S.R. A1A SIDEWALK PROJECT
SR A1A Sidewalk
FPID 423630-2-52-01
Pre-Design
Public Information Meeting
July 13, 2011
Presented By:
Derek Dixon, FDOT
S.R. A1A SIDEWALK PROJECT
This meeting is being held to afford all citizens the right to understand the
project and comment on concerns to the Florida Department of
Transportation. The meeting is being held to comply with Title VI of the Civil
Rights Act of 1964, and Title VIII of the Civil Rights Act of 1968, as amended.
Public participation is solicited without regard to race, color, national origin,
age, sex, religion, disability or family status. Persons wishing to express their
concerns relative to FDOT compliance with Title VI and/or Title VIII may do so
by contacting the FDOT, District Five, Title VI and VIII Coordinator Lorie
Matthews, 719 South Woodland Boulevard, Deland, Florida 32720 or the
Florida Equal Opportunity Office, 605 Suwannee Street, Room 260, Mail Station
65, Tallahassee, FL 32399-0450. All inquiries or complaints will be
handled according to FDOT procedure and in an expeditious manner.
S.R. A1A SIDEWALK PROJECT
• Exhibit Review
• www.CFLROADS.com
• Slide Show Presentation
• One-on-One Questions and Answers
• Comment Cards
S.R. A1A SIDEWALK PROJECT
S.R. A1A SIDEWALK PROJECT
Pre-Design Phase
• Gathering Information
• Existing Right-Of-Way is Not Defined
• Working Closely With City of Cocoa Beach
• City Council Voted to Support Project
•
S.R. A1A SIDEWALK PROJECT
Proposed 8-ft Sidewalk on the East
Side of the Northbound Travel
Lanes From South 16th Street to
South 1st Street
S.R. A1A SIDEWALK PROJECT
S.R. A1A SIDEWALK PROJECT
• Proposed Swales From Edge of Pavement to Front of
Sidewalk
• No Right-Of-Way Acquisition
• Locate Existing Right-of-Way (Right-Of-Way Mapping)
• Existing Right-of-Way Will Need to be Cleared
• Parking
• Landscaping
S.R. A1A SIDEWALK PROJECT
Parking
Landscaping
S.R. A1A SIDEWALK PROJECT
Replace Existing 8-ft
Asphalt Path on the East
Side of the Roadway
From Orlando Avenue to
Wakulla Lane
S.R. A1A SIDEWALK PROJECT
S.R. A1A SIDEWALK PROJECT
• Maintain Existing Drainage
• Adjustment of Existing Inlets within Existing
Asphalt Path
• No Right-Of-Way Acquisition
S.R. A1A SIDEWALK PROJECT
• Lane Closures will be Restricted to Night Time
Hours
• Maximize Activity During Day Light Hours
• Existing Speed Limits Shall be Maintained
During Construction
• Maintain Property Access During
Construction
S.R. A1A SIDEWALK PROJECT
• Survey and Design Begin – Fall 2011
• Public Information Workshop – Spring 2012
• Final Plans – Spring 2013
• Advertising for Construction – Summer 2013
• Begin Construction – Fall 2013
S.R. A1A SIDEWALK PROJECT
Please turn in tonight or mail in by July 27th.
The mailing address is on the form.
S.R. A1A SIDEWALK PROJECT
Derek Dixon
FDOT, District 5
719 S. Woodland Blvd
Deland, Fl 32720
Office (386) 943-5547
[email protected]
Jeremy Dilmore, P.E.
FDOT, District 5
719 S. Woodland Blvd
Deland, Fl 32720
Office (386) 943-5544
[email protected]