TDAS-Tubular Design and Analysis System

Download Report

Transcript TDAS-Tubular Design and Analysis System

DEA 151: QUALCONN
Modernization of Connection Performance Properties
Drilling Engineering Association
Brian Schwind, PE
PPI Technology Services
P
P
I
TECHNOLOGY SERVICES
DEA 151
1
Introduction: Need
DEA 151
2
Introduction: Industry Need
1. Unknown Performance of Connections
•
Pipe Performance exceeding connection ratings
2. Supply Requirements: Competition
• Multi-source for meeting schedule requirements
3. Cost: Competition



As important as the tubular
Failure- Financial Loss
Liability- life and property
DEA 151
3
Introduction: Operator Experience
1. Failures are found two ways:
•
•
Laboratory- Rare for a test to go without performance issue
Field -Most costly / HSE implications
2. Operators have:



Totally Eliminated Field Failures through an integrated
Qualification Program
Program involves applying what was tested, running per test,
and applying within the limits of qualification
Independent verification of test results
DEA 151
4
Connection Reliability
Environment: Test Load
Envelope/ cycling, SLE, Failure
Points, Temperature
Installation: Torque,
RPM, Thread Compound
Application, running spec.
Manufacturing (Complete Specifications)
Foundation: Design Related (FEA, ISO 13679, Design Calcs)
Design: Test to Dimensional, Makeup, and Load Extremes
Database Provides Dimensional specifications.
 Run Per Specification, within Service Load Envelope
Qualification has Eliminated Failures!
DEA 151
5
Test Data: $50 Million invested
Product Line Qualification Tubing & Casing:
HPHT: Asia, Europe, North America
CRA: 13% Cr, 22% Cr, 28 Cr, C-276, high nickel
Deep Water: Large Diameter/ high rate wells
Cutting Edge and Conventional Wells
DEA 151
6
Connection Test Data
Casing Design: Detailed Graphical Results
DEA 151
7
Project Concern: Resolved
Concern
QUALCONN
ISO implication
Data Control BP-PPI Controlled Document Controlled Document
Confidentiality
Distributed via Suppliers
Performance
Normalization
Annex (Revised)
Presented in QUALCONN
Defining Minimum Req't
Repository
Product Line
Annex (Revised)
Referenced in QUALCONN
Repository- user defined Defining Minimum Req't
Annex (new)
Alternate Test Included on both a specimen
Defining Minimum Req't
and set basis
Procedures
DEA 151
8
Project Schedule:
Finalize Database Structure
Acquire test data
Coordinate Software
Coordinate Suppliers
Review/ authenticate data
Request additional data
QC QUALCONN /review
Finalize data presentation
DEA 151
Finalizing
June-November
June- December
June-December
June- December
September- December
October-December
November-January
9
Project Benefits
Short Term:
• Profit from $50 MM Testing performed over 15+ years
• Performance Options, Delivery Requirements
• Save Time: One Stop for Objective Connection Data
• Address Deepwater, Modern Performance Properties
Long Term:
• Network, Leverage, and Direct $7MM Product
Development Effort
• Upgrade Casing Design Program: Include Connectors
• Lower Procurement Cost/ Reduced Trouble Time
DEA 151
10
QUALCONN
Suppliers Objectives
Highly Leveraged Project Cost- Capture Learnings
Unified Customer Voice
Access to new markets- new users
Emphasize the importance of connection performance
Reliability Testing- Available to entire company-MEM
DEA 151
11
Operator Objectives
Save Money!
Quantify Connection Performance- Capture Learnings
Integrate into Well Design: Schlumberger/Landmark
Primary Cause of Failure- Eliminate!
Available to entire company-EPOM
Access to new sources- schedule & performance
Emphasize the importance of connection performance
Benefit from experience of others- do not re-invent the wheel!
DEA 151
12