It all began in 2000
Organizational chart
Our Strategy
What Can We Do
Where We Are
Our Services
In Hand Projects
In Service Projects (References)
End
SAMAN ENERGY
03
04
05
06
07
08
11
20
42
Company Profile 2012
|2
It all began in 2000
The company was established in 2000
and went into production of Electrical
and control systems in 2002. After 4
years of development, it has been one of
the professional manufacturer
of
electrical and control systems in the field
of industrial plants in Iran.
In 2005 , the founders resolved to
developing company as an EPC
contractor of industrial water and waste
water treatment plants, Desalination and
demineralization plants, condensate
polishing plants, RO systems and all
other general mechanical and electrical
project in the field of power plants and
oil & gas utilities.
Today SAMAN ENERGY has been
registered as one of the Professional EPC
contractor in the vendor list of main
clients in Iran as well.
SAMAN ENERGY with the aid of
appropriate tools and equipment
accompanied by expert engineering and
technical teams, has achieved enormous
approaches in design, manufacturing and
implementation of various projects and
now, equipped with vast reserve of
experience in performing these projects
is looking outside to offer its engineering
and manufactures services to different
sections of technology around the globe.
In order to facilities technology transfer
and primary material procurement, we
are in technical and business ties with
famous European companies.
The latest projects under taken by us
demonstrate our leading position in the
industry.
we are sure that brilliant performance in
these projects is an introduction to the
new phase in establishing our strong
position in domestic and global market.
No. Of Employees In 2011: 172 people
Turnover In 2011: 35 Mill. Euro
SAMAN ENERGY
Company Profile 2012
|3
SAMAN ENERGY
Organizational chart
Share Owner
Corporate Executive Office
Board Of Directors
Management
EPC (Turn Key) Projects Activities
Energy
Oil & Gas
Water & Waste Water
Other Industries
Production(Industrial Automation)
Control & Process Systems (PLC,FCS,DCS,PMS,PDCS)
Withdrawable MV Panels (Under License of KOHL)
Withdrawable LV Panels (Under License of CUBIC)
Fixed LV Panels (Under License of ETA)
MCC Panels
Control Panels
Corporate Staff
Business
Development
SAMAN ENERGY
Finance
Human Resource
Commercial &
communications
Global Research
Company Profile 2012
|4
Our Strategy
Our goal is to be the premier domestic
and even global General EPC company.
We have firmly embedded our corporate
responsibility (CR) agenda as a strategic
objective within our Company strategy.
Our Company strategy emphasises our
commitment to total performance in
every aspect of our business – not only
technical performance, but also business
conduct and other parts of our CR
agenda.
In order to facilities technology transfer
and primary material procurement, we
are in technical and business ties with
famous European companies.
SAMAN ENERGY
Company Profile 2012
|5
What Can We Do?
(SAMAN ENERGY Co.):
Industrial Automation (PLC, DCS, FCS, PMS, PDCS …) in Turn-key Application.
Professional Manufacturer in Electrical MCC, LV & MV Panels.
Exclusive Agent of CUBIC/ETA in Iran.
(FALAT SANAT IDEH Co.):
EPC Contractor for:
Industrial Water Treatment Plants (WTP)
Municipal Water Treatment Plants (WTP)
Condensate Polishing Plants (CPP)
Electro Chlorination Plants (ECP)
Continuous Electro Deionization Plants (CEDI/EDI)
SAMAN ENERGY
Company Profile 2012
|6
Where We Are?
SAMAN ENERGY
Company Profile 2012
|7
Our Services
SAMAN ENERGY Group is utilized with devoted
professional teams in various engineering
disciplines including tendering, process,
mechanical, electrical, instrumentation and
control departments.
All engineering categories included in SAMAN
ENERGY’s scope of work is covered in these
departments by professional experts and all
specialists using their scientific and
experimental background to fulfill all
requirements of our clients.
These departments are in close linkage with
scientific and research centers from all over the
world in order to keep pace with the latest
available technology in our field of activities.
All our effort is preparing in hand projects with
the best possible quality, reliability and
introducing new techniques and methods in the
field of water and wastewater treatment by
holding scientific conferences for our clients and
offering through tenders.
The engineering services include basic designs
and all detail designs of the projects and all
documentations regarding latest international
standards.
SAMAN ENERGY engineers have close contact
with project sites to have supervision on proper
installation and performance of plants.
SAMAN ENERGY
SAMAN ENERGY’s engineering departments
operate exclusively in the field of:
1. Condensate polishing plants, including Hot
Condensate Polishing Plants and Cold
Condensate Polishing Plants.
2. Industrial Water Treatment Plants including
pretreatment units, filtration units, reverse
osmosis systems and Demineralization Plant for
various industries such as power plants,
refineries, petrochemical projects, steel
companies…
3. Industrial Waste Water Treatment Plants using
various methods and technologies for all specific
effluent treatment plants after required case
studies.
4. Gas Chlorination Systems and Chemical Dosing
System.
5. Sanitary Waste Water Treatment Plants by
means of different methods.
6. Urban Water Treatment Plants with different
available methods for towns and cities with no
limitation on capacity.
7. Pump stations and piping networks.
8. Electrical and control systems.
Company Profile 2012
|8
Our Services ( cont. )
Tendering Department :
This department executes a variety of different
tasks ranging from reviewing the tender
documents, checking the design, preparation of
engineering documents as specified in tender
documents, preparation of preliminary PFD and
P&ID, electrical, instrumentation and control
sections of tender, to preparation of price break
down.
Process Department :
This department's duties include basic design,
detail design, close relation with suppliers,
preparation of process documents like PFD,
P&ID, Site plan, process description, process
calculations, and detail process data sheets…
Mechanical Department :
Among various tasks performed in this
department are, designing piping systems,
pump stations, pressure vessels, tanks, heat
exchangers, screens, gates and other
mechanical equipments, preparation of
mechanical documents and providing material
take off list for procurement department.
Electrical Department :
Here we do things such as designing electrical
systems, preparation of related documents and
M.T.O lists.
Instrument and control Department :
Our experienced staff in this department
perform designing of instrument and control
systems, PLC programming, atomization
department, preparation of M.T.O lists for
procurement department.
Project Planning Department :
In SAMAN ENERGY Group, planning and project
controlling is an important core process of
project management; it begins as early as the
planning phase and accompanies all subsequent
project phases until the project has been
handed over. As a holistic concept it also covers
project steering in addition to actual controlling
functions (such as tracking and monitoring
deadlines, costs, capacities and progress).
SAMAN ENERGY
Project controlling is based on planned/target/
actual comparisons using numerous project
parameters and supplies the management team
with ongoing reports that serve as a transparent
basis for decision-making.
Specific data requirements are defined during the
project planning stage. These form the basis of
the comparison between target and performance
data that takes place during further project
stages. Basic project costing is also carried out at
this time. The project is continually monitored
and steered during the "implementation" and
"completion" project phases. During project
handover, a concluding analysis and a final
costing for the project are carried out. Potential
for improvement is analyzed in a targeted
manner and knowledge gained is recorded
systematically for future projects.
Project planning is part of our project
management, which relates to the use of
schedules such as Gant charts to plan and
subsequently report progress within the project
environment.
Initially, all the project activities and their
requirements or features are defined and the
appropriate methods for completing the project
are determined. Following this step, the
durations for the various tasks necessary to
complete the works are listed and grouped into a
work breakdown structure. The logical
dependencies between tasks are defined using
an activity network diagram that enables
identification of the critical path Float or slack
time in the schedule can be calculated using
project management software such as MSP or
Primavera. Then the necessary resources can be
estimated and costs for each activity can be
allocated to each resource, giving the total
project cost. At this stage, the project plan may
be optimized to achieve the appropriate balance
between resource usage and project duration to
comply with the project objectives.
Company Profile 2012
|9
Our Services ( cont. )
Once established and agreed, the plan becomes
what is known as the baseline. Progress will be
measured against the baseline throughout the
life of the project. Analyzing progress compared
to the baseline is known as earned value
management
In order to do all above, the planning and
project control experts in SAMAN ENERGY Co.
use all their experiences and knowledge to offer
the optimum ways.
Project control is the element of a project that
keeps it on-track, on time, and within budget.
Project control begins early in the project with
planning and ends late in the project with postimplementation review, having a thorough
involvement of each step in the process. Each
project should be assessed for the appropriate
level of control needed; too much control is too
time-consuming, too little control is too costly.
Control systems are needed for cost, risk,
quality, communication, time, change,
procurement, and human resources. In addition,
auditors should consider how important the
projects are to the financial statements, how
reliant the stakeholders are on controls, and
how many controls existing. Auditors should
review the development process and
procedures how they are implemented.
The process of development and the quality of
the final product may also be assessed if
needed or requested. A business may want the
auditing firm to be involved throughout the
process to catch problems earlier on so that
they can be fixed more easily. An auditor can
serve as a controls consultant as part of the
development team or as an independent
auditor as part of an audit.
SAMAN ENERGY
Procurement Department :
In SAMAN ENERGY Group, all elements of
procurement activity, from identifying need,
challenging that need, considering options,
procuring the appropriate goods, services or
works, effective supplier and contract
management, through to the disposal of assets.
The many solutions are available to the economic
council, from establishing corporate contracts,
using collaborative and consortia arrangements,
through to developing long-term strategic
partnerships.
This Strategy continues to provide a clear focus
on balancing two priorities:
1. Identifying and delivering efficiencies, but not
at the cost of quality, and
2. Developing unflinching procurement.
These two priorities can be reconciled through
adopting a mixed economy approach, evaluating
on the basis of whole life costs, and breaking
down the barriers to council opportunities.
Procurement department responsibilities include
maintaining lists of prospective and approved
vendors, soliciting bids or proposals trough
tendering department, negotiating price and
terms and conditions of purchase, selecting
suppliers and issuing purchase orders.
Procurement assistants work with buyers and
perform a variety of procurement administrative
functions.
The procurement department is responsible for
negotiating, writing and executing written
contracts. Contract specialists negotiate and
write consulting agreements, sponsored project
subcontracts, repair and construction
agreements, architectural, engineering and other
services agreements and service order
agreements.
Company Profile 2012
|10
Automation Projects
In Hand Projects
1. Kish Sewage Dist. Control and Telemetry System :
Owner : ………………………………...………………..…….
Client : ……………………………….………………………….
Kish Waste Water Company
Sazeh Abi Co.
Abstract
Engineering (Basic and Detail Design, Procurement, Panel Manufacturing, PLC
Programming, HMI Design, FAT, SAT, Commissioning
System/Technology :
PLC
HMI
Telemetry
Networking
Redundancy
:
:
:
:
:
Siemens SIMATIC S7-400
WinCC
Trio Datacom (Schnider Electric), for 10 Stations
Profibus/Industrial Ethernet/ModBus
CPU/Communication/HMI
2. Genaveh Combined Cycle Power Plant, Auxiliary Boiler, Control System :
Owner : ………………………………...………………..…….
Client : ……………………………….………………………….
Genaveh Power Generation Company (BOO Project)
Mapna MD3/ Pakman
Abstract
Engineering (Basic and Detail Design, Procurement, Panel Manufacturing, PLC
Programming, HMI Design, FAT, SAT, Commissioning
System/Technology :
PLC
HMI (Touch Panel)
Networking
Redundancy
SAMAN ENERGY
:
:
:
:
Omron CPU 65H
Wincc Flexible
Profibus/Industrial Ethernet
CPU/Communication
Company Profile 2012
|11
Automation Projects
In Hand Projects Cont…
3. Fars Combined Cycle Power Plant, Auxiliary Boiler Control System :
Owner : ………………………………...………………..…….
Client : ……………………………….………………………….
IPDC (Iran Power Development Company)
Mapna MD2/Novin Fan Avar Ehya
Abstract
Engineering (Basic and Detail Design, Procurement, Panel Manufacturing, PLC
Programming, HMI Design, FAT, SAT, Commissioning
System/Technology :
PLC
HMI
Networking
Redundancy
:
:
:
:
Siemens SIMATIC S7-400
WinCC
Profibus/Industrial Ethernet
CPU/Communication/HMI
4. South Pars Gas Field Development Phases 1 Onshore Facilities, Emergency Switchgear :
Owner : ………………………………...………………..…….
Client : ……………………………….………………………….
SPGC
SPGC
Abstract
Engineering (Basic and Detail Design, Procurement, Panel Manufacturing, FAT, SAT,
Commissioning
System/Technology :
Incoming Feeders :
Diesel Gen. :
Main Outgoings: :
Cubicle :
Main Equipment :
Protection Relays :
SAMAN ENERGY
3 sets of 2500 A, 4Pole, 70KA
2 sets of 2500 A, 4Pole, 70KA
4 Sets of auxiliary turbine generators, 1250A
Cubic (Withdrawable)
Schneider Electric
Alstom, Micom Series
Company Profile 2012
|12
Automation Projects
In Hand Projects Cont…
5. South Pars Gas Field Development Phases 1&2 Onshore Facilities, MCC Panel:
Owner : ………………………………...………………..…….
Client : ……………………………….………………………….
SPGC
SPGC
Abstract
Engineering (Basic and Detail Design, Procurement, Panel Manufacturing, FAT, SAT,
Commissioning
System/Technology :
Cubicle : Cubic (Withdrawable)
Equipment : Schneider Electric
6. Zafar & Faraman DCS 63/20 KV Substation :
Owner : ………………………………...………………..…….
Client : ……………………………….………………………….
Tavanir
Trans Post Pars
Abstract
Control & Protection, Measuring and SCADA and AVR System Engineering (Basic and
Detail Design, Procurement, Panel Manufacturing, FAT.
System/Technology :
System : DCS Substation
SAMAN ENERGY
Company Profile 2012
|13
Automation Projects
In Hand Projects Cont…
7. Damavand Combined Cycle Power Plant, Condensate Polishing Plant (CPP), Control System for
units 1,…,6 of Power Plant :
Owner : ………………………………...………………..……. IPDC (Iran Power Development Company)
Client : ……………………………….………………………….
Mapna MD2/Energy va Palayesh Ab kherad.
Abstract
Engineering (Basic and Detail Design, Procurement, Panel Manufacturing, PLC
Programming, HMI Design, FAT, SAT, Commissioning
System/Technology :
PLC
HMI
Networking
Redundancy
:
:
:
:
Siemens SIMATIC S7-400
WinCC
Profibus/Industrial Ethernet
CPU/Communication/HMI
8. Yazd Solar Combined Cycle Power Plant, Condensate Polishing Plant (CPP), Control System for
units1, 2 of Power Plant :
Owner : ………………………………...………………..……. Mapna MD2
Client : ……………………………….………………………….
Energy va Palayesh Ab kherad.
Abstract
Engineering (Basic and Detail Design, Procurement, Panel Manufacturing, PLC
Programming, HMI Design, FAT, SAT, Commissioning
System/Technology :
PLC
HMI
Networking
Redundancy
SAMAN ENERGY
:
:
:
:
Siemens SIMATIC S7-400
WinCC
Profibus/Industrial Ethernet
CPU/Communication/HMI
Company Profile 2012
|14
Automation Projects
In Hand Projects Cont…
9. Sanandaj Combined Cycle Power Plant, Condensate Polishing Plant (CPP), Control System for
units 1,2,3 of Power Plant :
Owner : ………………………………...………………..……. IPDC (Iran Power Development Company)
Client : ……………………………….………………………….
Mapna MD2/Energy va Palayesh Ab kherad.
Abstract
Engineering (Basic and Detail Design, Procurement, Panel Manufacturing, PLC
Programming, HMI Design, FAT, SAT, Commissioning
System/Technology :
PLC
HMI
Networking
Redundancy
:
:
:
:
Siemens SIMATIC S7-400
WinCC
Profibus/Industrial Ethernet
CPU/Communication/HMI
10. Dalahoo 63/20 KV Substation, LVAC/DC, Protection and Control System :
Owner : ………………………………...………………..…….
Client : ……………………………….………………………….
Tavanir
Trans Post Pars
Abstract
Engine Control & Protection, Measuring and SCADA and AVR System Engineering (Basic
and Detail Design, Procurement, Panel Manufacturing, FAT.
System/Technology :
Cubicle : Fixed
Equipment : Schneider Electric/Siemens
SAMAN ENERGY
Company Profile 2012
|15
Automation Projects
In Hand Projects Cont…
11. Arghavan 63/20 KV Substation, Protection, Control, AC/DC System :
Owner : ………………………………...………………..…….
Client : ……………………………….………………………….
Tavanir
Darian Co.
Abstract
Control & Protection, Measuring and SCADA and AVR System Engineering (Basic and
Detail Design, Procurement, Panel Manufacturing, FAT.
System/Technology :
Cubicle : Fixed
Equipment : Schnider Electric
SAMAN ENERGY
Company Profile 2012
|16
Automation Field
In Service Projects
1. Sari Waste Water Treatment Plant, Control System :
Owner : ………………………………...………………..…….
Client : ……………………………….………………………….
Mazandaran Water & Wastewater Company
Sazeh Abi Co. (Consultant: SNC Canada)
Abstract
Engineering (Basic and Detail Design, Procurement, Panel Manufacturing, PLC
Programming, HMI Design, FAT, SAT, Commissioning
System/Technology :
PLC
HMI
Networking
Redundancy
:
:
:
:
Siemens SIMATIC S7-400
WinCC
Profibus/Industrial Ethernet
CPU/Communication/HMI
2. Jandar Combined Cycle Power Plant, Water Treatment Plant (WTP), MCC Switchgears. :
Owner : ………………………………...………………..…….
Client : ……………………………….………………………….
PEEGT (Syrian Power Generation Company)
Mapna MD2
Abstract
Engineering (Basic and Detail Design, Procurement, Panel Manufacturing, FAT, SAT,
Commissioning
System/Technology :
Cubicle : Cubic (Withdrawable)
Equipment : Schneider Electric
SAMAN ENERGY
Company Profile 2012
|17
Automation Field
In Service Projects Cont…
3. Jandar Combined Cycle Power Plant, Condensate Polishing Plant (CPP), MCC Switchgears. :
Owner : ………………………………...………………..…….
Client : ……………………………….………………………….
PEEGT (Syrian Power Generation Company)
Mapna MD2
Abstract
Engineering (Basic and Detail Design, Procurement, Panel Manufacturing, FAT, SAT,
Commissioning
System/Technology :
Cubicle : Cubic (Withdrawable)
Equipment : Schnider Electric
4. Abadan/Jahrom/Sanandaj Combined Cycle Power Plants, Auxiliary Boiler, Control System :
Owner : ………………………………...………………..…….
Client : ……………………………….………………………….
IPDC (Iran Power Development Company)
MAPNA MD2/Pakman
Abstract
Engineering (Basic and Detail Design, Procurement, Panel Manufacturing, PLC
Programming, HMI Design, FAT, SAT, Commissioning
System/Technology :
PLC :
HMI (Touch Panel) :
Networking :
Redundancy :
SAMAN ENERGY
Omron CPU 65H
WinCC Flexible
Profibus/Industrial Ethernet
CPU/Communication
Company Profile 2012
|18
Automation Field
In Service Projects Cont…
5. Pareh Sar And Tishreen Combined Cycle Power Plants, Auxiliary Boiler, Control System :
Owner : ………………………………...………………..…….
Client : ……………………………….………………………….
Pareh Sar GmbH (BOT Project)/PEEGT (Syrian Power
Generation Company)
Mapna MD2/Pakman
Abstract
Engineering (Basic and Detail Design, Procurement, Panel Manufacturing, FAT, SAT,
Commissioning
System/Technology :
PLC :
HMI (Touch Panel) :
Networking :
Redundancy :
Omron CPU 65H
WinCC Flexible
Profibus/Industrial Ethernet
CPU/Communication
6. Damavand/Yazd Combined Cycle Power Plants, Auxiliary Boiler, Control System :
Owner : ………………………………...………………..…….
Client : ……………………………….………………………….
IPDC (Iran Power Development Company)
MAPNA MD2/Pakman
Abstract
Engineering (Basic and Detail Design, Procurement, Panel Manufacturing, PLC
Programming, HMI Design, FAT, SAT, Commissioning
System/Technology :
PLC :
HMI (Touch Panel) :
Networking :
Redundancy :
SAMAN ENERGY
Omron CPU 65H
WinCC Flexible
Profibus/Industrial Ethernet
CPU/Communication
Company Profile 2012
|19
Automation Field
In Service Projects Cont…
7. Damavand Combined Cycle Power Plant, Main and Auxiliary Cooling System, Heat Tracing
System for units 1,…,6 :
Owner : ………………………………...………………..……. IPDC (Iran Power Development Company)
Client : ……………………………….………………………….
Mapna MD2/Niro Tavan
Abstract
Engineering (Basic and Detail Design, Procurement, Panel Manufacturing,
System/Technology :
System : Low Voltage Fixed Switchgears
8. LAVAN REFINERY UPGRADING & REVAMPING PROJECT OFFSITE UTILITY & STORAGE
TANK PROJECT, Condensate Polishing Plant (CPP), Control System :
Owner : ………………………………...………………..……. LAVAN OIL REFINING COMPANY
Client : ……………………………….………………………….
Iran General Contractor Co. (IGC)
Abstract
Engineering (Basic and Detail Design, Procurement, Panel Manufacturing, PLC
Programming, HMI Design, FAT, SAT, Commissioning
System/Technology :
PLC :
HMI :
Networking :
Redundancy :
SAMAN ENERGY
Siemens SIMATIC S7-400
Wincc
Profibus/Industrial Ethernet
CPU/Communication/HMI
Company Profile 2012
|20
Automation Field
In Service Projects Cont…
9. Tishreen Combined Cycle Power Plant, Condensate Polishing Plant (CPP), Control System :
Owner : ………………………………...………………..…….
Client : ……………………………….………………………….
PEEGT (Syrian Power Generation Company)
Mapna MD2
Abstract
Engineering (Basic and Detail Design, Procurement, Panel Manufacturing, PLC
Programming, HMI Design, FAT, SAT, Commissioning
System/Technology :
PLC :
HMI :
Networking :
Redundancy :
Siemens SIMATIC S7-300
WinCC (Touch Panel)
Profibus/Industrial Ethernet
CPU/Communication/HMI
10. Pareh sar Combined Cycle Power Plant, Water Treatment Plant (WTP), Control System :
Owner : ………………………………...………………..…….
Client : ……………………………….………………………….
Pareh Sar GmbH (BOT Project)
Mapna MD2
Abstract
Engineering (Basic and Detail Design, Procurement, Panel Manufacturing, PLC
Programming, HMI Design, FAT, SAT, Commissioning
System/Technology :
PLC :
HMI :
Networking :
Redundancy :
SAMAN ENERGY
Siemens SIMATIC S7-400
Wincc
Profibus/Industrial Ethernet
CPU/Communication/HMI
Company Profile 2012
|21
Automation Field
In Service Projects Cont…
11. Pareh sar Combined Cycle Power Plant, Electro chlorination System (ECP), Control System :
Owner : ………………………………...………………..…….
Client : ……………………………….………………………….
Pareh Sar GmbH (BOT Project)
Mapna MD2
Abstract
Engineering (Basic and Detail Design, Procurement, Panel Manufacturing, PLC
Programming, HMI Design, FAT, SAT, Commissioning
System/Technology :
PLC
HMI
Networking
Redundancy
:
:
:
:
Siemens SIMATIC S7-400
WinCC
Profibus/Industrial Ethernet
CPU/Communication/HMI
12. Nigeria 230/20KV Substation LVAC/DC, Protection and Control Systems :
Owner : ………………………………...………………..…….
Client : ……………………………….………………………….
Nigerian Power Distribution Company
Trans Post Pars.
Abstract
Engineering (Basic and Detail Design, Procurement, Panel Manufacturing, FAT, SAT,
Commissioning
System/Technology :
Cubicle : Fixed, Swing Type
Equipment : Schneider Electric/Siemens
SAMAN ENERGY
Company Profile 2012
|22
Automation Field
In Service Projects Cont…
13. Sangtoodeh PDB and 48 VDC Charger system :
Owner : ………………………………...………………..…….
Client : ……………………………….………………………….
Tajikestan Power Company
Trans Post Pars.
Abstract
Engineering (Basic and Detail Design, Procurement, Panel Manufacturing, FAT, SAT,
Commissioning
System/Technology :
Panel : Fixed, Swing Type
Equipment : Schnider Electric/ABB
14. Fars Gas Power Plant (2), Fuel Plant Control System :
Owner : ………………………………...………………..…….
Client : ……………………………….………………………….
Mapna MD2
Novin Fan Avar Ehya
Abstract
Engineering (Basic and Detail Design, Procurement, Panel Manufacturing, PLC
Programming, HMI Design, FAT, SAT, Commissioning
System/Technology :
PLC :
HMI (Touch Panel) :
Networking :
Redundancy :
SAMAN ENERGY
Siemens, S7 300, CPU 315 2DP
Wincc Flexible
Profibus/Industrial Ethernet
CPU:SW/Communication/HMI
Company Profile 2012
|23
Automation Field
In Service Projects Cont…
15. Jagin and Barantin Substation, Protection and Control Systems :
Owner : ………………………………...………………..…….
Client : ……………………………….………………………….
Tavanir
Trans Post Pars.
Abstract
Engineering (Basic and Detail Design, Procurement, Panel Manufacturing, FAT, SAT,
Commissioning
System/Technology :
Panel : Fixed, Swing Type
Equipment : Schnider Electric/Siemens
16. Besat and Mahshahr Substation, Protection and Control Systems :
Owner : ………………………………...………………..…….
Client : ……………………………….………………………….
Tavanir
Trans Post Pars.
Abstract
Engineering (Basic and Detail Design, Procurement, Panel Manufacturing, FAT, SAT,
Commissioning
System/Technology :
Panel : Fixed, Swing Type
Equipment : Schneider Electric/Siemens
SAMAN ENERGY
Company Profile 2012
|24
Automation Field
In Service Projects Cont…
17 Shirvan Combined Cycle Power Plant, Auxiliary Boiler, Control System :
Owner : ………………………………...………………..…….
Client : ……………………………….………………………….
IPDC (Iran Power Development Company)
Mapna MD2/Pakman (currently is hold by mapna)
Abstract
Engineering (Basic and Detail Design, Procurement, Panel Manufacturing, PLC
Programming, HMI Design, FAT, SAT, Commissioning
System/Technology :
PLC :
HMI (Touch Panel) :
Networking :
Redundancy :
Omron CPU 65H
Wincc Flexible
Profibus/Industrial Ethernet
CPU/Communication
18. Jandar Combined Cycle Power Plant, Auxiliary Boiler, Control System :
Owner : ………………………………...………………..…….
Client : ……………………………….………………………….
PEEGT (Syrian Power Generation Company)
Mapna MD2/Pakman
Abstract
Engineering (Basic and Detail Design, Procurement, Panel Manufacturing, PLC
Programming, HMI Design, FAT, SAT, Commissioning
System/Technology :
PLC :
HMI (Touch Panel) :
Networking :
Redundancy :
SAMAN ENERGY
Omron CPU 65H
Wincc Flexible
Profibus/Industrial Ethernet
CPU/Communication
Company Profile 2012
|25
Automation Field
In Service Projects Cont…
19. Sanandaj Combined Cycle Power Plant, Water Treatment Plant (WTP), Control System :
Owner : ………………………………...………………..…….
Client : ……………………………….………………………….
IPDC (Iran Power Development Company)
Mapna MD2/Novin Fan Avar Ehya.
Abstract
Engineering (Basic and Detail Design, Procurement, Panel Manufacturing, PLC
Programming, HMI Design, FAT, SAT, Commissioning
System/Technology :
PLC
HMI
Networking
Redundancy
:
:
:
:
Siemens SIMATIC S7-400
WinCC
Profibus/Industrial Ethernet
CPU/Communication/HMI
20. Abadan Combined Cycle Power Plant, Water Treatment Plant (WTP), Control System :
Owner : ………………………………...………………..…….
Client : ……………………………….………………………….
IPDC (Iran Power Development Company)
Mapna MD2/Aroon Ab.
Abstract
Engineering (Basic and Detail Design, Procurement, Panel Manufacturing, PLC
Programming, HMI Design, FAT, SAT, Commissioning
System/Technology :
PLC
HMI
Networking
Redundancy
SAMAN ENERGY
:
:
:
:
Siemens SIMATIC S7-400
WinCC
Profibus/Industrial Ethernet
CPU/Communication/HMI
Company Profile 2012
|26
Automation Field
In Service Projects Cont…
21. Esfahan-II Combined Cycle Power Plant, Water Treatment Plant (WTP), Control System :
Owner : ………………………………...………………..…….
Client : ……………………………….………………………….
IPDC (Iran Power Development Company)
Mapna MD2/Aroon Ab.
Abstract
Engineering (Basic and Detail Design, Procurement, Panel Manufacturing, PLC
Programming, HMI Design, FAT, SAT, Commissioning
System/Technology :
PLC
HMI
Networking
Redundancy
:
:
:
:
Siemens SIMATIC S7-400
WinCC
Profibus/Industrial Ethernet
CPU/Communication/HMI
22. Genaveh Combined Cycle Power Plant, Water Treatment Plant (WTP), Control System :
Owner : ………………………………...………………..…….
Client : ……………………………….………………………….
Genaveh Power Generation Company (BOO Project)
Mapna MD3
Abstract
Engineering (Basic and Detail Design, Procurement, Panel Manufacturing, PLC
Programming, HMI Design, FAT, SAT, Commissioning
System/Technology :
PLC
HMI
Networking
Redundancy
SAMAN ENERGY
:
:
:
:
Siemens SIMATIC S7-400
WinCC
Profibus/Industrial Ethernet
CPU/Communication/HMI
Company Profile 2012
|27
Automation Field
In Service Projects Cont…
23. Neka Combined Cycle Power Plant, Water Treatment Plant (WTP), Control System :
Owner : ………………………………...………………..…….
Client : ……………………………….………………………….
IPDC (Iran Power Development Company)
Mapna MD2/Shafab
Abstract
Engineering (Basic and Detail Design, Procurement, Panel Manufacturing, PLC
Programming, HMI Design, FAT, SAT, Commissioning
System/Technology :
PLC
HMI
Networking
Redundancy
:
:
:
:
Siemens SIMATIC S5
WinCC
Profibus/Industrial Ethernet
CPU/Communication/HMI
24. Yazd Combined Cycle Power Plant, Water Treatment Plant (WTP), Control System :
Owner : ………………………………...………………..…….
Client : ……………………………….………………………….
IPDC (Iran Power Development Company)
Mapna MD2/Shafab
Abstract
Engineering (Basic and Detail Design, Procurement, Panel Manufacturing, PLC
Programming, HMI Design, FAT, SAT, Commissioning
System/Technology :
PLC
HMI
Networking
Redundancy
SAMAN ENERGY
:
:
:
:
Siemens SIMATIC S5
WinCC
Profibus/Industrial Ethernet
CPU/Communication/HMI
Company Profile 2012
|28
Automation Field
In Service Projects Cont…
25. Kazeron Combined Cycle Power Plant, Water Treatment Plant (WTP), Control System :
Owner : ………………………………...………………..…….
Client : ……………………………….………………………….
IPDC (Iran Power Development Company)
Mapna MD2/Shafab
Abstract
Engineering (Basic and Detail Design, Procurement, Panel Manufacturing, PLC
Programming, HMI Design, FAT, SAT, Commissioning
System/Technology :
PLC
HMI
Networking
Redundancy
:
:
:
:
Siemens SIMATIC S5
WinCC
Profibus/Industrial Ethernet
CPU/Communication/HMI
26. Damavand Combined Cycle Power Plants, Water Treatment Plant (WTP), Control System :
Owner : ………………………………...………………..…….
Client : ……………………………….………………………….
IPDC (Iran Power Development Company)
Mapna MD2/Aroon Ab
Abstract
Engineering (Basic and Detail Design, Procurement, Panel Manufacturing, PLC
Programming, HMI Design, FAT, SAT, Commissioning
System/Technology :
PLC
HMI
Networking
Redundancy
SAMAN ENERGY
:
:
:
:
Siemens SIMATIC S7-400
WinCC
Profibus/Industrial Ethernet
CPU/Communication/HMI
Company Profile 2012
|29
Automation Field
In Service Projects Cont…
27. Kerman Combined Cycle Power Plant, Water Treatment Plant (WTP), Control System :
Owner : ………………………………...………………..…….
Client : ……………………………….………………………….
IPDC (Iran Power Development Company)
Mapna MD2
Abstract
Engineering (Basic and Detail Design, Procurement, Panel Manufacturing, PLC
Programming, HMI Design, FAT, SAT, Commissioning
System/Technology :
PLC
HMI
Networking
Redundancy
:
:
:
:
Siemens SIMATIC S7-400
WinCC
Profibus/Industrial Ethernet
CPU/Communication/HMI
28. Ramshir Gas Station Control System :
Owner : ………………………………...………………..…….
Client : ……………………………….………………………….
INGC
Patsa IND.
Abstract
Engineering (Basic and Detail Design, Procurement, Panel Manufacturing, PLC
Programming, HMI Design, FAT.
System/Technology :
PLC
HMI
Networking
Redundancy
SAMAN ENERGY
:
:
:
:
Siemens SIMATIC S7-300
WinCC
Profibus/Industrial Ethernet
CPU/Communication/HMI
Company Profile 2012
|30
Automation Field
In Service Projects Cont…
29. CNG Station Control System :
Owner : ………………………………...………………..…….
Client : ……………………………….………………………….
Pars Comperssor
Pars Comperssor
Abstract
Engineering (Basic and Detail Design, Procurement, Panel Manufacturing, PLC
Programming, HMI Design, FAT, SAT, Commissioning
System/Technology :
PLC : BECHOFF
HMI : BECHOFF
Networking : Profibus/Industrial Ethernet
30. Siri Gas Compression Station Control System :
Owner : ………………………………...………………..…….
Client : ……………………………….………………………….
PEDCO
PEDCO
Abstract
Engineering (Basic and Detail Design, Procurement, Panel Manufacturing, PLC
Programming, HMI Design, FAT, SAT, Commissioning
System/Technology :
PLC
HMI
Networking
Redundancy
SAMAN ENERGY
:
:
:
:
Siemens SIMATIC S7-400
WinCC
Profibus/Industrial Ethernet
CPU/Communication/HMI
Company Profile 2012
|31
Automation Field
In Service Projects Cont…
31. PVC, BD/SR, PP, LDPE, HDPE Cooling Tower Side Filteration Control System :
Owner : ………………………………...………………..…….
Client : ……………………………….………………………….
BIPC
Bina Co.
Abstract
Engineering (Basic and Detail Design, Procurement, Panel Manufacturing, PLC
Programming, HMI Design, FAT, SAT, Commissioning
System/Technology :
PLC
HMI
Networking
Redundancy
:
:
:
:
Siemens SIMATIC S7-300
WinCC
Profibus/Industrial Ethernet
CPU:SW/Communication/HMI
32. SUV Conveyor Control System :
Owner : ………………………………...………………..…….
Client : ……………………………….………………………….
Iran Khodro Khorasan
Khodro Sazi Binalod
Abstract
Engineering (Basic and Detail Design, Procurement, Panel Manufacturing, PLC
Programming, HMI Design, FAT, SAT, Commissioning
System/Technology :
PLC
HMI
Networking
Redundancy
SAMAN ENERGY
:
:
:
:
Siemens SIMATIC S7-400
WinCC
Profibus/Industrial Ethernet
CPU/Communication/HMI
Company Profile 2012
|32
Automation Field
In Service Projects Cont…
33. Zamiad Painting Line Control System :
Owner : ………………………………...………………..…….
Client : ……………………………….………………………….
Pars Khodro
Pars Khodro
Abstract
Engineering (Basic and Detail Design, Procurement, Panel Manufacturing, PLC
Programming, HMI Design, FAT, SAT, Commissioning
System/Technology :
PLC
HMI
Networking
Redundancy
:
:
:
:
Siemens SIMATIC S7-400
WinCC
Profibus/Industrial Ethernet
CPU/Communication/HMI
34. Abhar Train Production Line Control System :
Owner : ………………………………...………………..…….
Client : ……………………………….………………………….
Iran Khodro
Irico
Abstract
Engineering (Basic and Detail Design, Procurement, Panel Manufacturing, PLC
Programming, HMI Design, FAT, SAT, Commissioning
System/Technology :
PLC
HMI
Networking
Redundancy
SAMAN ENERGY
:
:
:
:
Siemens SIMATIC S7-400
WinCC
Profibus/Industrial Ethernet
CPU/Communication/HMI
Company Profile 2012
|33
Automation Field
In Service Projects Cont…
35. Mega Motor Data Center :
Owner : ………………………………...………………..…….
Client : ……………………………….………………………….
Mega Motor
Mabna Fan Avaran Rayaneh
Abstract
Engineering (Basic and Detail Design, Procurement, Panel Manufacturing, PLC
Programming, HMI Design, FAT, SAT, Commissioning
System/Technology :
PLC
HMI
Networking
Redundancy
:
:
:
:
Siemens SIMATIC S7-400
WinCC
Profibus/Industrial Ethernet
CPU/Communication/HMI
36. 206 montage Line Control System :
Owner : ………………………………...………………..…….
Client : ……………………………….………………………….
Iran Khodro Co.
TAM CO.
Abstract
Engineering (Basic and Detail Design, Procurement, Panel Manufacturing, FAT, SAT,
Commissioning
System/Technology :
PLC
HMI
Networking
Redundancy
SAMAN ENERGY
:
:
:
:
Siemens SIMATIC S7-400
WinCC
Profibus/Industrial Ethernet
CPU/Communication/HMI
Company Profile 2012
|34
Automation Field
In Service Projects Cont…
37. PK Line Control System Upgrade :
Owner : ………………………………...………………..…….
Client : ……………………………….………………………….
Saipa Co.
Saipa Co.
Abstract
Engineering (Basic and Detail Design, Procurement, Panel Manufacturing, FAT, SAT,
Commissioning
System/Technology :
PLC
HMI
Networking
Redundancy
:
:
:
:
Siemens SIMATIC S7-400
WinCC
Profibus/Industrial Ethernet
CPU/Communication/HMI
38. L90 Line :
Owner : ………………………………...………………..…….
Client : ……………………………….………………………….
Iran Khodro Co.
TAM CO.
Abstract
Engineering (Basic and Detail Design, Procurement, Panel Manufacturing, PLC
Programming, HMI Design, FAT, SAT, Commissioning
System/Technology :
PLC
HMI
Networking
Redundancy
SAMAN ENERGY
:
:
:
:
Siemens SIMATIC S7-400
WinCC
Profibus/Industrial Ethernet
CPU/Communication/HMI
Company Profile 2012
|35
Automation Field
In Service Projects Cont…
39. Syrian Samand (shom) Production Line Control System :
Owner : ………………………………...………………..…….
Client : ……………………………….………………………….
Iran Khodro
Saipa Co.
Abstract
Engineering (Basic and Detail Design, Procurement, Panel Manufacturing, PLC
Programming, HMI Design, FAT, SAT, Commissioning
System/Technology :
PLC
HMI
Networking
Redundancy
:
:
:
:
Siemens SIMATIC S7-400
WinCC
Profibus/Industrial Ethernet
CPU/Communication/HMI
40. Mashhad 3rd Water Treatment Plant, Control system :
Owner : ………………………………...………………..…….
Client : ……………………………….………………………….
Khorasan Rigional Water Company
Sazeh Abi
Abstract
Engineering (Basic and Detail Design, Procurement, Panel Manufacturing, PLC
Programming, HMI Design, FAT, SAT, Commissioning
System/Technology :
PLC
HMI
Networking
Redundancy
SAMAN ENERGY
:
:
:
:
Siemens SIMATIC S7-400
WinCC
Profibus/Industrial Ethernet
CPU/Communication/HMI
Company Profile 2012
|36
Automation Field
In Service Projects Cont…
41. SAHAND Thermal Power Plant Water Treatment Plant (WTP), Control system :
Owner : ………………………………...………………..…….
Client : ……………………………….………………………….
IPDC (Iran Power Development Company)
Mapna
Abstract
Engineering (Basic and Detail Design, Procurement, Panel Manufacturing, PLC
Programming, HMI Design, FAT, SAT, Commissioning
System/Technology :
PLC
HMI
Networking
Redundancy
:
:
:
:
Siemens SIMATIC S7-300
WinCC
Profibus/Industrial Ethernet
CPU/Communication/HMI
42. Maragheh WasteWater Treatment Plant, Control system :
Owner : ………………………………...………………..…….
Client : ……………………………….………………………….
Azarbayejan sharghi Water & Waste Water Company
Mahab Ghods Co.
Abstract
Engineering (Basic and Detail Design, Procurement, Panel Manufacturing, PLC
Programming, HMI Design, FAT, SAT, Commissioning
System/Technology :
PLC : Advantech Remote I/O
HMI : WinCC
Networking : RS 485
SAMAN ENERGY
Company Profile 2012
|37
Automation Field
In Service Projects Cont…
43. Lahijan Waste Water Treatment Plant, Control system :
Owner : ………………………………...………………..…….
Client : ……………………………….………………………….
Gilan Water & Waste Water Company
Iranab Co.
Abstract
Engineering (Basic and Detail Design, Procurement, Panel Manufacturing, PLC
Programming, HMI Design, FAT, SAT, Commissioning
System/Technology :
PLC
HMI
Networking
Redundancy
:
:
:
:
Siemens SIMATIC S7-300
WinCC
Profibus/Industrial Ethernet
CPU/Communication
44. Baneh Water Treatment Plant, Control system :
Owner : ………………………………...………………..…….
Client : ……………………………….………………………….
Kordestan Regional Water Company
Mahab Ghods Co.
Abstract
Engineering (Basic and Detail Design, Procurement, Panel Manufacturing, PLC
Programming, HMI Design, FAT, SAT, Commissioning
System/Technology :
PLC : Toshiba
Networking : RS 485
SAMAN ENERGY
Company Profile 2012
|38
Automation Field
In Service Projects Cont…
45. Loshan Water Treatment Plant, Control system :
Owner : ………………………………...………………..…….
Client : ……………………………….………………………….
Gilan Water & Waste Water Company
Iranab Co.
Abstract
Engineering (Basic and Detail Design, Procurement, Panel Manufacturing, PLC
Programming, HMI Design, FAT, SAT, Commissioning
System/Technology :
PLC
HMI
Networking
Redundancy
:
:
:
:
Siemens SIMATIC S7-400
WinCC
Profibus/Industrial Ethernet
CPU/Communication/HMI
46. Rasht Waste Water Treatment Plant, Control system :
Owner : ………………………………...………………..…….
Client : ……………………………….………………………….
Gilan Water & Waste Water Company
Iranab
Abstract
Engineering (Basic and Detail Design, Procurement, Panel Manufacturing, PLC
Programming, HMI Design, FAT, SAT, Commissioning
System/Technology :
PLC
HMI
Networking
Redundancy
SAMAN ENERGY
:
:
:
:
Siemens SIMATIC S7-300
WinCC
Profibus/Industrial Ethernet
CPU/Communication/HMI
Company Profile 2012
|39
Automation Field
In Service Projects Cont…
47. Banias Steam Power Plant, Water Treatment Plant (WTP), Control system (DCS) :
Owner : ………………………………...………………..…….
Client : ……………………………….………………………….
PEEGT (Syrian Power Generation Company)
Azarab Energy Co
Abstract
Engineering (Basic and Detail Design, Procurement, Panel Manufacturing, PLC
Programming, HMI Design, FAT, SAT, Commissioning
System/Technology :
PLC
HMI
Networking
Redundancy
:
:
:
:
ABB, AC800F
ABB, AC800F
Profibus/Industrial Ethernet
CPU/Communication/HMI
48. Esfahan Oil Refinery Co, 6th Boiler, Condensate Polishing Plant (CPP), Control system :
Owner : ………………………………...………………..…….
Client : ……………………………….………………………….
Esfahan Oil Refinery Co.
Azarab Co.
Abstract
Engineering (Basic and Detail Design, Procurement, Panel Manufacturing, PLC
Programming, HMI Design, FAT, SAT, Commissioning
System/Technology :
PLC
HMI
Networking
Redundancy
SAMAN ENERGY
:
:
:
:
Siemens SIMATIC S7-300
WinCC
Profibus/Industrial Ethernet
CPU/Communication/HMI
Company Profile 2012
|40
Automation Field
In Service Projects Cont…
49. Joybar Waste Water Treatment Plant, Control system :
Owner : ………………………………...………………..…….
Client : ……………………………….………………………….
Mazandaran Water & waste Water Co.
Jarf Tara
Abstract
Engineering (Basic and Detail Design, Procurement, Panel Manufacturing, PLC
Programming, HMI Design, FAT, SAT, Commissioning
System/Technology :
System : Conventional (Relay Based)
50. Torbat Hydarieh Waste Water Treatment Plant, Control system :
Owner : ………………………………...………………..…….
Client : ……………………………….………………………….
Khorasan Water & Waste Water Co.
Digab
Abstract
Engineering (Basic and Detail Design, Procurement, Panel Manufacturing, PLC
Programming, HMI Design, FAT, SAT, Commissioning
System/Technology :
PLC : Omron
HMI : WinCC
Networking : RS485
SAMAN ENERGY
Company Profile 2012
|41
Thank You