REVERSE the
Solid Waste: An undervalued source of energy
Presented by CIREMSA S.A. De C.V. : Ing. Jose Ramon Alonso Pujol
and Richard Lepine
GREEN POWER ENVIRONMENTAL CORPORATION
Solid Waste: An undervalued source of energy
Executive Summary
•Tultitlan Industrial Park companies (and Industrial Parks in general )
face operating challenges from current unsteady supply of electricity :
- reliability is an issue due to frequent outages;
- price of power is high;
- situation not likely to improve in the future;
• Tecnosilicatos de México and GPEC Global are joining forces to
develop integrated waste valorization/energy production facilities:
- recycling of glass, ferrous/non-ferrous metals, cardboard;
- mineralization of wet organic fraction of MSW, yielding
building material and/or soil fertilizer, as by-products;
- gasification of residual waste and subsequent generation of
clean, stable and source of renewable electricity;
• CIREMSA is offering a “ Perfectly Green Solution” , which integrates
a 45 MW (gross) Waste-To-Energy electricity production facility;
Municipal &
Commercial
Waste
CIREMSA “ Zero Waste /
Energy Production Solution ”
WWTP
Sludge
Tipping
Fee
Note: Revenue Centres in Coloured Areas
• Metal
• Paper/Cardboard
• Aluminum
• Glass
Tipping
Fee
Municipal
Water
Boiler
Feed
Water
Retreat
Water
Tires
100%
15%
85%
50%
Separate
Organic
Fraction
Inorganic
Waste
Sort &
Recycle
Gasification
of Residual
Waste
Storage
Buffer
Shred
Generate
Steam
Condense
Steam
(geothermal)
50%
Wet
Organic
Waste
Ash
Mineralization Process
• Dehydrate
• Grind
• Mix Additives
• Building
Materials
• Soil Substitute
or fertilizer
3%
Cyclone
Remove PM
in Flue Gas
WOW - Clean
Emissions
Option
Steam
Turbine
Generate
Electricity
Sludge
Gas
Delivery
Bio Digestion
Cleanup
Gas
Bio-Digestion/Gas Production Option
Clean Flue Gas
Compress
Gas
(waste heat)
Natural Gas
Vehicles
Power to
Offtakers
PRESORTING PARTLY MANUAL
AND PARTLY MECHANICAL
SHREDDING AND MILLING, MAKES THE
PROCESS EFFICIENT AND COST EFFECTIVE
1
2
3
5
4
6
7
9
8
MINERALIZATION IS THE KEY TO THE WHOLE PROCESS
Each silo
contains
different
additives
1
2
3
4
CM 500
X - FIBER
X - MENT
X - BALL
X – BASE
X – FUEL
X - SOIL
GPEC : Technology – Complete system
Final TM
NOTE: All ash is returned to TM
Process =
Zero Solid Waste Rejects
GPEC : Technology – Gasification
KMW Systems Inc.
GPEC : Technology –Emissions control
WOW Clean®
WOW Clean Advantages
•Integrated Multi-Pollutant Reduction System:
 95% NOx & SOx (tested, 100% removal);
 85% Mercury;
 90% Vaporized heavy metals;
 99.5% Particulate removal;
 25% CO2 (tested: 85% removal);
•Virtually, Zero Emission Power Plants
•Provides Emission Credits
GPEC : Technology – Steam Turbine
GE, Dresser Rand or Shin Nippon
ADVANTAGES OF “PERFECTLY GREEN SOLUTION”
Intelligent
operation
Energetic self-supply of fuel and energy plant adapted to power
generation or cogeneration exercise.
All processes fully automated and maximum operational safety
Historical
performance
Machinery suppliers have proven high standards for decades:
Organics/Sludge mineralization system working for over 5 years in
Europe.
More than 3,500 gasification units sold by KMW since 1949.
Proven results
Guaranteed to deliver chemically stable products, environmentally
sustainable electricity production, without producing any kind of
environmental liability
Technological
advantage
Tecnosilicatos de Mexico is the only company in Mexico with the
technology to treat and valorize sludge and mineralize organic
residues from Municipal Solid Waste streams. GPEC is most
innovative power producer transforming MSW into clean energy
CIREMSA Mexico
CIREMSA proposes to construct in Ciudad de Mexico,
next to TM Facilities, complete turnkey WTE facilities,
under Self-Generation, Build, Own, Operate (BOO) model:
Project Basis
Waste Volume to TM
10,000 tonnes/day
Waste Volume to GPEC WTE
+/- 4,500 tpd
Optimal number of WTE facilities
6 x 750 tpd
Electricity produced
45 MW x 6 = 270 MW (gross)
Net Electricity produced
216 MW
Construction Period
~ 22 months each - phased
Contract Term
20 years
GPEC Investment
$220M each = $1,320,000,000 USD
CIREMSA Mexico
CIREMSA projects will help transform 4,500 tpd of
post-sorted MSW into 216 MW (net) of electricity,
while preventing this waste to turn into ±850,000
tons of CO2 over a 20-year GPEC project lifespan.
Facility Design
Gross Power Production
270 MW Total
Performance Factor
93%
Internal Load
35 MW
System Net Capacity
216 MW
Mexico Power Purchase Agreements
• GPEC is looking for industrial/commercial offtakers for the
power from its WTE facilities (standard 45MW plant):
- 36 MW net per hour normally available;
- estimated 295,000 MWh, annually;
• Reliable source of renewable, baseload power 24/7:
- potential exists to connect plant power output
directly to clients facilities;
- modular GPEC plant design improves availability
(93% avg.)
• Power provided at discounted rate to clients current weighted
average LyFC / CFE price for power
Mexico Power Purchase Agreements
• PPA sets conditions of formal supply / offtake of electricity
for a period of 15-20 years
• Tultitlan WTE Plant commissioning scheduled for mid-year
2010
• GPEC to invest $220,000,000 USD to build a standard WTE
45MW Plant (Finance-Build-Own-Operate model)
“ Energy Production; perfected! ”