2013 Bond Program
Columbia School District
•
•
•
•
•
•
INTRODUCTIONS
PROJECT SCOPE REVIEW
PROJECT TIMELINE
ANTICIPATED WORK CATEGORIES
BIDDING PROCEDURES
PROJECT CONTACTS
PROJECT SCOPE REVIEW
COLUMBIA CENTRAL HIGH SCHOOL (BP 02)
-
RENOVATE NEW 7TH/8TH GRADE WING
NEW ADDITION - LOCKER ROOMS
ADMINISTRATION RENOVATION / SECURE ENTRANCE
UPGRADE FINISHES AND REPLACE DOORS / WINDOWS THROUGHOUT H.S.
NEW ARCHITECTURAL AND SCIENCE LAB CASEWORK
UPGRADE BUILDING HVAC AND CONTROLS
UPGRADE BUILDING LIGHTING, FIRE ALARM, ELECTRICAL
UPGRADE TECHNOLOGY
SITEWORK – ATHLETICS, PARKING, BUS AND PARENT DROP OFF AREAS
PROJECT SCOPE REVIEW
ELEMENTARY, INTERMEDIATE, AND OPTIONS
SCHOOL (BP 03)
-
RENOVATIONS TO ACCOMMODATE GRADE LEVEL RECONFIGURATION
ADMINISTRATION RENOVATION / SECURE ENTRANCE
UPGRADE FINISHES AND REPLACE DOORS / WINDOWS THROUGHOUT
RENOVATE TOILET ROOMS
NEW CASEWORK
UPGRADE BUILDING HVAC AND CONTROLS
UPGRADE BUILDING LIGHTING, FIRE ALARM, ELECTRICAL
UPGRADE TECHNOLOGY
TIMELINE
• BID PACK 02 – (HIGH SCHOOL)
– BID DOCUMENTS AVAILABLE WEEK OF OCTOBER 20, 2014
– BIDS DUE WEEK OF NOVEMBER 17, 2014
– BID REVIEW / POST BID INTERVIEWS TO SUPPORT 12/1/14 AWARDS
• CONSTRUCTION
–
–
–
–
7TH/8TH GRADE WING 12/1/14 – 4/6/15 (SPRING BREAK)
LOCKER ROOM ADDITION START 3/30/15
REMAINING BUILDING START AFTER SCHOOL
ALL WORK SUBSTANTIALLY COMPLETE FIRST WEEK SEPTEMBER 2015 FOR
SCHOOL
• BID PACK 03 (ELEMENTARY AND MIDDLE SCHOOL)
– START IN SOME AREAS AT SPRING BREAK (APRIL 2015)
– BALANCE OF WORK IN SUMMER 2015
TIMELINE
ANTICIPATED WORK CATEGORIES
•
•
•
•
•
•
•
•
•
•
•
DEMOLITION
STRUCTURAL CONCRETE
MASONRY
STRUCTURAL / MISCELLANEOUS STEEL
GENERAL TRADES
ROOFING
ALUMINUM / GLASS & GLAZING
DRYWALL / ACOUSTICAL / PLASTER
RESILIENT FLOORING AND CARPET
HARD TILE
PAINTING AND COATINGS
• LOCKERS
• INTERIOR & EXTERIOR SIGNAGE /
BANNERS
• PLUMBING
• HVAC
• ELECTRICAL / FIRE ALARM
• EARTHWORK AND UTILITIES
• ASPHALT PAVING / STRIPING
• ATHLETIC SURFACES / EQUIPMENT
• SITE CONCRETE
• FENCING
• LANDSCAPE / TURF & GRASS /
PLANTINGS
QUESTIONS & ANSWERS
•
Question: Will there be a local preference for the bids?
Answer: No, however the owner has the right to accept or reject any or all offers.
•
Question: Will plans and specifications be available at ABC Reproduction?
Answer: Yes. Bid Docs can be reviewed on Granger FTP site.
•
Question: Will the mechanical package be one package (Plumbing/HVAC) or separate
packages?
Answer: Separate packages
•
Will this be a prevailing rate job?
Answer: Yes
•
Will certified payroll be required?
Answer: Yes
•
Will a bid bond be required in the amount of 5% be required?
Answer: Yes
•
Will a performance bond be required?
Answer: Yes
CONTACT INFORMATION
GRANGER CONSTRUCTION CO.
MATT LERG
[email protected]
DENISE STYX
[email protected]
WEBSITE
HTTP://RESTORETHESOARWITHGRANGER.COM/