer • First Aider • Incident investigator, • Scaffolding inspector • Chain saw operator, Pest controller officer 5. Risk Management (risk assessment & analysis) • Task analysis • Risk assessment • Safe work procedures (SOP’s, instructions, guidelines) • Fall protection plan & risk assessment • Scaffolding plan, inspection records 14 ANNEXURE C Vegetation Management Plan- Minimum requirements for vegetation management contractors Safety Specification (as per the Occupational Health and Safety Act, Act 85 of 1993) 6. Personal Protective Equipment • List of PPE • Checklist (issue, inspections, etc.) 7. Hazardous Chemical Substances • Combustible materials and hazardous chemical substances should be stored adequately • Material Safety Data sheets (MSDS) 8. Emergency Preparedness • Emergency Plan (fire equipment, emergency numbers etc.) 9. Medical records • Proof of Medical Surveillance plan • Statutory minutes 10. Incident Management • Procedure on incident investigation • Previous Stats record if available 15 Vegetation Management Plan- Minimum requirements for vegetation management contractors ANNEXURE C Safety Specification (as per the Occupational Health and Safety Act, Act 85 of 1993) 11. Maintenance (equipment- vehicle, machinery etc.) • Plant & Equipment Maintenance plan • Petrol driven pruners - on ground level and from a bucket attached to a vehicle mounted crane/aerial device • Road worthiness of vehicles (compliance to 32-93, 32-345) 12. SHE Training • Training analysis/ matrix, schedule • Training records (including SHE induction, Wildlife interaction training , Environmental Legislation Training ) • Proof of a responsible person on (ORHVS), • Minimum Vegetation Clearance Distance (MVCD) including general servitude widths, corridor size • Training in manual lifting and working posture Note: ONLY A REGISTERED PEST CONTROL OPERATOR MAY APPLY HERBICIDES ON A COMMERCIAL BASIS. ALL COMMERCIAL APPLICATION OF HERBICIDES SHALL BE CARRIED OUT UNDER THE SUPERVISION OF A REGISTERED PEST CONTROL OFFICER. 16 Eskom Sustainability Dept: Procurement Quality Assurance Procurement Quality Assurance • We lead and execute all Procurement Quality Assurance activities from Procurement Strategy to Contract Award. Prior Contract 18 Eskom Contract Quality Requirements (Standard QM58) QM 58 Standard The requirements include, but are not limited to the following: 1. QMS Requirements (Ref: QM 58, Section 3.1) • The Tenderers shall implement and maintain a Quality Management System which, as a minimum, meets the requirements of ISO 9001 QMS Requirements. Compliance to ISO requirements shall be verified by a full quality compliance assessment performed by Eskom prior to award of contract. 19 2015/07/16 Eskom Contract Quality Requirements (cont.) QM 58 Standard The requirements include, but are not limited to the following: Quality Documents to be submitted with the Tender (Ref: Eskom Standard QM58, Section 3.2 QM 58 Section 3.2 QM 58 Section 3.2 QM 58 Section 3.2 QM 58 Section 3.2 QM 58 Section 3.2 • Completed and signed enquiry/contract/order quality requirements forms (Annexure B) • A Copy of the CV/ Resume of the Tenderers Quality Management Representative responsible for the services. • One provisional copy of the Contract Quality Plan (including a signed Quality Policy) • A copy of a valid ISO 9001: 2008 certificate or objective evidence of an ISO 9001: 2008 compliant QMS. • Latest company structure/organogram including the Quality function/department and resources, including an abridged indication of qualifications (the quality structure to show who the quality departmental leader reports to within the tenderer’s organisation) 20 2015/07/16 Eskom Contract Quality Requirements (cont.) Quality Documents to be submitted with the Tender (Ref: Eskom Standard QM58, Section 3.2 Information on similar work performed recently (within the last two years) • Sample Contract Quality Plan (including a Quality Control Plan) from a similar project executed by the tenderer less than two years ago • Sample report reflecting Quality Performance (report to reflect statistics of at least six months) and Measures • A typical Sample of a completed and closed-out Non-conformance Report • A typical Sample of a completed and close-out Corrective and Preventive Action reports 21 2015/07/16 Eskom Contract Quality Requirements (cont.) Quality Documents to be submitted with the Tender (Ref: Eskom Standard QM58, Section 3.2 Management of suppliers / sub-contractors to the tenderer • A detailed description of the process/procedure for evaluation, selection and control of subcontractors/suppliers(where applicable). • A copy of any QMS accreditations or any information relating to specific standards within their industry. (e.g. Welding, NDT, NDE) or any other special processes requiring certification. 22 2015/07/16 NOTE: Access to the Tenderers premises and facilities. Eskom or its inspection authority/agency, where appropriate, shall be afforded access to the consultant’s and sub-contractor’s premises and facilities at reasonable times to conduct quality audits, surveillance or inspections to verify compliance with the contract/order. 23 2015/07/16 Commercial Presentation Singathwa Shweni Background and Overview on Commercial function Eskom is required to maintain its national network to ensure the consistent and safe supply of electricity to customers in compliance with set key performance indicators developed by the National Energy Regulator of South Africa (NERSA). In ensuring the safe mechanical and electrical operation of its power lines, Eskom needs to maintain vegetation on the power line servitudes so as to meet its legal, business social and environmental obligations. All vegetation posing a risk to the lines or preventing access must thus be managed without interfering with the natural attributes of the environment in compliance with environmental and safety requirements. The process is there to ensure that the procuring of goods, materials, assets and services are managed effectively and efficiently, following and governed by Eskom Procurement and Supply Chain Management Policy Rev 0. 32-1033 and Procedure Rev 0. 32-1034 2015/07/16 25 Group Commercial :Process Followed: Eskom’s commercial process will include: Issue an open tender, which has already gone out into the market 24 February 2013 Clarification Session which is taking place today the 08 March 2013. Tender Closing on the 25 March 2013 at 10:00 am at different Provinces as stipulated on the advert. Evaluation of RFQ submissions will be done by the Commercial, SD &L, Technical, Safety, Legal and Quality teams Award of the Contract to be advised Note: Only service providers that meets the minimum Threshold and the Gatekeepers will be evaluated further. 2015/07/16 26 Points to note on tender: All tender returnables need to be submitted with the tender to be responsive for evaluations The tender shall be submitted as in 3 copies: one (1) printed original, one (1) copy of the original and (1) electronic copy. An electronic copy of the documentation on a CD or memory stick in a readable format must be submitted together with the proposal. The CD and or memory stick must be clearly labelled with supplier name. The place for delivery of the tenders is Eskom’s Tender Box located at different provinces as stipulated on the next page The deadline for tender submission is 10:00 am on 25 March 2013 : South African Time The link to our website is www.eskom.co.za/ tenderbulletin- whats out on tender, general search….Eskom divisions, provinces, suppliers, contract types- NEC 3 term Services Contract 2015/07/16 27 Points to note on tender: cont • The place for delivery of the tender in Mpumalanga and North West is Eskom’s Tender Box located at Eskom Megawatt Park, 1 Maxwell drive, Sunninghill, at the Main Reception • The place for delivery of the tender in Western Cape is Eskom’s Tender Box located at Tac Centre, Brackenfell, Block E, Procurement Office. • The place for delivery of the tender in Limpopo is Eskom’s Tender Box located at 90 Hans Van Rensburg Street, Polokwane • The place for delivery of the tender in Eastern Cape is Eskom’s Tender Box located at Ground Floor, Leadwood House, Cedar Square Bonza Bay Rd,Beaconbay ,East London,5201 • The place for delivery of the tender in Kwazulu Natal is Eskom’s Tender Box located at 25 Valley View Road, New Germany • The place for delivery of the tender in Free State and Northern Cape is Eskom’s Tender Box located at Eskom, 120 Henry Street, Bloemfontein 2015/07/16 28 Evaluation Criteria • Evaluation Criteria will follow a holistic approach evaluating the supplier’s ability to perform sustainably to the standards as required by Eskom. The following evaluation criteria will be used to determine the contract awarding of the RFQ tender process: • Technical criteria: 30% • • • • Financial Evaluation: 20% • Vegetation Care Group pricing framework per biome and activity (excluding transport and accommodation) will be provided to suppliers through which to quote; • Eskom’s standard cost model will be utilised to determine the strength of the quotation Internal systems and processes: 20% (Quality and SHE) • Criteria reflecting the strength of the company’s internal systems and processes focusing on SHEQ. • Eskom is working towards ISO9001-2008 requirements or a QMS system according to ISO. The percentage threshold is 10%. Footprint: • • The technical criteria developed and approved by the Vegetation Care Group for licencing and technical standards. The percentage threshold is 60%. Criteria reflecting geographical footprint of the company with greater points to local to region suppliers. SD&L/B-BBEE evaluation: 30% • The B-BBEE certificate will weigh10% • The compliance matrix will weigh 20% 2015/07/16 29 Contracting NEC Term Services Contract • Possible Clauses • • • • • • • 2015/07/16 Main Option A- Priced contract with price list W1: Dispute resolution procedure X1: Price adjustment for inflation X2: Changes in Law X18: Limitation of Liability X19: Task order Z: Additional conditions of contract 30 Supplier Development and Localisation (SD&L) (Execution Support) Content 1 Mandate 2 Mandate Measurement of Performance Areas 3 Evaluation Criteria 4 Compliance Matrix 5 Questions 32 We have a mandate to contribute positively to the development of the country Our mandate is to achieve maximum and sustainable local development impact through leveraging Eskom’s procurement spend in a manner that allows flexibility within the business in order to accommodate government local development initiatives and policies 33 SD&L measures impact along these key performance areas Key performance areas Definition Skills development • Increasing the skill base (number and skill level) of South African workers in areas relevant to the vegetation sector and where there is a national scarcity of skills Local content • Utilisation of Eskom and suppliers’ spend to develop South African based suppliers relevant to the vegetation sector (focusing primarily on BBBEE Black Owned suppliers including BPLwD, BYO and BWO) Job creation • Creation of new jobs by suppliers as a direct result of Eskom business Supplier development • Providing a platform to develop emerging suppliers, and further contribution to local developmental opportunities for national and international suppliers B-BBEE • Economic empowerment of Black South Africans 34 Supplier Development and Localisation enabling mechanisms have had to be embedded onto the current procurement procedure – Evaluation Criteria The evaluation criteria seeks to increase SD&L evaluation score allocation in the overall scoring and to ensure all dimensions of local development are considered: Threshold of 60% 10% • B-BBEE Ownership Grass-Cutting – Set-aside for 100% BWO Bush Clearing low and high Tree Felling, Herbicides Application and Fire Management – Preference of Level 1 to 4 (See B-BBEE Scorecard below) 35 Evaluation Criteria Continuation…. 20% • Local content Local Content to South Africa - 100% Local to Site - 100% of the Local Content to South Africa per Province Sub-Contracting – 30% of Local to Site (10% BPLwD, 10% BYO and 10% BWO) • Skills Development Grass-Cutting : 350 Bush Clearing low and high Tree Felling : 270 Herbicides Application : 390 Fire management : 120 • Job Creation Suppliers to propose on the compliance matrix • Supplier Development Detailed Plan on how to improve black ownership 36 Overall Evaluation Criteria A Valid B-BBEE Certificate from SANAS Accredited Verification Agency OR an Auditors certificate or similar certificate issued by an Accounting Officer must be submitted Grass-Cutting : Set-aside for BWO’s Bush Clearing low and high Tree Felling : Preference is Level 1 to 4 Herbicides Application : Preference is Level 1 to 4 Fire Management : Preference is Level 1 to 4 A Completed and Signed Compliance Matrix is a GATEKEEPER, with a 60% Threshold that MUST be met for further evaluations 37 B-BBEE Evaluation Matrix Scorecard (10%) 38 38 Compliance Matrix for Grass-Cutting (20%) The overall SD&L Compliance Matrix get inputs from the Skills Development, Job Creation and Local Content. The minimum threshold is 60% 39 Compliance Matrix for Bush Clearing low and high Tree Felling (20%) The overall SD&L Compliance Matrix get inputs from the Skills Development, Job Creation and Local Content. The minimum threshold is 60% 40 Compliance Matrix for Herbicides Application (20%) The overall SD&L Compliance Matrix get inputs from the Skills Development, Job Creation and Local Content. The minimum threshold is 60% 41 Compliance Matrix for Fire Management (20%) The overall SD&L Compliance Matrix get inputs from the Skills Development, Job Creation and Local Content. The minimum threshold is 60% 42 Risk and Governance PREPARATION FOR TENDERING • Read and understand Invitation to Tender, if you do not understand not, verify with the Sourcing Specialist- (Judas Mashamba) • Plan ahead to avoid surprises • Adhere to the stipulated number of copies • Bind the tender document NEATLY – NO LOOSE PAPERS • Indicate the Enquiry Number on the outside of the envelope and tender file • Price to be STRICTLY on the Tender Opening and Evaluation Criteria page. If not, deemed as ‘No Price Tendered’ • Indicate price page with a sticker 43 Risk and Governance cont… TENDERING • Adhere to the stipulated closing date and time as No late tender will be accepted • It is the responsibility of the tenderer to ensure that couriered tenders are placed in the tender box before the closing time. 44 Who to Contact: Singathwa Shweni- 011 800 4770 Email: [email protected] Judas Mashamba- 011 516 7278 [email protected] 45 Questions 46 46 Thank you 47